Unofficial Notice of Invitation to Bid (NIB)

San Bernardino County is seeking bids from qualified and interested contractors for the following project titled, UNIT 4 PHASE 2 COMPOSITE LINER CONSTRUCTION PROJECT AT THE MID- VALLEY SANITARY LANDFILL, identified under Solicitation ID: -. Work is to be performed near 2390 N Alder Ave, Rialto, CA 92377, USA in San Bernardino County.

General Project Description

This project involves the construction of a composite liner system for Unit 4 Phase 2 at the Mid-Valley Sanitary Landfill. The primary scope includes earthwork operations such as clearing, grubbing, demolition, excavation, grading, and installation of low-permeability material (LPM). It encompasses the preparation of subgrade surfaces, installation of geosynthetics (geomembrane and geosynthetic clay liner), and construction of leachate collection and removal systems (LCRS) and landfill gas (LFG) infrastructure. Additionally, the project includes miscellaneous civil improvements, drainage structures, access road improvements, and interim stormwater management measures. The work is divided into distinct construction sequences or milestones, requiring continuous access for waste disposal in the active Unit 4 Disposal Area.

General Bid Items

  • Quantity: 1.0  Unit: LS  Work Item: Mobilization/Demobilization
  • Quantity: 1.0  Unit: LS  Work Item: Construction Support Tasks
  • Quantity: 1.0  Unit: LS  Work Item: Stormwater Compliance Tasks
  • Quantity: 1.0  Unit: LS  Work Item: Construction Survey
  • Quantity: 75,000.0  Unit: DLR  Work Item: Waste Removal and Relocation
  • Quantity: 1.0  Unit: LS  Work Item: Clearing, Grubbing, and Demolition - Unit 4 Phase 2 Area
  • Quantity: 1.0  Unit: LS  Work Item: Miscellaneous Site Work - Unit 4 Phase 2 Area
  • Quantity: 6,500  Unit: CY  Work Item: Unclassified Excavation to Fill - Unit 4 Phase 2 Area
  • Quantity: 19,000  Unit: CY  Work Item: Unclassified Excavation to Stockpile - Unit 4 Phase 2 Area
  • Quantity: 600,000.0  Unit: DLR  Work Item: Temporary Earthen Ramps for Construction Access
  • Quantity: 165,000  Unit: CY  Work Item: Import and Place Low Permeability Material Soil - Slope, Bench, and Access Road
  • Quantity: 1,980,000  Unit: SF  Work Item: Subgrade Surface Preparation for Geosynthetics
  • Quantity: 125,000  Unit: DLR  Work Item: Re-work Low Permeability Barrier Layer
  • Quantity: 2,305,000  Unit: SF  Work Item: 60-mil HDPE Geomembrane (Textured Both Sides) – Slope, Bench, and Access Road
  • Quantity: 2,305,000  Unit: SF  Work Item: Geosynthetic Clay Liner (GCL) - Slope, Bench, and Access Road
  • Quantity: 2,305,000  Unit: SF  Work Item: 60-mil HDPE Geomembrane (Single Sided Textured) – Slope, Bench, and Access Road
  • Quantity: 2,305,000  Unit: SF  Work Item: 16 oz/sy Geotextile – Slope, Bench, and Access Road
  • Quantity: 2,000,000  Unit: SF  Work Item: Protective Plastic Cover and Wind Ballast - Slope
  • Quantity: 6,000  Unit: LF  Work Item: Intermediate Bench/Road Anchor Trench
  • Quantity: 575  Unit: LF  Work Item: Join Existing Composite Liner Section at Existing Paved Access Road Hinge
  • Quantity: 600  Unit: LF  Work Item: Join Existing Composite Liner Section at LCRS Slurry Downdrain
  • Quantity: 35  Unit: LF  Work Item: Join Existing Composite Liner Section at Existing Paved Access Road Termination
  • Quantity: 5,700  Unit: LF  Work Item: Join Existing Composite Liner Section at Existing Top (Bench 4) Anchor Trench Termination
  • Quantity: 26  Unit: EA  Work Item: Join Existing LCRS/LFG Riser
  • Quantity: 4,150  Unit: LF  Work Item: Typical Liner Termination at Top Bench/Road
  • Quantity: 1,900  Unit: LF  Work Item: Liner Termination at Northeast Perimeter
  • Quantity: 1,750  Unit: LF  Work Item: Liner Termination at West Channel
  • Quantity: 710  Unit: LF  Work Item: Liner Termination at South Basin
  • Quantity: 9,250  Unit: LF  Work Item: 24" Solid HDPE SDR 17 LFG Header, Air, and Condensate Forcemain Pipes in Common Trench
  • Quantity: 50  Unit: EA  Work Item: 12" Solid HDPE SDR 17 Molded Reducer Tee Fitting with Flange Adapter and Blind Flange
  • Quantity: 5  Unit: EA  Work Item: Construct In-Line Condensate Sump
  • Quantity: 9  Unit: EA  Work Item: Compressed Air Line Isolation and Blow Off Valve
  • Quantity: 9  Unit: EA  Work Item: Condensate Forcemain Dual Contained Cleanout Risers
  • Quantity: 40  Unit: LF  Work Item: Transition from Paved Access Road Section to Lined Access Road Section
  • Quantity: 145,000  Unit: SF  Work Item: Protective Soil Cover – Slope, First 12' Vertical
  • Quantity: 350,000  Unit: SF  Work Item: Protective Soil Cover – Bench and Access Road
  • Quantity: 6,000  Unit: LF  Work Item: 6" Solid HDPE SDR 17 LCRS Slope Riser Pipe
  • Quantity: 5,950  Unit: LF  Work Item: 6" Solid HDPE SDR 17 LCRS Slope Riser Pipe
  • Quantity: 21,750  Unit: LF  Work Item: LCRS Bench/Road Collector
  • Quantity: 18  Unit: EA  Work Item: LCRS Bench Crossing and Interceptor Berm
  • Quantity: 3  Unit: EA  Work Item: LCRS Bench Crossing and Interceptor Berm - Existing Bench 4
  • Quantity: 1.0  Unit: LS  Work Item: LCRS Pipe Junctions
  • Quantity: 24  Unit: EA  Work Item: Slope Riser Pipe Termination Support - Above Ground
  • Quantity: 16  Unit: EA  Work Item: Slope Riser Pipe Termination Support - On-Grade
  • Quantity: 1,500  Unit: LF  Work Item: LCRS Storm Drain at Bench Crossing
  • Quantity: 1,600  Unit: LF  Work Item: Wrapped Gravel Infiltration Corridor
  • Quantity: 64,000  Unit: SF  Work Item: Lined Access Road Driving Surface - 12" Thick Oversized Rock with CMB
  • Quantity: 26,500  Unit: SF  Work Item: West Basin Access Road - 6" Crushed Miscellaneous Base with Non-Woven Geotextile Underlay
  • Quantity: 115  Unit: SF  Work Item: Class V Rip Rap Per SSPWC Section 200-1.6
  • Quantity: 700  Unit: SF  Work Item: Class III Rip Rap Per SSPWC Section 200-1.6
  • Quantity: 100,000  Unit: DLR  Work Item: Landfill Gas System Modifications During Construction
  • Quantity: 1.0  Unit: LS  Work Item: Clearing, Grubbing, and Demolition - Entrance Facility Area
  • Quantity: 1.0  Unit: LS  Work Item: Miscellaneous Site Work - Entrance Facility Area
  • Quantity: 2,750  Unit: CY  Work Item: Unclassified Excavation to Fill - Entrance Facility Area
  • Quantity: 4,750  Unit: CY  Work Item: Unclassified Excavation to Stockpile - Entrance Facility Area
  • Quantity: 3,250  Unit: LF  Work Item: Saw Cut Existing AC Pavement
  • Quantity: 115,000  Unit: SF  Work Item: Shoulder Paving - 6" AC over 8" Class II Base
  • Quantity: 50  Unit: EA  Work Item: Class 1 Flexible Post Delineator per Caltrans Std. Plan A-73C
  • Quantity: 1,350  Unit: LF  Work Item: Type D2-6 Mountable Curb per SPPWC Std. Plan 121-2
  • Quantity: 1.0  Unit: LS  Work Item: Site Striping Improvements
  • Quantity: 3,200  Unit: SF  Work Item: Concrete Trapezoidal Channel
  • Quantity: 25  Unit: LF  Work Item: Splashwall
  • Quantity: 35  Unit: SF  Work Item: Class III Rip Rap Per SSPWC Section 200-1.6
  • Quantity: 100  Unit: LF  Work Item: Concrete Cut-off Wall
  • Quantity: 1.0  Unit: LS  Work Item: Entrance Facility Inlet Structure
  • Quantity: 1.0  Unit: LS  Work Item: Downdrain A Outlet
  • Quantity: 1.0  Unit: LS  Work Item: Downdrain B Outlet
  • Quantity: 2  Unit: EA  Work Item: Flume Downdrain Extension
  • Quantity: 700  Unit: LF  Work Item: 6' Wrought Iron Fence
  • Quantity: 1.0  Unit: EA  Work Item: Wrought Iron Gate
  • Quantity: 11  Unit: EA  Work Item: Protect Existing Power Pole (SCE)
  • Quantity: 10  Unit: EA  Work Item: Protect Existing Power Pole (Private)
  • Quantity: 1.0  Unit: LS  Work Item: Site Entry Sign/Monument
  • Quantity: 1.0  Unit: LS  Work Item: Clearing, Grubbing, and Demolition - Unit 3 BMP Area
  • Quantity: 1.0  Unit: LS  Work Item: Miscellaneous Site Work - Unit 3 BMP Area
  • Quantity: 1.0  Unit: LS  Work Item: Exploratory Potholing
  • Quantity: 1,900  Unit: CY  Work Item: Unclassified Excavation to Fill - Unit 3 BMP Area
  • Quantity: 500  Unit: CY  Work Item: Unclassified Excavation to Stockpile - Unit 3 BMP Area
  • Quantity: 690  Unit: LF  Work Item: Basin Subdrain
  • Quantity: 100  Unit: LF  Work Item: Concrete Cut-Off Wall
  • Quantity: 8,850  Unit: SF  Work Item: Concrete Basin Floor
  • Quantity: 4,400  Unit: SF  Work Item: Concrete Basin Slope
  • Quantity: 245  Unit: LF  Work Item: Concrete Basin Slope to Floor Transition
  • Quantity: 225  Unit: LF  Work Item: Concrete Basin Top Edge
  • Quantity: 830  Unit: SF  Work Item: Concrete Basin Access Ramp
  • Quantity: 1.0  Unit: LS  Work Item: Expansion Joint - Concrete Basin
  • Quantity: 1.0  Unit: LS  Work Item: Contraction Joint - Concrete Basin
  • Quantity: 15,400  Unit: SF  Work Item: AC Paved Bench
  • Quantity: 1.0  Unit: LS  Work Item: 36" CHDPE - Riser Outlet
  • Quantity: 565  Unit: LF  Work Item: Geocomposite Basin Underdrain
  • Quantity: 2  Unit: EA  Work Item: 8" Permanent Skimmer
  • Quantity: 2  Unit: EA  Work Item: 8" Permanent Skimmer Hanging Apparatus
  • Quantity: 1.0  Unit: EA  Work Item: Skimmer Support Frame
  • Quantity: 15  Unit: LF  Work Item: 6" SDR 17 Solid HDPE Skimmer Outlet Pipe
  • Quantity: 2  Unit: EA  Work Item: Install Winch and Winch Stand
  • Quantity: 95  Unit: LF  Work Item: AC Thickened Edge
  • Quantity: 400  Unit: LF  Work Item: Construct Cable Railing per Caltrans Std Plan B11-47
  • Quantity: 125  Unit: LF  Work Item: Reinforced Concrete Retaining Wall (H=12') Type 2 Per SPPWC 611-3
  • Quantity: 25  Unit: LF  Work Item: Reinforced Concrete Retaining Wall (H=10') Type 2 Per SPPWC 611-3
  • Quantity: 30  Unit: LF  Work Item: Reinforced Concrete Retaining Wall (H=7') Type 2 Per SPPWC 611-3
  • Quantity: 10  Unit: LF  Work Item: Reinforced Concrete Retaining Wall (H=4') Type 2 Per SPPWC 611-3

NAICS Classification

NAICS 237990 – Other Heavy and Civil Engineering Construction (Covers landfill construction, liner systems, leachate and gas collection systems, and other civil improvements not elsewhere classified), NAICS 238910 – Site Preparation Contractors (Includes clearing, grubbing, demolition, excavation, grading, and earthwork integral to landfill development), NAICS 237110 – Water and Sewer Line and Related Structures Construction (Relevant for the installation of piping within the LCRS and LFG systems), NAICS 237310 – Highway, Street, and Bridge Construction (Applicable for access road construction, surface preparation, and paving sections)

Records and Due Date

This bid opportunity was entered into BidAmerica on December 11, 2025, and was last updated on February 4, 2026. All bids and/or proposals are due on February 10, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Bernardino County.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Bernardino County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Bernardino County prior to bidding.

UNIT 4 PHASE 2 COMPOSITE LINER CONSTRUCTION PROJECT AT THE MID- VALLEY SANITARY LANDFILL - Bid Opportunity | BidAmerica