Loading...

Unofficial Notice of Invitation to Bid (NIB)

Hacienda-La Puente School District is seeking bids from qualified and interested contractors for the following project titled, Bid 2025-26.06 Press Box Replacement Glen A. Wilson High School, identified under Solicitation ID: 2025-26.06. Work is to be performed near 16455 Wedgeworth Dr, La Puente, CA 91745, USA in Los Angeles County.

General Project Description

This project involves furnishing all labor, materials, equipment, and supervision required to install a prefabricated press box at the Glen A. Wilson High School stadium. The scope includes demolition and disposal of the existing press box, placement of the new prefabricated structure, installation of all necessary structural components, supports, anchorage, and connections, and coordination with manufacturer specifications and approved drawings. The work also encompasses complete electrical connections, lighting, power, data/communication rough-ins, and integration with existing utilities. All work must comply with applicable building codes, safety regulations, and school district standards, culminating in testing, inspections, and turnover of a fully functional, code-compliant press box ready for use.

General Bid Items

  • Quantity: -  Unit: -  Work Item: Demolition and disposal of existing press box.
  • Quantity: -  Unit: -  Work Item: Site preparation for the new prefabricated press box structure.
  • Quantity: -  Unit: -  Work Item: Placement of new prefabricated press box structure.
  • Quantity: -  Unit: -  Work Item: Installation of all required structural components, supports, anchorage, and connections.
  • Quantity: -  Unit: -  Work Item: Coordination with manufacturer’s specifications and approved drawings for press box installation.
  • Quantity: -  Unit: -  Work Item: Complete electrical connections, lighting, power, data/communication rough-ins.
  • Quantity: -  Unit: -  Work Item: Integration with existing utilities.
  • Quantity: -  Unit: -  Work Item: Compliance with applicable building codes, safety regulations, and school district standards.
  • Quantity: -  Unit: -  Work Item: Testing and inspections for a fully functional, code-compliant press box.
  • Quantity: -  Unit: -  Work Item: Turnover of a fully functional, code-compliant press box ready for use.
  • Quantity: -  Unit: -  Work Item: Soil compaction and fill, including material classification, density verification, lift thickness inspection, placement, and compaction testing as per DSA 103-22 S2.
  • Quantity: -  Unit: -  Work Item: Cast-in-place concrete work, including design mix verification, reinforcing steel sampling/testing, slump/air content testing, concrete temperature determination during placement, concrete strength testing, batch plant inspection, and reinforcing steel welding as per DSA 103-22 C1.
  • Quantity: -  Unit: -  Work Item: Prestressed/Post-Tensioned concrete work, including sampling/testing tendons/anchorages, inspecting tendon placement, verifying in-situ concrete strength prior to stressing, and inspecting application/grouting of forces as per DSA 103-22 C2.
  • Quantity: -  Unit: -  Work Item: Precast concrete work, including fabrication inspection, erection inspection, diaphragm connections/reinforcement inspection, and installation tolerances as per DSA 103-22 C3.
  • Quantity: -  Unit: -  Work Item: Shotcrete work, including placement technique inspection and sampling/testing shotcrete as per DSA 103-22 C4.
  • Quantity: -  Unit: -  Work Item: Post-installed anchors, including installation inspection and testing as per DSA 103-22 C5.
  • Quantity: -  Unit: -  Work Item: Structural steel, cold-formed steel, and aluminum work, including material identification/mill certificate verification, testing unidentified materials, seam weld examination (HSS shapes), and fabrication verification as per DSA 103-22 S/A1.
  • Quantity: -  Unit: -  Work Item: High-strength bolting, including verification of identification markings/manufacturer's certificates, testing bolts/nuts/washers, inspecting bearing-type connections, and inspecting pretensioned/slip-critical connections as per DSA 103-22 S/A2.
  • Quantity: -  Unit: -  Work Item: Welding (Shop and Field), including weld filler material verification, WPS/welder qualifications, inspection of various weld types (groove, multi-pass fillet, single pass fillet >5/16", plug, slot, single-pass fillet ≤5/16", floor/roof deck, end-welded studs, structural cold-formed steel, stairs/railing systems), and reinforcing steel weldability/welding as per DSA 103-22 S/A3, S/A4, S/A5.
  • Quantity: -  Unit: -  Work Item: Sprayed fire-resistant materials, including inspection of structural steel surfaces, application inspection, sampling, thickness measurement, compliance verification, density testing, and bond strength adhesion/cohesion testing as per DSA 103-22 S/A8.
  • Quantity: -  Unit: -  Work Item: Anchor bolts and anchor rods, including identification, sampling, testing, and verification of non-use of threaded rods for foundation anchorage as per DSA 103-22 S/A9.
  • Quantity: -  Unit: -  Work Item: Storage rack systems, including material compliance verification, inspection of fabricated elements, and installation of anchorage as per DSA 103-22 S/A10.
  • Quantity: -  Unit: -  Work Item: Site surveys conducted by a California-licensed civil engineer surveyor for construction, grading, and site work as required.

NAICS Classification

236220 – Commercial and Institutional Building Construction (General construction including demolition, erection of prefabricated structures, and overall project management for a school facility.), 238110 – Poured Concrete Foundation and Structure Contractors (Installation of structural components, supports, and anchorage, as well as cast-in-place deep foundations/piers, concrete retaining walls, and testing of reinforcing steel.), 238210 – Electrical Contractors and Other Wiring Installation Contractors (Complete electrical connections, lighting, power, data/communication rough-ins, and integration with existing utilities.), 238910 – Site Preparation Contractors (Demolition and disposal of the existing press box and site preparation for the new structure, including soil compaction and fill management.), 238120 – Structural Steel and Precast Concrete Contractors (Fabrication and installation of structural steel, cold-formed steel, aluminum components, and precast concrete members, including welding and high-strength bolting.)

Records and Due Date

This bid opportunity was entered into BidAmerica on February 11, 2026, and was last updated on February 26, 2026. All bids and/or proposals are due on March 12, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Hacienda-La Puente School District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Hacienda-La Puente School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Hacienda-La Puente School District prior to bidding.

Bid 2025-26.06 Press Box Replacement Glen A. Wilson High School - Bid Opportunity | BidAmerica