El Dorado Irrigation District is seeking bids from qualified and interested contractors for the following project titled, Deer Creek Wastewater Treatment Plant Sinkhole Repair, identified under Solicitation ID: 25016.01 / E26-02. Work is to be performed near 2890 Mosquito Rd, Placerville, CA 95667, USA in El Dorado County.
General Project Description
The project involves relocating an existing recycled waterline and a belt press drain line to enable the backfill of a sinkhole at the Deer Creek Wastewater Treatment Plant. The scope includes furnishing all necessary labor, materials, equipment, services, permits, temporary controls, and construction facilities, as well as addressing general conditions and seismic requirements. Technical specifications cover concrete work and reinforcing steel, earth moving (including trench excavation, backfill, and compaction), and process interconnections utilizing gate valves. The contractor is responsible for all associated incidental work.
General Bid Items
- Quantity: 1 Unit: LS Work Item: Bonds and Insurance
- Quantity: 1 Unit: LS Work Item: Safety Plan and Programs
- Quantity: 1 Unit: LS Work Item: Mobilization and Demobilization
- Quantity: 1 Unit: LS Work Item: Water Pollution Control Plan
- Quantity: 1 Unit: LS Work Item: Site Safety and Permitting
- Quantity: 45 Unit: CY Work Item: Excavation and Haul -off
- Quantity: 100 Unit: CY Work Item: Import Fill
- Quantity: - Unit: CY Work Item: Rock Excavation
- Quantity: 56 Unit: LF Work Item: Existing RW Line Abandonment
- Quantity: 44 Unit: LF Work Item: Existing SD Line Abandonment
- Quantity: 20 Unit: LF Work Item: Existing Recycled Water Line Demo and Removal
- Quantity: 260 Unit: LF Work Item: Sawcut Pavement
- Quantity: 300 Unit: SF Work Item: Existing Concrete Removal
- Quantity: 300 Unit: SF Work Item: Existing AC Pavement Removal
- Quantity: 300 Unit: SF Work Item: Concrete Restoration
- Quantity: 300 Unit: SF Work Item: AC Pavement Restoration
- Quantity: 70 Unit: CY Work Item: Concrete Fill
- Quantity: 3 Unit: Each Work Item: Monitoring Vaults
- Quantity: 3 Unit: Each Work Item: Storm Drain Cleanouts
- Quantity: 43 Unit: LF Work Item: Rerouting of Utilities – 6” Storm Drain SDR-35 Pipe
- Quantity: 2 Unit: Each Work Item: Tie In For 6” Storm Drain
- Quantity: 76 Unit: LF Work Item: Rerouting of Utilities – 10” Recycled Water PVC C900 DR14 Pipe
- Quantity: 6 Unit: LF Work Item: Rerouting of Utilities – 6” Recycled Water PVC C900 DR14 Pipe
- Quantity: - Unit: - Work Item: Recycled Water MJ Sleeves
- Quantity: 1 Unit: LS Work Item: Recycled Water 10”x6” Tee Connection
- Quantity: 2 Unit: Each Work Item: Recycled Water 10” Insertion Valves
- Quantity: 1 Unit: Each Work Item: Recycled Water 6” Gate Valve
- Quantity: 3 Unit: Each Work Item: Tie In For Recycled Waterline
NAICS Classification
237110 – Water and Sewer Line and Related Structures Construction, 237990 – Other Heavy and Civil Engineering Construction, 238910 – Site Preparation Contractors, 238110 – Poured Concrete Foundation and Structure Contractors
Records and Due Date
This bid opportunity was entered into BidAmerica on February 25, 2026, and was last updated on February 25, 2026. All bids and/or proposals are due on March 24, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by El Dorado Irrigation District.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by El Dorado Irrigation District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from El Dorado Irrigation District prior to bidding.