Riverside City is seeking bids from qualified and interested contractors for the following project titled, HSIP Cycle XI Improvements - New Raised Median and High Friction Surface Treatment on Mission Inn Avenue Between Redwood Drive and Scout Lane Project, identified under Solicitation ID: 8184. Work is to be performed near 3900 Main St, Riverside, CA 92501, USA in Riverside County.

General Project Description

This project involves Highway Safety Improvement Program (HSIP) Cycle XI improvements on Mission Inn Avenue, specifically between Redwood Drive and Scout Lane. The scope includes constructing a new raised median, performing grind and asphalt overlay, and applying a High Friction Surface Treatment (HFST). Additionally, the project entails installing new signing and striping, and replacing existing detector loops at the signalized intersection of Mission Inn Avenue and Redwood Drive.

General Bid Items

  • Quantity: -  Unit: CY  Work Item: Unclassified Excavation (Includes removal of unsuitable AC, base, and/or subgrade material, lawful disposal, grading, compaction, traffic control, and cleanup).
  • Quantity: -  Unit: CY  Work Item: Import Fill (Includes hauling, grading, and compaction).
  • Quantity: -  Unit: TON  Work Item: Asphalt Concrete Pavement (Includes all labor, tools, equipment, materials, and traffic control to place and compact asphalt concrete).
  • Quantity: -  Unit: SY  Work Item: High Friction Surface Treatment (HFST) (Includes all labor, materials, tools, equipment, and incidentals for application).
  • Quantity: -  Unit: -  Work Item: Asphalt Rubber Aggregate Membrane (ARAM)
  • Quantity: -  Unit: EA  Work Item: Install Sign with Post
  • Quantity: -  Unit: EA  Work Item: Install Sign (No Post)
  • Quantity: -  Unit: EA  Work Item: Remove Sign
  • Quantity: -  Unit: EA  Work Item: Relocate Sign
  • Quantity: -  Unit: SF  Work Item: Pavement Marking and Legends Removal and Fog Seal
  • Quantity: -  Unit: SF  Work Item: Traffic Striping Removal and Fog Seal
  • Quantity: -  Unit: -  Work Item: Thermoplastic Traffic Striping
  • Quantity: -  Unit: LF  Work Item: Pavement Marking and Legends (Thermo)
  • Quantity: -  Unit: LF  Work Item: Painted Red Curb
  • Quantity: -  Unit: EA  Work Item: Type E Detector Loops
  • Quantity: -  Unit: EA  Work Item: Conductor Splicing (New to existing conductors)
  • Quantity: -  Unit: EA  Work Item: Delineators
  • Quantity: -  Unit: EA  Work Item: Median Nose Signs (City Std. Dwg No. 666)
  • Quantity: -  Unit: SF  Work Item: Construct 4" Thick Colored Stamped Concrete at Median (Includes sealer, antiquing agents, colored-release agents, construction joints, joint filler, soil excavation, disposal, and compaction).
  • Quantity: -  Unit: LF  Work Item: Construct 8" CF Curb Type II, City Standard Dwg. No. 200 (Includes reconstruction and matching of existing dimensions and steel reinforcement).
  • Quantity: -  Unit: LF  Work Item: Construct 8" CF Curb & Gutter Type I, City Standard Dwg. No. 200.
  • Quantity: -  Unit: LF  Work Item: Construct Gutter, Detail A.
  • Quantity: -  Unit: EA  Work Item: Adjust Storm Drain Manhole to Grade.
  • Quantity: -  Unit: EA  Work Item: Adjust Water Valve to Grade (Includes all labor, tools, equipment, and materials for utility adjustment).
  • Quantity: -  Unit: EA  Work Item: 36" Yellow Surface Mount 2" Diameter Delineators with Yellow Reflective Tape.
  • Quantity: 1  Unit: LS  Work Item: Traffic Control, Construction Phasing, and Public Convenience (Includes plan preparation, printing, maintenance, updates, installation, maintenance, and removal of traffic control).
  • Quantity: -  Unit: LS  Work Item: Mobilization (Lump Sum for schedule preparation, construction advisory letter, surveying, public notification signs, etc.).

NAICS Classification

237310 – Highway, Street, and Bridge Construction (Includes earthwork, median construction, pavement milling, asphalt paving, high friction surface treatment, pavement marking, and traffic control)., 238210 – Electrical Contractors (Includes installation and splicing of detector loops and related traffic signal system components).

Records and Due Date

This bid opportunity was entered into BidAmerica on November 26, 2025, and was last updated on November 25, 2025. All bids and/or proposals are due on December 4, 2025.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Riverside City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Riverside City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Riverside City prior to bidding.

HSIP Cycle XI Improvements - New Raised Median and High Friction Surface Treatment on Mission Inn Avenue Between Redwood Drive and Scout Lane Project - Bid Opportunity | BidAmerica