General Project Description
This project involves the renovation of the San Carlos Library Makerspace. The scope of work generally includes the demolition of existing interior walls and subsequent construction for the Makerspace Project. The contractor is responsible for furnishing all labor, materials, tools, equipment, and services necessary to complete the project in a neat and finished condition, with all equipment properly installed and working to the satisfaction of the Architect. This is a "Public Works" project and requires compliance with prevailing wage laws. Key construction activities include general requirements, project management, demolition, waste management, installation of various building components such as metals, suspended ceilings, architectural woodwork, doors, windows, finishes (gypsum board, tiling, painting, resilient flooring), specialties (visual display surfaces, fire protection cabinets, fire extinguishers), equipment (including alarm & sprinkler systems, plumbing, HVAC, electrical, lighting), and communications infrastructure.
General Bid Items
- Quantity: - Unit: - Work Item: BASE BID - GENERAL REQUIREMENTS
- Quantity: - Unit: - Work Item: PROJECT MANAGEMENT AND COORDINATION
- Quantity: - Unit: - Work Item: OVERHEAD AND PROFIT
- Quantity: - Unit: - Work Item: PROJECT ADMINISTRATION
- Quantity: - Unit: - Work Item: FLOOR PROTECTION
- Quantity: - Unit: - Work Item: CLEANING AND WASTE MANAGEMENT
- Quantity: - Unit: - Work Item: FINAL CLEANING
- Quantity: - Unit: - Work Item: GENERAL REQUIREMENTS SUBTOTAL
- Quantity: - Unit: - Work Item: DEMOLITION
- Quantity: - Unit: - Work Item: DUMPSTER AND HAULING
- Quantity: - Unit: - Work Item: DUMPSTER AND HAULING SUBTOTAL
- Quantity: - Unit: - Work Item: ROLLER SHADES - FURNISH AND INSTALL ROLLER SHADES
- Quantity: - Unit: - Work Item: ROLLER SHADES SUBTOTAL
- Quantity: - Unit: - Work Item: METALS & SUSPENDED CEILING - FURNISH AND INSTALL WALL FRAMING AND SOFFIT
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL SUSPENDED CEILING
- Quantity: - Unit: - Work Item: METALS & SUSPENDED CEILING SUBTOTAL
- Quantity: - Unit: - Work Item: WOOD, PLASTICS AND COMPOSITES - FURNISH AND INSTALL CABINETRY PER PLAN
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL CABINET HARDWARE PER PLAN
- Quantity: - Unit: - Work Item: WOOD, PLASTICS AND COMPOSITES SUBTOTAL
- Quantity: - Unit: - Work Item: SOLAR TUBES - FURNISH & INSTALL SOLAR TUBE(S) AND ASSOCIATED FRAMING, WATERPROOFING AND FLASHING
- Quantity: - Unit: - Work Item: SOLAR TUBES SUBTOTAL
- Quantity: - Unit: - Work Item: DOORS AND WINDOWS - FURNISH AND INSTALL ENTRY DOOR
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL REPLACEMENT DOORS
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL DOOR HARDWARE
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL WINOW MATERIAL
- Quantity: - Unit: - Work Item: DOORS AND WINDOWS SUBTOTAL
- Quantity: - Unit: - Work Item: FINISHES - FURNISH AND INSTALL 5/8" GYP BD. LEVEL 5 FINISH
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL CARPET AND / OR FLOOR TILES
- Quantity: - Unit: - Work Item: FURNISH AND PROVIDE PAINTING, WALL PANELS AND WHITE BOARD
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL COUNTERTOPS
- Quantity: - Unit: - Work Item: FURNISH AND PROVIDE ALL FURNITURE
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL DOOR HARDWARE
- Quantity: - Unit: - Work Item: FINISHES SUBTOTAL
- Quantity: - Unit: - Work Item: EQUIPMENT - EQUIPMENT RENTAL AS NEEDED
- Quantity: - Unit: - Work Item: EQUIPMENT SUBTOTAL
- Quantity: - Unit: - Work Item: ALARM & SPRINKLER SYSTEMS (DEFERRED SUBMITTAL) - DESIGN AND INSTALL OF ALARM & SPRINKLER SYSTEMS (DEFERRED)
- Quantity: - Unit: - Work Item: ALARM & SPRINKLER SYSTEMS SUBTOTAL
- Quantity: - Unit: - Work Item: PLUMBING - FURNISH AND INSTALL SINK AND FAUCET MATERIALS
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL ROUGH AND FINISH PLUMBING
- Quantity: - Unit: - Work Item: PLUMBING SUBTOTAL
- Quantity: - Unit: - Work Item: HEATING, VENTILATION & AIR CONDITIONING - FURNISH AND INSTALL NEW HVAC AND DUCT WORK
- Quantity: - Unit: - Work Item: HEATING, VENTILATION & AIR CONDITIONING SUBTOTAL
- Quantity: - Unit: - Work Item: ELECTRICAL, LOW VOLTAGE AND LIGHTING - FURNISH AND INSTALL ELECTRICAL & LOW VOLTAGE
- Quantity: - Unit: - Work Item: FURNISH AND INSTALL LIGHTING
- Quantity: - Unit: - Work Item: ELECTRICAL, LOW VOLTAGE AND LIGHTING SUBTOTAL
NAICS Classification
236220 – Commercial and Institutional Building Construction (General contractors for library renovation, including interior fit-out and systems installation)., 238110 – Poured Concrete Foundation and Structure Contractors (Concrete work for new construction as part of the renovation)., 238140 – Masonry Contractors (Masonry work for new construction)., 238160 – Roofing Contractors (Built-up asphalt roofing for thermal and moisture protection)., 238190 – Other Foundation, Structure, and Building Exterior Contractors (Sheet metal flashing and trim, nonbituminous self-adhering air barriers, penetration firestopping)., 238310 – Drywall and Insulation Contractors (Gypsum board installation, building insulation)., 238320 – Painting and Wall Covering Contractors (Interior painting)., 238330 – Floor Covering Contractors (Resilient flooring, tiling)., 238350 – Finish Carpentry Contractors (Interior architectural woodwork, miscellaneous rough carpentry, wood cabinets)., 238390 – Other Building Finishing Contractors (Joint sealants, visual display units, fire protection cabinets, fire extinguishers, roller shades, countertops)., 238210 – Electrical Contractors and Other Wiring Installation Contractors (Electrical systems installation, low-voltage electrical power conductors and cables, grounding and bonding, raceways, boxes, wiring devices, enclosed switches, lighting, digital lighting controls)., 238220 – Plumbing, Heating, and Air-Conditioning Contractors (Fire suppression systems, plumbing piping and equipment, HVAC piping and equipment, meters and gauges for HVAC, air terminal unit installation, air outlets and inlets, ductwork and casings, duct insulation, hydronic piping specialties)., 238290 – Other Building Equipment Contractors (Fire suppression sprinkler systems, alarm and sprinkler systems, integrated automation)., 238910 – Site Preparation Contractors (Demolition, dumpster and hauling, site clearing).
Records and Due Date
This bid opportunity was entered into BidAmerica on January 15, 2026, and was last updated on February 7, 2026. All bids and/or proposals are due on February 19, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Carlos City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Carlos City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Carlos City prior to bidding.