Unofficial Notice of Invitation to Bid (NIB)

Berkeley City is seeking bids from qualified and interested contractors for the following project titled, Sanitary Sewer Rehabilitation and Replacement - San Pablo Avenue, Sacramento Street, University Avenue, et al., identified under Solicitation ID: 26-11759-C. Work is to be performed near 1947 Center St 4th floor, Berkeley, CA 94704, USA in Alameda County.

General Project Description

This project involves the comprehensive rehabilitation and replacement of sanitary sewers throughout various locations in Berkeley. The scope includes point repairs, Cured-In-Place Pipe (CIPP) lining, pipe-bursting, and traditional open-trench methods for sanitary sewer pipes ranging from 4-inch to 24-inch in diameter. The project also entails the reconstruction of lower laterals with two-way cleanouts, installation of two-way cleanouts and lateral risers, connection of active laterals, and the removal and construction/rehabilitation of maintenance holes. Additional work covers traffic control, pre- and post-construction CCTV inspection, construction staking, site restoration (curb, gutter, sidewalk, driveway, pavement, landscaping), utility potholing, monument reconstruction/replacement, sewer bypass operations for larger mains, point repairs including root removal, plug and abandonment of existing sewer infrastructure, cold planing and hot mix asphalt resurfacing, pressure testing of sanitary sewer lines, leak isolation, and compliance with stormwater pollution control and sewage spill prevention requirements.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization/Demobilization
  • Quantity: 1  Unit: LS  Work Item: Traffic Control Plan
  • Quantity: 4  Unit: EA  Work Item: Lighted Message board
  • Quantity: 1  Unit: LS  Work Item: Pre-construction audio/video survey and distribution of public notices
  • Quantity: 9634  Unit: LF  Work Item: Pre-construction closed circuit television inspection and location of active house laterals
  • Quantity: 1  Unit: LS  Work Item: Construction staking and cutsheet
  • Quantity: 70  Unit: EA  Work Item: Rehabilitate existing maintenance hole or junction box
  • Quantity: 1  Unit: EA  Work Item: Construct std. MH and drop MH, Specifications: including lining, eccentric cones, all depths (Revocable)
  • Quantity: 1  Unit: EA  Work Item: Remove existing structure and construct lamphole or two-way cleanout, Specifications: all depths
  • Quantity: 340  Unit: LF  Work Item: Rehabilitation by Method "A" CIPP, Specifications: for maintaining pipe size from 15 to 15-inch pipe; includes point repair to correct sags
  • Quantity: 1420  Unit: LF  Work Item: Rehabilitation by Method "A" CIPP, Specifications: for maintaining pipe size from 21 to 21-inch pipe; includes point repair to correct sags
  • Quantity: 25  Unit: LF  Work Item: Rehabilitation by Method "B" Pipe Splitting or Other Comparable Method, Specifications: for Increasing Pipe Size From 4-inch to 4-inch, or 4-inch to 6-inch Diameter; Includes Point Repairs to Correct Sags
  • Quantity: 379  Unit: LF  Work Item: Rehabilitation by Method "B" Pipe Splitting or Other Comparable Method, Specifications: for Increasing Pipe Size From 6-inch to 6-inch, 6-inch to 8-inch, or 8-inch to 8-inch Diameter; Includes Point Repairs to Correct Sags
  • Quantity: 1877  Unit: LF  Work Item: Rehabilitation by Method "B" pipe splitting, reaming, or other comparable method, Specifications: for increasing pipe size from 8 to 10-inch, or 10-inch to 10-inch Diameter; Includes Point Repairs to Correct Sags
  • Quantity: 1048  Unit: LF  Work Item: Rehabilitation by Method "B" pipe splitting, reaming, or other comparable method, Specifications: for increasing pipe size from 10 to 12, or 12-inch to 12-inch Diameter; Includes Point Repair to Correct Sags
  • Quantity: 326  Unit: LF  Work Item: Rehabilitation by Method "B" pipe splitting, reaming, or other comparable method, Specifications: for increasing pipe size from 12 to 14, or 14-inch to 14-inch Diameter; Includes Point Repair to Correct Sags
  • Quantity: 317  Unit: LF  Work Item: Rehabilitation by Method "B" pipe splitting, reaming, or other comparable method, Specifications: for increasing pipe size from 15 to 18, or 18-inch to 18-inch Diameter; Includes Point Repair to Correct Sags
  • Quantity: 342  Unit: LF  Work Item: Rehabilitation by Method "B" pipe splitting, reaming, or other comparable method, Specifications: for increasing pipe size from 21 to 24, or 24-inch to 24-inch Diameter; Includes Point Repair to Correct Sags
  • Quantity: 534  Unit: LF  Work Item: Sewer construction and replacement by Method "C" Traditional Open Trench Method, Specifications: for increasing pipe size from 8 to 10-inch diameter, or 10-inch to 10-inch; Includes Point Repair for Sags
  • Quantity: 8  Unit: LF  Work Item: Sewer construction and replacement by Method "C" Traditional Open Trench Method, Specifications: for increasing pipe size from 10 to 12-inch diameter, or 12-inch to 12-inch; Includes Point Repair for Sags
  • Quantity: 1306  Unit: LF  Work Item: Sewer construction and replacement by Method "C" Traditional Open Trench Method, Specifications: for increasing pipe size from 18 or 21 to 24-inch diameter, or 24-inch to 24-inch; Includes Point Repair for Sags
  • Quantity: 4400  Unit: LF  Work Item: Lower lateral reconstruction, Specifications: typically 4-inch and 6-inch laterals
  • Quantity: 121  Unit: EA  Work Item: Installation of two-way cleanouts and lateral risers
  • Quantity: 170  Unit: EA  Work Item: Connection of active laterals, Specifications: to new or rehabilitated sewer main or MH
  • Quantity: 9634  Unit: LF  Work Item: Post-construction closed circuit television inspection and construction As-Built Drawings
  • Quantity: 13  Unit: LF  Work Item: Remove existing and construct standard curb and gutter
  • Quantity: 225  Unit: SF  Work Item: Remove existing, and construct standard sidewalk and driveway
  • Quantity: 25  Unit: EA  Work Item: Utility x-ings not shown and/or identified on the plans and not marked on street, length of x-ing <25 feet, Specifications: 1/2-6 inch diameter (Revocable)
  • Quantity: 10  Unit: EA  Work Item: Utility x-ings not shown and/or identified on the plans and not marked on street, length of x-ing <25 feet, Specifications: 6-24 inch diameter (Revocable)
  • Quantity: 5  Unit: EA  Work Item: Reconstruction/Replacement of City monuments (Revocable)
  • Quantity: 1  Unit: LS  Work Item: Supplemental Work, Specifications: $400,000
  • Quantity: 1  Unit: LS  Work Item: Caltrans Encroachment Permit/Authorization to work (Revocable)
  • Quantity: 1  Unit: EA  Work Item: Point (Spot) Repair
  • Quantity: 1  Unit: LS  Work Item: Plug and abandon existing sewer mains, sewer structure and laterals
  • Quantity: 39319  Unit: SF  Work Item: Cold Plane 0.2' Incl. HMA Type A (Revocable)
  • Quantity: 8  Unit: EA  Work Item: Pressure Testing Sanitary Sewer line
  • Quantity: 8  Unit: EA  Work Item: Isolate Leak (Allowance)
  • Quantity: 1  Unit: LS  Work Item: Sewer Rehabilitation (Allowance)

NAICS Classification

NAICS 237110 – Water and Sewer Line and Related Structures Construction, NAICS 237310 – Highway, Street, and Bridge Construction, NAICS 238910 – Site Preparation Contractors, NAICS 541330 – Engineering Services

Records and Due Date

This bid opportunity was entered into BidAmerica on December 16, 2025, and was last updated on December 27, 2025. All bids and/or proposals are due on January 6, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Berkeley City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Berkeley City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Berkeley City prior to bidding.

Sanitary Sewer Rehabilitation and Replacement - San Pablo Avenue, Sacramento Street, University Avenue, et al. - Bid Opportunity | BidAmerica