Burbank City is seeking bids from qualified and interested contractors for the following project titled, CHLORAMINE BOOSTING SYSTEMS FOR RESERVOIRS 1, 4, AND 5, identified under Solicitation ID: 1545. Work is to be performed near 275 E Olive Ave, Burbank, CA 91502, USA in Los Angeles County.
General Project Description
This project involves the construction of new Chloramine Boosting Systems at Reservoirs 1, 4, and 5 in the City of Burbank. The work includes demolition and disposal of existing trees, piping, and equipment; new grading and construction of retaining walls and CMU buildings to house the chloramine boosting system, on-site hypochlorite generation (OSHG) system, chemical storage tanks, chemical metering pump skids, total chlorine residual analyzers, and sample water recovery systems. It also includes the installation of double-contained chemical feed piping (underground and exposed), new sample pumps and mixers within the reservoirs, associated electrical equipment, programming, startup testing, commissioning of the facility, safety showers, water service piping, and other appurtenances as specified in the plans.
General Bid Items
- Quantity: 1 Unit: LS Work Item: Mobilization and Demobilization
- Quantity: 1 Unit: LS Work Item: Site Work - Reservoir 1 & 4
- Quantity: 1 Unit: LS Work Item: Site Work - Reservoir 5
- Quantity: 1 Unit: LS Work Item: Chemical Buildings Construction – Reservoirs 1 & 4
- Quantity: 1 Unit: LS Work Item: Chemical Buildings Construction – Reservoir 5
- Quantity: 1 Unit: LS Work Item: Mechanical Work for Reservoirs
- Quantity: 1 Unit: LS Work Item: Mechanical Piping, Valves and Appurtenances
- Quantity: 1 Unit: LS Work Item: HVAC System for Reservoirs 1, 4 and 5
- Quantity: 1 Unit: LS Work Item: On-site Sodium Hypochlorite Generation (OSHG) and Chemical Storage System
- Quantity: 1 Unit: LS Work Item: Reservoir Boosting System (Chemical Feed, Mixing and Sampling)
- Quantity: 1 Unit: LS Work Item: Electrical Work
- Quantity: 1 Unit: LS Work Item: Programming, Instrumentation and Controls
- Quantity: 1 Unit: LS Work Item: Start-up, Testing and Commissioning
NAICS Classification
NAICS 237110 – Water and Sewer Line and Related Structures Construction (Construction of water reservoirs, pumping systems, and related piping infrastructure)., NAICS 237990 – Other Heavy and Civil Engineering Construction (General site work, grading, retaining wall construction, and civil engineering aspects not covered by water/sewer specific NAICS)., NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors (Installation of electrical equipment, control panels, wiring, and general electrical work)., NAICS 238220 – Plumbing, Heating, and Air-Conditioning Contractors (Installation of mechanical piping, HVAC systems, safety showers, and associated appurtenances)., NAICS 333911 – Pump and Pumping Equipment Manufacturing (Specific to the chloramine boosting systems, sample pumps, and mixers)., NAICS 334513 – Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables (For instrumentation, controls, and SCADA integration).
Records and Due Date
This bid opportunity was entered into BidAmerica on January 31, 2026, and was last updated on January 31, 2026. All bids and/or proposals are due on February 4, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Burbank City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Burbank City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Burbank City prior to bidding.