Loading...

Unofficial Notice of Invitation to Bid (NIB)

El Monte City is seeking bids from qualified and interested contractors for the following project titled, Design, Supply, and Install Electric Vehicle (EV) Charging Stations, identified under Solicitation ID: -. Work is to be performed near 11333 Valley Blvd, El Monte, CA 91731, USA in Los Angeles County.

General Project Description

The City of El Monte is soliciting competitive proposals from qualified Contractors for the design, supply, and installation of electric vehicle (EV) charging stations to expand the City's EV charging infrastructure and support its Clean Mobility Nexus Project. The project involves the design, procurement, and installation of seven (7) dual-port Level 2 EV charging stations at four designated City locations and three (3) dual-port DC Level 3 Fast EV charging stations at the Public Works Yard, compatible with BYD 30-foot electric buses and other heavy-duty fleet vehicles. The scope includes comprehensive planning and design, permitting and compliance, utility coordination, site infrastructure construction (including civil work and electrical connections), equipment procurement and installation, commissioning, testing, inspections, training for City staff, provision of all required documentation and warranties, and a minimum of five years of continued maintenance and networking services. All work must comply with applicable federal, state, and local codes and regulations, including ADA accessibility guidelines.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Design and preparation of plans and specifications for the four (4) locations, including installation layout, civil and electrical plans, signage, and pavement markings.
  • Quantity: 1  Unit: LS  Work Item: Obtain all necessary permits and approvals; coordinate with utilities (Southern California Edison) and railroads (Union Pacific Railroad and Metrolink) and include any fees necessary to support successful connectivity services, including DigAlert (811) requirements.
  • Quantity: 1  Unit: LS  Work Item: Construct and install electrical conduits and electrical connections to supply power for the complete installation and operation of the EV chargers, including electrical panels, transformers, switchgear, and copper conductors (3-phase, 4-wire configuration typical).
  • Quantity: 1  Unit: LS  Work Item: Construct necessary infrastructure to support the installation and operation of the EV chargers, including site preparation, civil work (excavation, trenching, boring, ADA modifications, curb cuts, accessible signage), concrete pads, protective bollards, pavement/sidewalk/landscaping restoration, and localized grading.
  • Quantity: 7  Unit: DUAL-PORT LEVEL 2 EV CHARGING STATIONS  Work Item: Furnish and install. Specifications: Network-ready, Charge Point CP6000 preferred.
  • Quantity: 3  Unit: DUAL-PORT DC LEVEL 3 FAST CHARGING STATIONS  Work Item: Furnish and install. Specifications: Network-ready, ABB A400 preferred, compatible with BYD 30-foot electric buses and other similar electric medium- and heavy-duty fleet vehicles, tamper and vandalism prevention security design, over-current

NAICS Classification

NAICS 237990 – Other Heavy and Civil Engineering Construction (Site preparation and civil work, including excavation, trenching, boring, ADA modifications, concrete pads, bollard installation, pavement restoration, and localized grading/dirt removal)., NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors (Installation of electrical infrastructure, conduits, wiring, cable connections, electrical panels, transformers, switchgear, security system hardware, and power/communication connections for EV charging systems)., NAICS 541330 – Engineering Services (Planning and design, site layout, infrastructure design, future expansion planning, permitting and compliance coordination)., NAICS 423610 – Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers (Supply of EV charging stations, cables, and connectors)., NAICS 561210 – Facilities Support Services (Ongoing maintenance, network services, and operational support for EV charging stations over a five-year period).

Records and Due Date

This bid opportunity was entered into BidAmerica on February 23, 2026, and was last updated on February 23, 2026. All bids and/or proposals are due on March 3, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by El Monte City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by El Monte City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from El Monte City prior to bidding.

Design, Supply, and Install Electric Vehicle (EV) Charging Stations - Bid Opportunity | BidAmerica