Loading...

Unofficial Notice of Invitation to Bid (NIB)

San Diego Unified School District SDUSD is seeking bids from qualified and interested contractors for the following project titled, Roller Shades at Garfield Elementary and Lewis Middle School, identified under Solicitation ID: CP26-0664-05-00-00. Work is to be performed near 4487 Oregon St, San Diego, CA 92116, USA in San Diego County.

General Project Description

This project involves providing all necessary labor, materials, equipment, and supplies for the removal of existing window coverings and hardware, including proper disposal in a legal landfill. The primary scope includes the installation of new manually operated, single-roller shades at Garfield Elementary School and Lewis Middle School, along with related construction, coordination, and finishing work as per Section 12 24 13 of the specifications. The installation includes ensuring shades are plumb, level, and aligned, with opaque shade bands not closer than 2 inches to the interior face of glass, allowing proper clearances for window operation hardware. Contractor is also responsible for field measurements, coordination with existing construction, and ensuring clean and protected work areas.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Removal of existing window coverings, hardware, and disposal.
  • Quantity: 1  Unit: LS  Work Item: Installation of new manually operated, single-roller shades, including fabrication, mounting hardware, shadeband material, and installation accessories.
  • Quantity: 1  Unit: LS  Work Item: Adjusting and balancing roller shades for smooth and safe operation.
  • Quantity: 1  Unit: LS  Work Item: Final cleaning and protection of installed roller shade surfaces.
  • Quantity: 36  Unit: SF  Work Item: Install Roller Shade, Building 1, Room 1 (Width 8 ft, Height 4.5 ft)
  • Quantity: 36  Unit: SF  Work Item: Install Roller Shade, Building 2, Room 2 (Width 8 ft, Height 4.5 ft)
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 3, Room 3 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 3, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 3, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 4, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 4, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 4, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 192  Unit: SF  Work Item: Install Roller Shades, Building 5, Room 4 (Width 4 ft, Height 6 ft)
  • Quantity: 192  Unit: SF  Work Item: Install Roller Shades, Building 6, Room 4 (Width 4 ft, Height 6 ft)
  • Quantity: 192  Unit: SF  Work Item: Install Roller Shades, Building 7, Room 4 (Width 4 ft, Height 6 ft)
  • Quantity: 192  Unit: SF  Work Item: Install Roller Shades, Building 8, Room 4 (Width 4 ft, Height 6 ft)
  • Quantity: 192  Unit: SF  Work Item: Install Roller Shades, Building 9, Room 4 (Width 4 ft, Height 6 ft)
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 10, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 11, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 12, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 12, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 13, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 13, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 14, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 14, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 15, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 15, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 16, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 16, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 56  Unit: SF  Work Item: Install Roller Shade, Building 17, Room 8 (Width 8 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 17, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 18, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 18, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 84  Unit: SF  Work Item: Install Roller Shade, Building 19, Room 12 (Width 12 ft, Height 7 ft)
  • Quantity: 10.5  Unit: SF  Work Item: Install Roller Shade, Building 19, Room 3.5 (Width 3.5 ft, Height 3 ft) - Above Door
  • Quantity: 32  Unit: SF  Work Item: Install Roller Shade, Building 20, Room 8 (Width 8 ft, Height 4 ft)
  • Quantity: 32  Unit: SF  Work Item: Install Roller Shade, Building 21, Room 8 (Width 8 ft, Height 4 ft)
  • Quantity: 32  Unit: SF  Work Item: Install Roller Shade, Building 22, Room 8 (Width 8 ft, Height 4 ft)
  • Quantity: 32  Unit: SF  Work Item: Install Roller Shade, Building 23, Room 8 (Width 8 ft, Height 4 ft)
  • Quantity: 168  Unit: SF  Work Item: Install All Blinds, Kinder CC1, Entry Room (Width 4 ft, Height 7 ft)

NAICS Classification

NAICS 238390 – Other Building Finishing Contractors (Installation of window shades, blinds, and related accessories)., NAICS 238990 – All Other Specialty Trade Contractors (General specialty trade work including removal and disposal of existing architectural elements).

Records and Due Date

This bid opportunity was entered into BidAmerica on December 15, 2025, and was last updated on December 22, 2025. All bids and/or proposals are due on January 9, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Diego Unified School District SDUSD.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Diego Unified School District SDUSD. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Diego Unified School District SDUSD prior to bidding.

Roller Shades at Garfield Elementary and Lewis Middle School - Bid Opportunity | BidAmerica