Napa City is seeking bids from qualified and interested contractors for the following project titled, Lincoln Avenue Traffic Safety & Paving Phase 1 - California Boulevard to Soscol Avenue, identified under Solicitation ID: 33ST23PW03. Work is to be performed near 955 School St, Napa, CA 94559, USA in Napa County.

General Project Description

This project involves the reconstruction of concrete sidewalks, curb ramps, curb and gutter, milling and hot mix asphalt (HMA) overlay with digouts, installation of new storm drain pipeline and inlets, traffic signal rewiring, fire hydrant relocation, new traffic striping, pavement markings, and signs along Lincoln Avenue from California Boulevard to Soscol Avenue. The scope includes earthwork, traffic control, material management, and extensive removal and replacement of existing infrastructure, ensuring compliance with California Standard Specifications and City standards.

General Bid Items

  • Quantity: 1  Unit: Lump Sum  Work Item: Mobilization
  • Quantity: 1  Unit: Lump Sum  Work Item: Control of Work
  • Quantity: 1  Unit: Lump Sum  Work Item: Construction Staking
  • Quantity: 1  Unit: Lump Sum  Work Item: Control of Materials
  • Quantity: 1  Unit: Lump Sum  Work Item: Progress Schedule
  • Quantity: 1  Unit: Lump Sum  Work Item: Water Pollution Control
  • Quantity: 1  Unit: Lump Sum  Work Item: Traffic Control
  • Quantity: 1  Unit: Lump Sum  Work Item: Pedestrian Control Plan
  • Quantity: 1  Unit: Lump Sum  Work Item: Clearing, Grubbing and Landscape Restoration
  • Quantity: 1  Unit: Lump Sum  Work Item: Lead Compliance
  • Quantity: 1  Unit: Lump Sum  Work Item: Remove Traffic Stripes, Pavement Markers and Pavement Markings
  • Quantity: 1  Unit: Lump Sum  Work Item: Earthwork
  • Quantity: 1  Unit: Lump Sum  Work Item: Potholing
  • Quantity: 3027  Unit: Linear Feet  Work Item: Remove and Dispose Curb & Gutter
  • Quantity: 21554  Unit: Square Feet  Work Item: Remove and Dispose of Concrete Flatwork
  • Quantity: 74863  Unit: Square Feet  Work Item: Remove and Dispose of AC Pavement
  • Quantity: 1  Unit: Lump Sum  Work Item: Remove and Dispose Concrete Footing
  • Quantity: 3  Unit: Each  Work Item: Remove and Dispose Drain Inlet
  • Quantity: 70  Unit: Linear Feet  Work Item: Remove and Dispose Storm Drain Pipe
  • Quantity: 379253  Unit: Square Feet  Work Item: Cold Plane Asphalt Concrete
  • Quantity: 75  Unit: Linear Feet  Work Item: Remove Wooden Fence
  • Quantity: 1  Unit: Each  Work Item: Remove Electrical Vault
  • Quantity: 18  Unit: Each  Work Item: Remove Crosswalk Lighting Fixture
  • Quantity: 13  Unit: Each  Work Item: Remove Traffic Detection Loops
  • Quantity: 2  Unit: Each  Work Item: Remove Fire Hydrant
  • Quantity: 3  Unit: Each  Work Item: Remove Pedestrian Barricade
  • Quantity: 15  Unit: Each  Work Item: Remove Traffic Sign
  • Quantity: 15  Unit: Each  Work Item: Remove Street Signpost
  • Quantity: 14365  Unit: Square Feet  Work Item: Sidewalk (S-4)
  • Quantity: 4021  Unit: Square Feet  Work Item: Driveway (S-5)
  • Quantity: 1840  Unit: Linear Feet  Work Item: Curb & 12" Gutter
  • Quantity: 449  Unit: Linear Feet  Work Item: A1-6 Curb
  • Quantity: 621  Unit: Square Feet  Work Item: Bike Lane Pavement
  • Quantity: 2702  Unit: Square Feet  Work Item: Vehicular Concrete Pavement
  • Quantity: 269  Unit: Square Feet  Work Item: Reinforced Concrete Flatwork
  • Quantity: 25  Unit: Linear Feet  Work Item: Reinforced Curb & Gutter
  • Quantity: 42  Unit: Linear Feet  Work Item: Retaining Wall
  • Quantity: 1  Unit: Lump Sum  Work Item: Knee Wall
  • Quantity: 1  Unit: Lump Sum  Work Item: Repair Handrail
  • Quantity: 1  Unit: Lump Sum  Work Item: Modify Wooden Fence
  • Quantity: 22  Unit: Each  Work Item: Curb Ramp -Case A
  • Quantity: 2  Unit: Each  Work Item: Curb Ramp -Case B
  • Quantity: 2  Unit: Each  Work Item: Curb Ramp -Case C
  • Quantity: 1  Unit: Each  Work Item: Double Curb Ramp
  • Quantity: 1  Unit: Each  Work Item: Reinforced Curb Ramp
  • Quantity: 70  Unit: Square Feet  Work Item: Install Detectable Warnings
  • Quantity: 120  Unit: Linear Feet  Work Item: Install Detectable Directional Wayfinding Tiles
  • Quantity: 2  Unit: Each  Work Item: Bus Pad
  • Quantity: 1  Unit: Lump Sum  Work Item: Crack Seal
  • Quantity: 379253  Unit: Square Feet  Work Item: Paving Fabric
  • Quantity: 2370  Unit: Tons  Work Item: HMA Leveling Course
  • Quantity: 4741  Unit: Tons  Work Item: RHMA Overlay
  • Quantity: 2662  Unit: Tons  Work Item: HMA Plug
  • Quantity: 5  Unit: Each  Work Item: SD Catch Basin (D -2)
  • Quantity: 1  Unit: Each  Work Item: SD Drain Inlet (G0)
  • Quantity: 3  Unit: Each  Work Item: SD Manhole (48")
  • Quantity: 2  Unit: Each  Work Item: SD Manhole (60")
  • Quantity: 53  Unit: Linear Feet  Work Item: Reinforced Concrete Pipe (10")
  • Quantity: 81  Unit: Linear Feet  Work Item: Reinforced Concrete Pipe (12")
  • Quantity: 12  Unit: Linear Feet  Work Item: Reinforced Concrete Pipe (30")
  • Quantity: 19  Unit: Linear Feet  Work Item: HDPE Storm Pipe (12")
  • Quantity: 8  Unit: Each  Work Item: Undersidewalk Drain (Residential)
  • Quantity: 1  Unit: Each  Work Item: Undersidewalk Drain (Commercial)
  • Quantity: 23  Unit: Each  Work Item: Adjust Structure to Grade -SSMH
  • Quantity: 17  Unit: Each  Work Item: Adjust Structure to Grade -SDMH
  • Quantity: 1  Unit: Each  Work Item: Adjust Structure to Grade -MH- Communications
  • Quantity: 84  Unit: Each  Work Item: Adjust Structure to Grade -G5
  • Quantity: 1  Unit: Each  Work Item: Adjust Structure to Grade -Meter Box
  • Quantity: 2  Unit: Each  Work Item: Adjust Structure to Grade - Gas Valve Cover
  • Quantity: 1  Unit: Lump Sum  Work Item: Traffic Signal Phase Wiring
  • Quantity: 1  Unit: Each  Work Item: Raise Fire Hydrant
  • Quantity: 1  Unit: Each  Work Item: Relocate Fire Hydrant
  • Quantity: 1  Unit: Each  Work Item: Water Meter
  • Quantity: 2  Unit: Each  Work Item: Changeable Message Board Signs
  • Quantity: 4  Unit: Each  Work Item: Rectangular Rapid Flashing Beacons
  • Quantity: 32184  Unit: Linear Feet  Work Item: Thermoplastic Striping
  • Quantity: 12278  Unit: Square Feet  Work Item: Thermoplastic Markings
  • Quantity: 9551  Unit: Square Feet  Work Item: Green MMA Pavement Markings
  • Quantity: 1478  Unit: Linear Feet  Work Item: Curb Paint
  • Quantity: 450  Unit: Each  Work Item: Raised Reflective Pavement Marker
  • Quantity: 3  Unit: Each  Work Item: Q Marker
  • Quantity: 22  Unit: Each  Work Item: K71 Bollard
  • Quantity: 29  Unit: Each  Work Item: Signpost
  • Quantity: 6  Unit: Each  Work Item: Pedestrian Barricade
  • Quantity: 77  Unit: Each  Work Item: Street Sign
  • Quantity: 3  Unit: Each  Work Item: Remove and Dispose Tree
  • Quantity: 32  Unit: Each  Work Item: Tree Planting

NAICS Classification

237310 – Highway, Street, and Bridge Construction (Primary for paving, traffic safety, and general roadwork), 237110 – Water and Sewer Line and Related Structures Construction (For storm drain, fire hydrant, and water meter work), 237130 – Power and Communication Line and Related Structures Construction (For traffic signal rewiring and electrical components), 238910 – Site Preparation Contractors (For clearing, grubbing, earthwork, and disposal), 238110 – Poured Concrete Foundation and Structure Contractors (For concrete flatwork, sidewalks, curb ramps, foundations)

Records and Due Date

This bid opportunity was entered into BidAmerica on February 20, 2026, and was last updated on March 2, 2026. All bids and/or proposals are due on March 19, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Napa City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Napa City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Napa City prior to bidding.

Lincoln Avenue Traffic Safety & Paving Phase 1 - California Boulevard to Soscol Avenue - Bid Opportunity | BidAmerica