Fresno Unified School District Purchasing is seeking bids from qualified and interested contractors for the following project titled, Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade, identified under Solicitation ID: 26-36. Work is to be performed near 540 E Cesar Chavez Blvd, Fresno, CA 93706, USA in Fresno County.

General Project Description

This project involves the replacement of two cooling water towers, installation of new condenser pumps, addition of drives, incorporation of sweep filtration, and an upgrade to the central plant energy management system at Edison High School. It includes associated demolition, painting, HVAC piping, electrical distribution, grounding systems, and Building Automation System (BAS) installations, along with comprehensive Storm Water Pollution Prevention Plan (SWPPP) implementation.

General Bid Items

  • Quantity: 2  Unit: Each  Work Item: Cooling Tower Replacement
  • Quantity: -  Unit: Each  Work Item: Condenser Pump Installation
  • Quantity: -  Unit: Each  Work Item: Drive Installation
  • Quantity: 1  Unit: Lump Sum  Work Item: Sweep Filtration System Installation
  • Quantity: 1  Unit: Lump Sum  Work Item: Central Plant Energy Management System Upgrade
  • Quantity: 1  Unit: Lump Sum  Work Item: Demolition and Removal of existing equipment, piping, ductwork, braces, supports, housekeeping pads, temperature controls
  • Quantity: 1  Unit: Lump Sum  Work Item: Painting of interior and exterior surfaces, shop-primed metal surfaces, and structural steel, per Division 09 specifications
  • Quantity: 1  Unit: Lump Sum  Work Item: HVAC Piping Installation, including galvanized steel pipe, copper pipe, valves, and specialties, with seismic restraints and supports per Division 23 specifications
  • Quantity: 1  Unit: Lump Sum  Work Item: Electrical Distribution and Grounding System Installation, including conduits, wiring, panelboards, switchboards, transformers, and disconnects per Division 26 specifications
  • Quantity: 1  Unit: Lump Sum  Work Item: Building Automation System (BAS) Installation, including network components, controllers, sensors, actuators, and associated wiring per Division 23 specifications
  • Quantity: 1  Unit: Lump Sum  Work Item: Storm Water Pollution Prevention Plan (SWPPP) Implementation, including Best Management Practices (BMPs), inspections, testing, and reporting

NAICS Classification

Plumbing, Heating, and Air-Conditioning Contractors (Installation and replacement of cooling towers, condenser pumps, and HVAC components)., Electrical Contractors and Other Wiring Installation Contractors (Installation of drives, central plant energy management system upgrades, and associated electrical work)., Commercial and Institutional Building Construction (General mechanical and electrical upgrades to a central plant in a school district)., Engineering Services (Architect/Engineer's estimate, design aspects of the EMS upgrade).

Records and Due Date

This bid opportunity was entered into BidAmerica on February 4, 2026, and was last updated on February 24, 2026. All bids and/or proposals are due on March 3, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Fresno Unified School District Purchasing.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Fresno Unified School District Purchasing. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Fresno Unified School District Purchasing prior to bidding.

Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade - Bid Opportunity | BidAmerica