Unofficial Notice of Invitation to Bid (NIB)

Kern Community College District is seeking bids from qualified and interested contractors for the following project titled, Cerro Coso Community College Physical Education Complex Renovation Phase II Artificial Turf Installation, identified under Solicitation ID: -. Work is to be performed near 3000 College Heights Blvd, Ridgecrest, CA 93555, USA in Kern County.

General Project Description

This project involves the installation of approximately 6000 square feet of artificial turf and concrete curbing at the baseball and softball areas of the Cerro Coso Community College Sports Complex. Key work items include site inspection, existing conditions assessment, excavation, and subgrade preparation (removal of vegetation and debris, weed killer treatment, 3-4 inch excavation, 90%+ compaction, and drainage). Base material installation consists of a 3-4 inch compacted layer of 20mm crushed rock or Class II base, followed by a ½ inch compacted layer of 5mm crushed rock/crusher dust/DG. The synthetic turf installation requires specific product standards (e.g., TigerTurf Platinum Series or approved equal, 1.75" pile height, ≥ 80 oz/sq yd face weight, UV-stabilized polyethylene monofilament fibers, double-layer polypropylene/polyurethane/latex backing with perforations, ≥ 30 in/hr vertical drainage). Perimeter securing will involve concrete mow curbs (3,000 PSI concrete, with reinforcement). Reinforced concrete equipment pads, sand infill, and final cleanup are also required. The project emphasizes minimizing interference with college operations and maintaining existing buildings throughout construction.

General Bid Items

  • Quantity: 6500  Unit: Sqft  Work Item: Installation of Synthetic Turf (TigerTurf Platinum Series or approved equal). Specifications: Minimum pile height 1.75" (± 0.25"), face weight ≥ 80 oz/sq yd, total weight ≥ 100 oz/sq yd (including backing), UV-stabilized polyethylene monofilament fibers, polyethylene or polypropylene UV stabilized thatch layer, double-layer polypropylene primary backing, polyurethane or latex secondary backing with perforations, vertical drainage ≥ 30 in/hr, roll width 13-15 ft.
  • Quantity: -  Unit: LF  Work Item: Installation of Concrete Mow Curbs in areas 1B, 2E, and 2F. Specifications: 3,000 PSI concrete, ¾" aggregate, #3 rebar or 6x6 mesh OR fiber reinforcement, 6" width, 4" above grade, 4-6" below grade (total 8-10").
  • Quantity: 1  Unit: Ea  Work Item: Installation of Concrete Equipment Pad (Area 2D). Specifications: 10' x 35' x 6" thickness, ± ¼" tolerance, 3,500 PSI concrete, ¾" aggregate, rebar/mesh or fiber reinforcement, 4"-6" compacted base.
  • Quantity: 1  Unit: Ea  Work Item: Installation of Concrete Equipment Pad (Area 1A). Specifications: 6" minimum thickness, ± ¼" tolerance, 3,500 PSI concrete, ¾" aggregate, rebar/mesh or fiber reinforcement, 4"-6" compacted base.
  • Quantity: 1  Unit: LS  Work Item: Excavation & Subgrade Preparation. Specifications: Remove vegetation and debris, treat soil with weed killer, excavate 3-4 inches, compact subgrade to 90%+, ensure proper horizontal drainage.
  • Quantity: 1  Unit: LS  Work Item: Primary Base Layer Installation. Specifications: 20mm crushed rock or Class II base, 3-4 inches compacted.
  • Quantity: 1  Unit: LS  Work Item: Fine Base Layer Installation. Specifications: 5mm crushed rock/crusher dust/DG, ½ inch compacted.
  • Quantity: 1  Unit: LS  Work Item: Sand Infill. Specifications: Dry silica sand, 40–50% of pile height, apply in thin layers and brush in, optional additives.
  • Quantity: -  Unit: LS  Work Item: Interface with Turf and Finish Requirements.
  • Quantity: 1  Unit: LS  Work Item: Project Site Inspection and Existing Conditions/Utilities Assessment.
  • Quantity: 1  Unit: LS  Work Item: Final Cleanup.

NAICS Classification

NAICS 238990 – All Other Specialty Trade Contractors, NAICS 237310 – Highway, Street, and Bridge Construction, NAICS 238910 – Site Preparation Contractors, NAICS 238110 – Poured Concrete Foundation and Structure Contractors

Records and Due Date

This bid opportunity was entered into BidAmerica on December 5, 2025, and was last updated on December 12, 2025. All bids and/or proposals are due on December 17, 2025.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Kern Community College District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Kern Community College District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Kern Community College District prior to bidding.

Cerro Coso Community College Physical Education Complex Renovation Phase II Artificial Turf Installation - Bid Opportunity | BidAmerica