Loading...
Fullerton School District - Public Works Construction Bids & RFP/Qs
Create a Free account to view ALL details and documentsNo credit card required
Save | Entry Date | Project Title | Solicitation ID | Bid Date | Time Remaining | Value | Files | Details |
|---|---|---|---|---|---|---|---|---|
02/04/2026 | Beechwood Elementary Project | FSD-25-26-BOND-03 | 03/18/2026 | 13 days left | ||||
02/06/2026 | Nstall 2 District Purchased Portable Classrooms, Replace 1 Portable Restroom With A District Purchase Restroom And Site Related Work | FSD-25-26-Bond-02 | 03/13/2026 | 8 days left | ||||
01/19/2026 | Installation Of 4 District Purchased Portable Buildings, Site Access Improvements & Install Fire Hydra | FSD-25-26-Bond-01 | 02/20/2026 | Expired | ||||
01/19/2026 | Lunch And Shade Structures - 5 Sites: Beechwood, Maple, Richman, Sunset Lane, Woodcrest. Removal Of Existing Structure Only At Beechwood (bw) & Woodcrest (wc), Path Of Travel Work And Misc. Work At All Sites. | FSD-25-26-Bond-04 | 02/17/2026 | Expired | ||||
11/08/2025 | 2026 Cupccaa Notice For Fullerton School District | N/A | 02/07/2026 | Expired | ||||
12/31/2025 | Provide Electrical, Fire Alarm, And Low-voltage Engineering Services For A New Modular Building Project | N/A | 01/26/2026 | Expired | ||||
01/08/2026 | Installation Of Electrical, Fire Alarm, And Low-voltage Engineering Services For A New Modular Building | FSD-26/27-GL-01 | 01/26/2026 | Expired | ||||
11/20/2025 | High Speed Point To Point Data Connection From Ocde To The District Office | 2026/2027-FSD.01 | 01/09/2026 | Expired | ||||
11/20/2025 | Fullerton School District Firewall, Network Cabling, Ups, Wireless Access Points And Edge Switching Equipment | 2026/2027-FSD.02 | 01/09/2026 | Expired |
9 Total ResultsPage 1 of 1
Show