Loading...
Unofficial Notice of Invitation to Bid (NIB)
Coachella Valley Water District is seeking bids from qualified and interested contractors for the following project titled, LIFT STATION 80-03 UPGRADE (COOK STREET), identified under Solicitation ID: 2022-19. Work is to be performed near 43200 Cook St, Palm Desert, CA 92211, USA in Riverside County.
General Project Description
This project involves the upgrade of Lift Station 80-03 on Cook Street. The scope includes the construction of a new sewer lift station with wet well pumps, piping, valves, and electrical components, a new CMU electrical building, and new standby generator with automatic transfer switch and load bank. It also requires the installation of new odor control equipment and associated electrical equipment. Existing wet well/dry pit will be converted/modified for emergency storage, including structural modifications and waterproofing. The project also encompasses mobilization, site demolition, removal of existing infrastructure, all associated civil, yard piping, mechanical, electrical work, along with testing, startup, commissioning, and project construction survey. Contractors must self-perform a minimum of 30% of the work.
General Bid Items
- Quantity: 1 Unit: LS Work Item: All-Risk Installation Floater (Insurance)
- Quantity: 1 Unit: LS Work Item: Mobilization and Demobilization (Mobilization of equipment, labor, tools, and materials)
- Quantity: 1 Unit: LS Work Item: Temporary Sewer Bypass Pumping (Including all labor, equipment, materials, bypass plan, emergency plan, piping, pumps, spill prevention, controls)
- Quantity: 1 Unit: LS Work Item: Excavation Safety Measures (Sheeting, shoring, bracing, safety plans per Cal/OSHA)
- Quantity: 1 Unit: LS Work Item: Stormwater Pollution Prevention Plan (SWPPP) and PM-10 Fugitive Dust Plan (Preparation, submittal, and implementation of plans)
- Quantity: 1 Unit: LS Work Item: Construction Staking (Developing and installing construction staking for lift station improvements)
- Quantity: 1 Unit: LS Work Item: Traffic Control (Preparation, submittal, and implementation of traffic control plans, including delineation, cones, barricades, flag persons, signs, public safety compliance)
- Quantity: 1 Unit: LS Work Item: Apply and Obtain Encroachment Permit from City of Palm Desert (All materials and labor for new concrete driveway construction)
- Quantity: 1 Unit: LS Work Item: Temporary Sewer Bypass Pumping (All labor, equipment, materials, and work for temporary pumping system)
- Quantity: 1 Unit: LS Work Item: Sitework Demolition and Removal (Stockpiling, hauling, disposal of excess material, imported fill, aggregate base, backfilling, over-excavation, compacting, testing)
- Quantity: 1 Unit: LS Work Item: Sitework Concrete (Construction of drainage features, curb and gutter, driveways, housekeeping pads, walkways)
- Quantity: 1 Unit: LS Work Item: Sitework Asphalt Concrete and Gravel (Asphalt concrete paving and placement of gravel, including prime coat, seal coat, edge support)
- Quantity: 1 Unit: LS Work Item: Fences and Gates (Fencing and gates, footings, posts, swing gates, replacement of existing chain-link)
- Quantity: 1 Unit: LS Work Item: Site Lighting, Security, and Wiring (Site lighting, security, wiring, light posts, sensors, entry alarms)
- Quantity: 1 Unit: LS Work Item: New SCE Electrical Service (New SCE electric service, primary and secondary conduit, transformer pad, grounding, pull boxes, bollards, retaining wall, meter CT cabinet, main service circuit breaker)
- Quantity: 1 Unit: LS Work Item: New CMU Electrical Building (New concrete masonry unit electrical building, reinforced concrete footings, slab on grade, equipment pads, doors, HVAC, roofing, protective coatings)
- Quantity: 1 Unit: LS Work Item: Electrical, Controls, and Instrumentation Equipment - Primary Wet Well (Electrical and instrumentation for primary wet well, including wiring, connections, control panels, VFDs, SCADA, level sensing equipment, pressure transducers, flow meters, pH and conductivity probes, check valve position switches, hatch alarms)
- Quantity: 1 Unit: LS Work Item: Emergency Generator (New emergency generator, fuel storage, reinforced concrete foundation and anchorage, automatic and manual transfer switches, resistive automatic load bank, concrete pad, wiring, controls, permitting)
- Quantity: 1 Unit: LS Work Item: Rehabilitate Wet Well and Dry Pit (Emergency Storage) (Structural improvements to existing wet well and dry pit, new 12-inch thick walls and floors, cleaning, removal of existing piping, cutting enlarged opening, plugging perforations, repair of existing concrete interior, new concrete walls and floors, installation of fibrous reinforced concrete)
- Quantity: 1 Unit: LS Work Item: Packaged Odor Control System (Installation of new packaged odor control system, reinforced concrete slab on grade, FRP vessel, biological/carbon media, exhaust fan, exhaust stack, water irrigation, grease filter, foul air piping, system control panel, controls, wiring)
- Quantity: 1 Unit: LS Work Item: 30-Inch Diameter VCP and 24-Inch Diameter PVC Gravity Sewer and Manholes (Installation of 30-inch diameter sewer gravity main, manholes, labor, materials, tools, equipment, connection to existing 36-inch diameter VCP sewer pipe, 24-inch diameter PVC sewer pipe, 72-inch diameter manholes, connection to primary wet well)
- Quantity: 1 Unit: LS Work Item: 18-Inch Diameter DI Forcemain (Below Grade) (Installation of 18-inch ductile iron forcemain, labor, materials, tools, equipment, connection to existing 30-inch diameter ductile iron forcemain, zinc coated ductile iron pipe and fittings, polyethylene encasement, restraints, thrust blocks, 18-inch diameter plug valve, line stop, hot-tap, fittings, above-grade 18-inch plug valve with handwheel)
- Quantity: 1 Unit: LS Work Item: Slope Stabilization (Improvements to existing front slope, protection of existing shrubs, trees, bushes, irrigation, removal of indicated items, filling low areas along fence, grading, decomposed granite, soil stabilizer)
- Quantity: 1 Unit: LS Work Item: Training and Operations Manuals (Staff training and preparation of operations manuals for new/rehabilitated facilities and equipment)
- Quantity: 1 Unit: LS Work Item: Record Drawings (Maintenance and submittal of project record drawings)
- Quantity: 1 Unit: LS Work Item: All Other Work (All labor, materials, tools, and equipment necessary to complete any and all other work not included in Bid Items 1-32, required for a complete and operable lift station system, piping, appurtenances, demolition, abandonment, cleanup, restoration of site improvements, and permits)
NAICS Classification
237110 – Water and Sewer Line and Related Structures Construction, 236220 – Commercial and Institutional Building Construction, 238210 – Electrical Contractors and Other Wiring Installation Contractors, 238910 – Site Preparation Contractors, 237310 – Highway, Street, and Bridge Construction, 335312 – Motor and Generator Manufacturing, 541330 – Engineering Services
Records and Due Date
This bid opportunity was entered into BidAmerica on January 9, 2026, and was last updated on January 8, 2026. All bids and/or proposals are due on February 24, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Coachella Valley Water District.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Coachella Valley Water District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Coachella Valley Water District prior to bidding.