Loading...

Unofficial Notice of Invitation to Bid (NIB)

King City is seeking bids from qualified and interested contractors for the following project titled, 2025 CDBG Pavement Rehabilitation Project, identified under Solicitation ID: 2025-122. Work is to be performed near 212 S Vanderhurst Ave, King City, CA 93930, USA in Monterey County.

General Project Description

This pavement rehabilitation project, funded by a Community Development Block Grant (CDBG), involves work on several street segments within King City, California. The scope includes performing pavement digouts, adjusting utility covers (raising and lowering), cold planing of asphalt, placing Hot Mix Asphalt (HMA) leveling and surface courses, applying a cape seal (Type 2 Slurry Seal over Rubberized Chip Seal), and installing new striping and markings. All work must comply with applicable federal and state provisions.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization, Bonds & Insurance
  • Quantity: 1  Unit: LS  Work Item: Traffic Control
  • Quantity: 1  Unit: LS  Work Item: Water Pollution Control Program
  • Quantity: 62663  Unit: SF  Work Item: Cold Plane Asphalt – 2 Inches
  • Quantity: 33635  Unit: SF  Work Item: Cold Plane Asphalt – 3 Inches
  • Quantity: 131880  Unit: SF  Work Item: Cold Plane Asphalt – 8-1/2 inches
  • Quantity: 3300  Unit: SF  Work Item: 4" Digouts
  • Quantity: 753  Unit: TN  Work Item: 3/8" HMA Type A (PG64- 10)
  • Quantity: 8260  Unit: TN  Work Item: 1/2 HMA Type A (PG64- 10)
  • Quantity: 62663  Unit: SF  Work Item: Pavement Fabric
  • Quantity: 156510  Unit: SF  Work Item: Cape Seal
  • Quantity: 15  Unit: EA  Work Item: Adjust Manhole Covers
  • Quantity: 1  Unit: EA  Work Item: Adjust Sewer Cleanout
  • Quantity: 56  Unit: EA  Work Item: Adjust Water Valve Covers
  • Quantity: 2  Unit: EA  Work Item: Adjust Phone Vault Covers
  • Quantity: 1  Unit: EA  Work Item: Adjust Survey Monument Covers
  • Quantity: 18  Unit: EA  Work Item: Blue RPM Pavement Marker
  • Quantity: 775  Unit: LF  Work Item: 4" White Parking Stripe (Paint)
  • Quantity: 267  Unit: LF  Work Item: 12" White Line (Thermo)
  • Quantity: 673  Unit: LF  Work Item: 12" Yellow Crosswalk Line (Thermo)
  • Quantity: 89  Unit: LF  Work Item: Detail 21 Pavement Striping (Thermo)
  • Quantity: 4  Unit: EA  Work Item: “SCHOOL” Marking (Thermo)
  • Quantity: 4  Unit: EA  Work Item: “SLOW” Marking (Thermo)
  • Quantity: 1  Unit: EA  Work Item: Survey Monument Preservation
  • Quantity: 110  Unit: SF  Work Item: Prune Roots under Digouts

NAICS Classification

237310 – Highway, Street, and Bridge Construction (General pavement rehabilitation including cold planing, HMA courses, and surface treatments like slurry seal and chip seal, and pavement markings)., 238910 – Site Preparation Contractors (Performing digouts, roadway preparation, and root pruning prior to pavement work)., 237110 – Water and Sewer Line and Related Structures Construction (Adjusting and lowering existing utility facilities such as manhole covers, sewer cleanouts, water valve covers, and phone vault covers)., 237990 – Other Heavy and Civil Engineering Construction (Mobilization, traffic control, water pollution control program, and survey monument preservation).

Records and Due Date

This bid opportunity was entered into BidAmerica on December 31, 2025, and was last updated on February 4, 2026. All bids and/or proposals are due on February 5, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by King City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by King City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from King City prior to bidding.

2025 CDBG Pavement Rehabilitation Project - Bid Opportunity | BidAmerica