Loading...
Unofficial Notice of Invitation to Bid (NIB)
Modesto City High School District is seeking bids from qualified and interested contractors for the following project titled, E-RATE YR 2026 (YR29) CABLING INFRASTRUCTURE, identified under Solicitation ID: RFP #25-4840. Work is to be performed near 1717 Sylvan Ave, Modesto, CA 95355, USA in Stanislaus County.
General Project Description
This project involves the installation, repair, and testing of new cabling infrastructure, primarily focusing on Category 6A Unshielded Twisted Pair (UTP) cabling and Low Voltage Enclosures for data networks. The scope includes installation of Panduit power and communication poles, network jacks (including Category 6 and 6A), and ensuring all installations meet EIA/TIA TSB-155, National Electrical Code (NEC) 2017 (or most recent), and ANSI/TIA-568.0-D and 568.1-D telecommunications cabling standards. All work must use new materials, be performed by qualified technicians, and adhere to a 6-foot separation requirement from main power panels and switchgear for UTP cabling. The project spans multiple school sites within the Modesto City Schools district.
General Bid Items
- Quantity: - Unit: - Work Item: Installation of new Category 6A UTP cabling. Specifications: Use only new materials.
- Quantity: - Unit: - Work Item: Installation of Panduit (p/n PCPAxxR20EI) Power and Communication poles with specified power accessories. Quantity: (2) Standard per pole.
- Quantity: - Unit: - Work Item: Installation and/or repair of Category 6 data cables. Specifications: Network jacks to be BLUE.
- Quantity: - Unit: - Work Item: Installation and/or repair of Category 6A data cables.
- Quantity: - Unit: - Work Item: Testing of all installed cables and connections for end-to-end data connection. Specifications: Use EIA/TIA TSB-155 testing guidelines; digital test results to be provided as documentation.
- Quantity: - Unit: - Work Item: Installation of Low Voltage Enclosures.
- Quantity: - Unit: - Work Item: Cabling installations. Specifications: Must meet all local and other prevailing codes.
- Quantity: - Unit: - Work Item: Cabling installations by qualified technicians.
- Quantity: - Unit: - Work Item: UTP cabling installation. Specifications: Conform to a 6-foot separation requirement from main power panels, switchgear, and/or exact MDF/IDF locations.
- Quantity: - Unit: - Work Item: Testing of cabling plant. Specifications: Contractor responsible for supplying all required test equipment; auto-test specification to be used; overall pass/fail indication and date of test required; test reports to be submitted.
- Quantity: - Unit: - Work Item: Labeling of drops. Specifications: Each drop shall have a unique label throughout the site; handwritten labels are not acceptable.
NAICS Classification
NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors, NAICS 237130 – Power and Communication Line and Related Structures Construction
Records and Due Date
This bid opportunity was entered into BidAmerica on December 22, 2025, and was last updated on December 19, 2025. All bids and/or proposals are due on January 20, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Modesto City High School District.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Modesto City High School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Modesto City High School District prior to bidding.