Unofficial Notice of Invitation to Bid (NIB)

Elk Grove City is seeking bids from qualified and interested contractors for the following project titled, Laguna Creek Multi-Functional Corridor Project – Multi-Functional Corridor Project, identified under Solicitation ID: -. Work is to be performed near 8401 Laguna Palms Way, Elk Grove, CA 95758, USA in Sacramento County.

General Project Description

This project involves the construction of an approximately half-mile long multi-functional corridor along Laguna Creek in the City of Elk Grove, located between East Stockton Boulevard and Camden Park. The corridor will serve as maintenance access to Laguna Creek and a future pedestrian and bicycle trail. The work includes elevating the corridor by about 2 feet, constructing a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders, installing post-and-cable fencing, and erecting two prefabricated steel truss bridges with concrete decks. Additional features include two floodway excavation areas to offset floodplain encroachments and rock slope protection at creek embankments near bridge abutments to prevent scouring. The project will be constructed in two phases, with Phase I focusing on the maintenance access road, paved surface, bridges, and floodway excavation, and Phase II converting the access road to a Class 1 functional trail.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Construction Surveying
  • Quantity: 1  Unit: LS  Work Item: Clearing and Grubbing
  • Quantity: 1  Unit: LS  Work Item: Storm Water Pollution Prevention Plan Preparation and Implementation
  • Quantity: 4050  Unit: LF  Work Item: Fiber Roll
  • Quantity: 14400  Unit: SF  Work Item: Hydroseed, Specifications: Erosion Control Type 1
  • Quantity: 530000  Unit: SF  Work Item: Hydroseed, Specifications: Erosion Control Type 2
  • Quantity: 11500  Unit: LF  Work Item: Temporary High-Visibility Silt Fence
  • Quantity: 66800  Unit: SY  Work Item: Temporary Hydraulic Mulch
  • Quantity: 11000  Unit: LF  Work Item: Temporary Fiber Rolls
  • Quantity: 2  Unit: EA  Work Item: Temporary Construction Entrance
  • Quantity: 450  Unit: CY  Work Item: Trail Excavation
  • Quantity: 4970  Unit: CY  Work Item: Excavation Area 1
  • Quantity: 22000  Unit: CY  Work Item: Excavation Area 2
  • Quantity: 930  Unit: CY  Work Item: Class 2 Aggregate Base
  • Quantity: 440  Unit: TON  Work Item: Hot Mix Asphalt, Specifications: Type A
  • Quantity: 19  Unit: SY  Work Item: Cold Plane Asphalt Concrete Pavement
  • Quantity: 11700  Unit: SF  Work Item: Decomposed Granite
  • Quantity: 2560  Unit: SY  Work Item: Weed Intrusion Fabric
  • Quantity: 4700  Unit: LF  Work Item: Root Barrier
  • Quantity: 1  Unit: EA  Work Item: Remove Roadside Sign
  • Quantity: 5  Unit: EA  Work Item: Roadside Sign
  • Quantity: 4560  Unit: LF  Work Item: Post and Cable Fencing
  • Quantity: 34  Unit: LF  Work Item: Reinforced Concrete Pipe
  • Quantity: 1610  Unit: CY  Work Item: Rock Slope Protection, Specifications: 150LB, Class III, Method B
  • Quantity: 2420  Unit: SY  Work Item: Rock Slope Protection Fabric, Specifications: Class 8
  • Quantity: 1  Unit: LS  Work Item: Furnish Prefabricated Steel Truss, Specifications: Bridge B
  • Quantity: 1  Unit: LS  Work Item: Furnish Prefabricated Steel Truss, Specifications: Bridge C
  • Quantity: 1  Unit: LS  Work Item: Erect Prefabricated Steel Truss, Specifications: Bridge B
  • Quantity: 1  Unit: LS  Work Item: Erect Prefabricated Steel Truss, Specifications: Bridge C
  • Quantity: 1510  Unit: SF  Work Item: GRS - Integrated Bridge System, Specifications: Bridge B
  • Quantity: 1870  Unit: SF  Work Item: GRS - Integrated Bridge System, Specifications: Bridge C
  • Quantity: 4  Unit: EA  Work Item: Joint Cover Plate
  • Quantity: 53  Unit: CY  Work Item: Structural Concrete, Specifications: Bridge B
  • Quantity: 46  Unit: CY  Work Item: Structural Concrete, Specifications: Bridge C
  • Quantity: 3760  Unit: LB  Work Item: Bar Reinforcing Steel, Specifications: Bridge, Bridge B
  • Quantity: 3890  Unit: LB  Work Item: Bar Reinforcing Steel, Specifications: Bridge, Bridge C
  • Quantity: 646  Unit: SF  Work Item: Anti-Graffiti Coating
  • Quantity: 136  Unit: LF  Work Item: Metal Railing, Specifications: Bridge
  • Quantity: 1  Unit: LS  Work Item: Mobilization

NAICS Classification

Highway, Street, and Bridge Construction (Covers construction of roads, trails, bridges, asphalt paving, aggregate base, and related earthwork.), Other Heavy and Civil Engineering Construction (Encompasses multi-functional corridor development, storm water pollution prevention implementation, erosion control, rock slope protection, integrated bridge systems, and anti-graffiti coating.), Site Preparation Contractors (Includes clearing and grubbing, and general excavation for the corridor and floodway areas.), Engineering Services (Covers construction surveying.), Landscaping Services (Applicable for hydroseeding, hydraulic mulch, weed intrusion fabric, and root barrier as part of erosion control and habitat restoration.)

Records and Due Date

This bid opportunity was entered into BidAmerica on December 25, 2025, and was last updated on December 25, 2025. All bids and/or proposals are due on February 17, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Elk Grove City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Elk Grove City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Elk Grove City prior to bidding.

Laguna Creek Multi-Functional Corridor Project – Multi-Functional Corridor Project - Bid Opportunity | BidAmerica