Unofficial Notice of Invitation to Bid (NIB)

Alhambra City is seeking bids from qualified and interested contractors for the following project titled, Sewer Lift Station No.5 Replacement Project, identified under Solicitation ID: N2M25-154. Work is to be performed near 900 S New Ave, Alhambra, CA 91801, USA in Los Angeles County.

General Project Description

The project involves the replacement of Sewer Lift Station No. 5 in the City of Alhambra. The scope includes installing a new precast polymer wet well, valve vault, and bypass vault, along with associated mechanical equipment, appurtenances, electrical equipment, service upgrades, control, and instrumentation systems. Additionally, the project entails installing approximately 103 feet of 8-inch VCP gravity sewer pipe with three new precast polymer manholes, repurposing an existing dry well for emergency storage, and abandoning the existing wet well. The work encompasses all necessary labor, materials, equipment, and coordination as defined in the contract documents.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization / Demobilization
  • Quantity: 1  Unit: LS  Work Item: Perform pipe locating using non-destructive methods (GPR), pothole and survey existing utilities, submit pipe and potholing reports to city for approval
  • Quantity: 1  Unit: LS  Work Item: Provide a field construction survey prior to start of construction
  • Quantity: 1  Unit: LS  Work Item: Prepare and implement a traffic control plan signed/stamped by a California Licensed Traffic Engineer
  • Quantity: 1  Unit: LS  Work Item: Prepare a shoring plan signed/stamped by a California Licensed Structural Engineer
  • Quantity: 1  Unit: LS  Work Item: Prepare and implement a Storm Water Pollution Prevention Plan (SWPPP)
  • Quantity: 1  Unit: LS  Work Item: Remove and relocate existing street light in Clay Court and install new pull box per City of Alhambra standards (including conduit, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Remove existing hydrant and install new fire hydrant per City of Alhambra standards (including abandoning lateral, piping, fittings, valves, disinfection, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Remove and relocate existing community garden light pole (including re-feeding conduit, pull boxes, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Demolish and remove existing interfering surface elements (curb, gutter, sidewalk, asphalt, CMU wall, fence, vegetation)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new electrical service connection (including coordination with utility provider, shoring, excavation, fill, conduit, pull boxes, metering equipment, grounding, permitting, inspections, testing, final connection)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new 6’Ø x 23’ deep precast polymer concrete wet well, lid, ladder, and hatch (including coating, linings, penetrations, excavation, fill, compaction, shoring, grout)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new 10’(L)x6’(W)x5.5’(D) precast polymer concrete valve vault, lid, ladder, and hatch (including coating, linings, penetrations, excavation, fill, compaction, shoring, grout)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new 4’(L)x5’(W)x4.5’(D) precast polymer concrete bypass vault, lid, ladder, and hatch (including coating, linings, penetrations, excavation, fill, compaction, shoring, grout)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new standby pumping equipment, two (2) pumps, (1) spare 7.5HP, 150GPM, submersible non-clog sewage pump, motor, and cable, three (3) spare impellers, and two (2) seal fail relays
  • Quantity: 1  Unit: LS  Work Item: Furnish and install one (1) spare 7.5HP, 150GPM, submersible non-clog sewerage pump, motor, and cable (crated for long term storage), three (3) spare impellers, and two (2) seal fail relays
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new cast-in-place concrete generator and equipment pads (including rebar, concrete, anchor bolts, grout)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new pad-mounted generator (including anchorage, grounding, conductor, conduit)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install all electrical equipment and instrumentation (including fittings, conduits, conductors, grounding, MCC components, panelboards, arc flash study and report, integration, communication)
  • Quantity: 1  Unit: LS  Work Item: Demolish existing manholes and replace with new 60”Ø precast polymer concrete manholes (including coating, linings, penetrations, shoring, excavation, fill, compaction, temporary bypass, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new 48”Ø precast polymer concrete manhole (including coating, linings, penetrations, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 103  Unit: LF  Work Item: Furnish and install new 8-inch VCP gravity sewer piping and appurtenances (including fittings, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Coordinate with City of Alhambra Utilities Department for lift station start-up and testing using new bypass assembly, prior to connecting to existing 4” force main (including pressure testing, general equipment testing)
  • Quantity: 20  Unit: LF  Work Item: Furnish and install and tie-in new 4-inch HDPE force main to existing 4” force main (including piping, fittings, valves, temporary bypass, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Sand slurry fill existing 8” VCP to be abandoned in place
  • Quantity: 1  Unit: LS  Work Item: Prepare existing dry well for emergency storage (including salvaging existing equipment, installing overflow and return pipe penetrations, slide gate, patching, cleaning, coating)
  • Quantity: 1  Unit: EA  Work Item: Furnish and install new 2-inch service lateral for use on-site (including hose bib, water meter, fittings, valves, backflow preventer, disinfection, shoring, excavation, fill, compaction, trench, pavement restoration)
  • Quantity: 1  Unit: LS  Work Item: Furnish and install new Sch. 80 PVC irrigation lines and tie-in to existing lines (including piping, fittings, cement solvent, disinfection, shoring, excavation

NAICS Classification

237110 – Water and Sewer Line and Related Structures Construction, 238210 – Electrical Contractors and Other Wiring Installation Contractors, 238910 – Site Preparation Contractors, 237310 – Highway, Street, and Bridge Construction, 541330 – Engineering Services

Records and Due Date

This bid opportunity was entered into BidAmerica on January 30, 2026, and was last updated on January 30, 2026. All bids and/or proposals are due on March 12, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Alhambra City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Alhambra City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Alhambra City prior to bidding.

Sewer Lift Station No.5 Replacement Project - Bid Opportunity | BidAmerica