Loading...
Unofficial Notice of Invitation to Bid (NIB)
San Bernardino City is seeking bids from qualified and interested contractors for the following project titled, Storm Drain Improvement at W. Hill Drive, identified under Solicitation ID: RFQ F-26-4068. Work is to be performed near N Acacia Ave, San Bernardino, CA 92407, USA in San Bernardino County.
General Project Description
This project involves the construction of new storm drain infrastructure, including the installation of an 18-inch storm drainpipe between N. Acacia Avenue and N. Mayfield Avenue, and the construction of a headwall at the terminus of the storm drain line. The work also entails fabrication and installation of construction information signs, clearing and grubbing, removal and reconstruction of concrete improvements (curb ramps, sidewalks, driveway approaches, curbs, curb and gutter, cross gutters, spandrels), roadway milling, removal and replacement of deteriorated asphalt concrete pavement, crack sealing, asphalt concrete overlay, application of traffic striping and pavement markings, adjustment of existing utility frames/covers, grinding of curb/gutter/sidewalk/driveway approaches, compliance with NPDES requirements, traffic control, and survey marking, along with all other necessary incidental work in accordance with the Plans, Standard Specifications, and Special Provisions.
General Bid Items
- Quantity: 1 Unit: LS Work Item: Mobilization
- Quantity: 1 Unit: LS Work Item: Traffic Control
- Quantity: 1 Unit: LS Work Item: Cleaning and Grubbing and BMPs
- Quantity: 1180 Unit: L.F. Work Item: Install 18” RCP
- Quantity: 2 Unit: EA Work Item: Construct Curb Inlet Catch Basin No.1
- Quantity: 1 Unit: EA Work Item: Construct Curb Inlet Catch Basin No.2
- Quantity: 2 Unit: EA Work Item: Construct Local Depression
- Quantity: 1 Unit: EA Work Item: Construct Connection to Catch Basin
- Quantity: 2 Unit: EA Work Item: Install 24”X 24” Concrete Drop Inlet
- Quantity: 20 Unit: L.F. Work Item: Install Chain Link Fence
- Quantity: 3 Unit: EA Work Item: Construct Wing- Type Headwall
- Quantity: 35 Unit: S.F. Work Item: Install Grouted Stone Outlet Pad
- Quantity: 4 Unit: EA Work Item: Construct Manhole No. 2
- Quantity: 6250 Unit: S.F. Work Item: Remove Existing Asphalt Pavement Section
- Quantity: 6250 Unit: S.F. Work Item: Install Minimum Pavement Repair
- Quantity: 30 Unit: C.Y. Work Item: Remove and Replace Existing Concrete Over 95% Compaction to Match Existing
- Quantity: 3150 Unit: S.F. Work Item: Remove and Replace Existing Grouted Rip Rap Over 95% Compaction to match Existing
- Quantity: 40 Unit: L.F. Work Item: Remove Existing Curb and Replace with 6” Curb
- Quantity: 250 Unit: S.F. Work Item: Remove Existing Sidewalk and Replace with 0.3’ PCC Sidewalk
- Quantity: 30 Unit: C.Y. Work Item: Remove Existing Concrete and Replace with 8” Concrete Cross Gutter
- Quantity: 85 Unit: L.F. Work Item: Install 24” RCP
NAICS Classification
NAICS 237110 – Water and Sewer Line and Related Structures Construction, NAICS 237310 – Highway, Street, and Bridge Construction, NAICS 238910 – Site Preparation Contractors, NAICS 238110 – Poured Concrete Foundation and Structure Contractors
Records and Due Date
This bid opportunity was entered into BidAmerica on February 26, 2026, and was last updated on February 26, 2026. All bids and/or proposals are due on March 25, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Bernardino City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Bernardino City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Bernardino City prior to bidding.