Unofficial Notice of Invitation to Bid (NIB)

Laguna Beach City is seeking bids from qualified and interested contractors for the following project titled, PROMENADE ON FOREST PERMANENT CONVERSION, identified under Solicitation ID: CIP 21-9972. Work is to be performed near 230 Forest Ave, Laguna Beach, CA 92651, USA in Orange County.

General Project Description

The project generally involves the demolition of existing roadway and sidewalk improvements, and the construction of a pedestrian promenade. This includes brick paving, decomposed granite, lighting, audio-visual systems, drainage improvements, a water feature, landscaping, and irrigation within the City of Laguna Beach. The contractor is responsible for furnishing all materials, equipment, tools, labor, and incidentals required to complete the work in accordance with the plans and specifications.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization/Demobilization
  • Quantity: 1  Unit: LS  Work Item: Caltrans Permit and Coordination
  • Quantity: 1  Unit: LS  Work Item: Water Pollution Control Plan Preparation and Implementation
  • Quantity: 1  Unit: LS  Work Item: Traffic and Pedestrian Control Plan Preparation
  • Quantity: 1  Unit: LS  Work Item: Traffic and Pedestrian Control Implementation
  • Quantity: 1  Unit: LS  Work Item: Construction Water
  • Quantity: 1975  Unit: SF  Work Item: Clear and Grub
  • Quantity: 1880  Unit: SY  Work Item: Remove and Dispose AC Pavement
  • Quantity: 8150  Unit: SF  Work Item: Remove and Dispose PCC Sidewalk
  • Quantity: 2100  Unit: SF  Work Item: Remove and Dispose Brick Sidewalk
  • Quantity: 400  Unit: SF  Work Item: Remove and Dispose Brick Crosswalk
  • Quantity: 190  Unit: LF  Work Item: Remove and Dispose PCC Curb
  • Quantity: 900  Unit: LF  Work Item: Remove and Dispose PCC Curb and Gutter
  • Quantity: 5  Unit: EA  Work Item: Remove and Dispose Sign
  • Quantity: 6  Unit: EA  Work Item: Remove and Dispose Concrete Bench
  • Quantity: 4  Unit: EA  Work Item: Remove and Salvage Street Light
  • Quantity: 2  Unit: EA  Work Item: Remove and Dispose SD Manhole
  • Quantity: 7  Unit: EA  Work Item: Remove and Dispose Metal Pole and Foundation
  • Quantity: 6  Unit: EA  Work Item: Remove and Deliver Planter Barrier to City Yard
  • Quantity: 1  Unit: EA  Work Item: Remove and Dispose Bike Rack
  • Quantity: 1  Unit: LS  Work Item: Remove and Dispose Storefront Drain Grate and Pipe
  • Quantity: 5  Unit: EA  Work Item: Remove and Dispose Tree
  • Quantity: 9  Unit: EA  Work Item: Remove and Dispose Catch Basin
  • Quantity: 2  Unit: EA  Work Item: Remove and Dispose Building Front Planter
  • Quantity: 2  Unit: EA  Work Item: Remove and Salvage Type 1-A Pole
  • Quantity: 2  Unit: EA  Work Item: Remove and Salvage Pedestrian Signal Head with Mounting
  • Quantity: 1  Unit: LS  Work Item: Remove and Dispose Wood Decks
  • Quantity: 2  Unit: EA  Work Item: Adjust Drinking Fountain to Grade
  • Quantity: 7  Unit: EA  Work Item: Adjust Water Valve to Grade
  • Quantity: 2  Unit: EA  Work Item: Adjust Catch Basin to Grade
  • Quantity: 2  Unit: EA  Work Item: Adjust 3” Area Drain to Grade
  • Quantity: 2  Unit: EA  Work Item: Adjust SD Manhole to Grade
  • Quantity: 1  Unit: EA  Work Item: Adjust Sewer Manhole to Grade
  • Quantity: 75  Unit: LF  Work Item: Cap and Abandon Storm Drain Line
  • Quantity: 16510  Unit: SF  Work Item: Construct Brick Herringbone Pavement
  • Quantity: 3590  Unit: SF  Work Item: Construct Laguna Crazy Quilt Pavement
  • Quantity: 670  Unit: SF  Work Item: Construct Crosswalk Brick Paving
  • Quantity: 150  Unit: LF  Work Item: Construct Crosswalk PCC Banding
  • Quantity: 3880  Unit: SF  Work Item: Construct Stabilized Decomposed Granite Paving
  • Quantity: 280  Unit: SF  Work Item: Construct Truegrid Reinforced Decomposed Granite Paving
  • Quantity: 2  Unit: EA  Work Item: Construct Curb Ramp Per Orange County Std. 1115
  • Quantity: 2  Unit: EA  Work Item: Construct Curb Ramp Per Caltrans Std. A88A
  • Quantity: 55  Unit: LF  Work Item: Construct Caltrans Type 60 Crash Barrier
  • Quantity: 210  Unit: LF  Work Item: Construct Curb and Gutter per Laguna Beach Std. 105
  • Quantity: 150  Unit: LF  Work Item: Construct 12” AC Slot Patch
  • Quantity: 1400  Unit: SF  Work Item: Construct AC Pavement Repair
  • Quantity: 1000  Unit: SF  Work Item: Seal Coat AC Pavement
  • Quantity: 1  Unit: LS  Work Item: Coast Highway Striping Repairs
  • Quantity: 5  Unit: EA  Work Item: Construct Storm Drain Catch Basin
  • Quantity: 464  Unit: LF  Work Item: Construct Trench Drain
  • Quantity: 45  Unit: LF  Work Item: Construct Rolled Curb and Gutter per Laguna Beach Std. Plan 106
  • Quantity: 26  Unit: LF  Work Item: Construct Rolled Curb and Gutter per Caltrans Std. Plan A87A
  • Quantity: 207  Unit: LF  Work Item: Construct Curb and Gutter per Caltrans Std. A87A
  • Quantity: 260  Unit: SF  Work Item: Construct Water Fountain PCC Pad
  • Quantity: 440  Unit: LF  Work Item: Furnish and Install 15” PVC Pipe
  • Quantity: 110  Unit: LF  Work Item: Furnish and Install 12” PVC Pipe
  • Quantity: 60  Unit: LF  Work Item: Furnish and Install 6” PVC Pipe
  • Quantity: 250  Unit: LF  Work Item: Furnish and Install 4” PVC Pipe
  • Quantity: 240  Unit: LF  Work Item: Connect Existing Roof Drain to Storm Drain
  • Quantity: 1  Unit: EA  Work Item: Construct Curb Inlet per Orange County Std. 1301
  • Quantity: 1  Unit: EA  Work Item: Construct Local Depression per Orange County Std. 1308
  • Quantity: 2  Unit: EA  Work Item: Construct Curb Inlet per Caltrans Std. D73D Type GT4
  • Quantity: 1  Unit: EA  Work Item: Construct Junction Structure per Caltrans Std. D91A
  • Quantity: 5  Unit: EA  Work Item: Construct Manhole per Orange County Std. 321-2-OC
  • Quantity: 1  Unit: LS  Work Item: Furnish and Install Silva Cell System
  • Quantity: 110  Unit: LF  Work Item: Furnish and Install ¾” Water Pipe
  • Quantity: 1032  Unit: LF  Work Item: Furnish and Install Steel Edging
  • Quantity: 344  Unit: LF  Work Item: Furnish and Install 36” Root Barrier
  • Quantity: 4  Unit: EA  Work Item: Furnish and Install Alcohol Sign
  • Quantity: 1  Unit: EA  Work Item: Furnish and Install Kelp Fountain
  • Quantity: 24  Unit: EA  Work Item: Furnish and Install 4” Bollard
  • Quantity: 12  Unit: EA  Work Item: Furnish and Install 4” Retractable Bollard
  • Quantity: 2  Unit: EA  Work Item: Furnish and Install Knox Box
  • Quantity: 13  Unit: EA  Work Item: Furnish and Install Tree Grate
  • Quantity: 6  Unit: EA  Work Item: Furnish and Install Trash and Recycling Receptacle
  • Quantity: 2  Unit: EA  Work Item: Furnish and Install Dog Litter Bag Carrier
  • Quantity: 2  Unit: EA  Work Item: Furnish and Install Bike Rack
  • Quantity: 5  Unit: EA  Work Item: Furnish and Install 8’ Linear Bench with Backrest
  • Quantity: 24  Unit: EA  Work Item: Furnish, Assemble, and Install 4- Top Table and Chairs
  • Quantity: 16  Unit: EA  Work Item: Furnish, Assemble, and Install 4- Top Cafe Table and Chairs
  • Quantity: 12  Unit: EA  Work Item: Furnish, Assemble, and Install 2- Top Cafe Table and Chairs
  • Quantity: 18  Unit: EA  Work Item: Furnish, Assemble, and Install Adirondack Chair
  • Quantity: 8  Unit: EA  Work Item: Furnish and Install Large Circular Planter
  • Quantity: 8  Unit: EA  Work Item: Furnish and Install Medium Circular Planter
  • Quantity: 12  Unit: EA  Work Item: Furnish and Install Umbrella and Base – Color A
  • Quantity: 6  Unit: EA  Work Item: Furnish and Install Umbrella and Base – Color B
  • Quantity: 4  Unit: EA  Work Item: Furnish and Install Umbrella With Heater and Power and Base – Color A
  • Quantity: 7  Unit: EA  Work Item: Furnish and Install Umbrella With Heater and Power and Base – Color B
  • Quantity: 1  Unit: EA  Work Item: Furnish and Install Quercus Virginiana (120-inch box specimen tree)
  • Quantity: 10  Unit: EA  Work Item: Install 48” City Furnished Eucalyptus Polyanthemos
  • Quantity: 2  Unit: EA  Work Item: Install 24” City Furnished Eucalyptus Polyanthemos
  • Quantity: 1320  Unit: EA  Work Item: Furnish and Install 1- Gallon Plant
  • Quantity: 403  Unit: EA  Work Item: Furnish and Install 5- Gallon Plant
  • Quantity: 140  Unit: EA  Work Item: Furnish and Install 15- Gallon Plant
  • Quantity: 5050  Unit: SF  Work Item: Construct Non-stabilized Decomposed Granite
  • Quantity: 1  Unit: LS  Work Item: Soil Preparation
  • Quantity: 1  Unit: LS  Work Item: Irrigation
  • Quantity: 1  Unit: LS  Work Item: SCE Coordination
  • Quantity: 1  Unit: LS  Work Item: Site Electrical and Power Supply
  • Quantity: 1  Unit: LS  Work Item: Site Lighting System
  • Quantity: 1  Unit: LS  Work Item: Site Camera System
  • Quantity: 1  Unit: LS  Work Item: Site WIFI System
  • Quantity: 1  Unit: LS  Work Item: Site Audio System
  • Quantity: 1  Unit: LS  Work Item: 36-Month Landscape Establishment and Maintenance
  • Quantity: 1  Unit: Stipulated  Work Item: Allowance for Unforeseen Underground ($100,000)

NAICS Classification

Highway, Street, and Bridge Construction, Site Preparation Contractors, Water and Sewer Line and Related Structures Construction, Electrical Contractors and Other Wiring Installation Contractors, Other Foundation, Structure, and Building Exterior Contractors, Other Building Finishing Contractors, All Other Specialty Trade Contractors, Landscaping Services

Records and Due Date

This bid opportunity was entered into BidAmerica on December 10, 2025, and was last updated on December 9, 2025. All bids and/or proposals are due on December 23, 2025.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Laguna Beach City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Laguna Beach City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Laguna Beach City prior to bidding.

PROMENADE ON FOREST PERMANENT CONVERSION - Bid Opportunity | BidAmerica