Loading...

Unofficial Notice of Invitation to Bid (NIB)

Monterey City is seeking bids from qualified and interested contractors for the following project titled, Purchase & Resale Rehabilitation for 585 Laine St # 1, identified under Solicitation ID: CDBG P&R Rehabilitation (585-1). Work is to be performed near 585 Laine St, Monterey, CA 93940, USA in Monterey County.

General Project Description

This project involves the rehabilitation of an inclusionary housing unit located at 585 Laine St #1 in Monterey, utilizing Community Development Block Grant (CDBG) funds. The rehabilitation aims to preserve and enhance the quality, safety, and livability of affordable housing by addressing critical repairs and necessary upgrades. The scope of work primarily focuses on interior renovation, including replacing flooring, cabinetry, appliances, and fixtures; renovating the kitchen and bathroom for improved safety, functionality, and modern usability; and upgrading the electrical and plumbing systems to improve energy efficiency and extend the unit's service life.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization and Demobilization.
  • Quantity: 662  Unit: SF  Work Item: Replace interior flooring in main living areas, bedrooms and kitchen.
  • Quantity: 225  Unit: LF  Work Item: Install & paint new baseboards through the unit.
  • Quantity: 325  Unit: LF  Work Item: Paint door casings, window trim, sills and baseboards.
  • Quantity: 1  Unit: LS  Work Item: Clean, sand and prep all interior paintable surfaces, paint interior walls, ceilings and all paintable surfaces throughout the unit with low-VOC paint.
  • Quantity: 1  Unit: LS  Work Item: Repair or replace damaged drywall in hallways, bedrooms, bathroom and kitchen.
  • Quantity: 1  Unit: LS  Work Item: Clean and ensure the heater/furnace are in working condition.
  • Quantity: 3  Unit: LS  Work Item: Install 3 new doors (for bedrooms 1, 2, and bathroom).
  • Quantity: 3  Unit: LS  Work Item: Hardware for 3 new doors.
  • Quantity: 2  Unit: LS  Work Item: Install two sets of closet doors (for bedrooms 1 and 2).
  • Quantity: 1  Unit: LS  Work Item: Install new thermostat.
  • Quantity: 1  Unit: LS  Work Item: Replace 20 SF of kitchen countertops.
  • Quantity: 1  Unit: LS  Work Item: Replace all kitchen cabinetry.
  • Quantity: 1  Unit: LS  Work Item: Install new energy-efficient appliances.
  • Quantity: 1  Unit: LS  Work Item: Upgrade kitchen lighting fixture to energy-efficient LED model.
  • Quantity: 1  Unit: LS  Work Item: Install new kitchen sink & faucet and ensure all water lines are functional and leak-free.
  • Quantity: 1  Unit: LS  Work Item: Install new garbage disposal.
  • Quantity: 1  Unit: LS  Work Item: Install new shower head and handle.
  • Quantity: 1  Unit: LS  Work Item: Replace the damaged bathtub with a new shower stall and shower pan base.
  • Quantity: 1  Unit: LS  Work Item: Install new water-efficient toilet.
  • Quantity: 1  Unit: LS  Work Item: Install new vanity mirror.
  • Quantity: 1  Unit: LS  Work Item: Install new vanity.
  • Quantity: 1  Unit: LS  Work Item: Install new bathroom faucet and ensure all water lines are functional and leak-free.
  • Quantity: 1  Unit: LS  Work Item: Ensure proper ventilation, replace existing unit or install a fan if none exists.
  • Quantity: 1  Unit: LS  Work Item: Install new bathroom vanity light.
  • Quantity: 1  Unit: LS  Work Item: Install new medicine cabinet.
  • Quantity: 5  Unit: LS  Work Item: Install smoke/CO2 alarms through the unit.
  • Quantity: 3  Unit: LS  Work Item: Replace outdated outlets and switches; install GFCI outlets in wet areas.
  • Quantity: 5  Unit: LS  Work Item: Upgrade light fixtures throughout the unit.
  • Quantity: 1  Unit: LS  Work Item: Address any plumbing leaks or deficiencies identified.

NAICS Classification

Overall rehabilitation and renovation of a single-family residential unit, Painting of interior surfaces, door casings, window trim, sills, and baseboards, Replacement of interior vinyl plank flooring, Installation of new baseboards, kitchen cabinetry, and interior doors, Repair or replacement of damaged drywall, Upgrade electrical systems, install GFCI outlets, replace outdated outlets/switches, upgrade light fixtures, install smoke/CO2 alarms, Upgrade plumbing systems, install kitchen/bathroom fixtures, check/repair leaks, ensure heater/furnace working, ventilation

Records and Due Date

This bid opportunity was entered into BidAmerica on February 17, 2026, and was last updated on February 25, 2026. All bids and/or proposals are due on February 27, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Monterey City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Monterey City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Monterey City prior to bidding.

Purchase & Resale Rehabilitation for 585 Laine St # 1 - Bid Opportunity | BidAmerica