San Diego County is seeking bids from qualified and interested contractors for the following project titled, AS-NEEDED ENVIRONMENTAL CONSULTING SERVICES, identified under Solicitation ID: 12878. Work is to be performed near 5500 Overland Ave, San Diego, CA 92123, USA in San Diego County.

General Project Description

The County of San Diego is seeking Statements of Qualifications (SOQ) from firms to provide comprehensive as-needed environmental and planning consulting services for various County Department of General Services (DGS) projects. The services will be assigned via task orders and will span multiple projects across the region over an initial one-year term with four one-year options. The scope includes environmental document preparation (CEQA, NEPA), technical studies (air quality, cultural, biological, geotechnical, hazardous materials), mitigation, monitoring, general planning, permitting assistance, sustainability support, transportation, visual impact assessments, stormwater management, fire behavior modeling, and community outreach.

General Bid Items

  • Quantity: -  Unit: -  Work Item: Preparation of Opportunities and Constraints Reports, Initial Study Checklists, Categorical Exemption Reports, 15183 Findings, Addendums, Mitigated Negative Declarations (MND), Negative Declarations (ND), Environmental Assessments (EA), Environmental Impact Reports (EIRs), Environmental Impact Statements (EISs), and joint EIR/EISs to include requirements of CEQA, NEPA, and all associated regulations.
  • Quantity: -  Unit: -  Work Item: Review/peer review of EIRs and EISs.
  • Quantity: -  Unit: -  Work Item: Analysis, preparation, review, support and implementation of various technical studies and plans, to meet the requirements of CEQA, NEPA and all associated local, state, and federal regulations.
  • Quantity: -  Unit: -  Work Item: Air Quality and Greenhouse Gas emissions analysis and modeling.
  • Quantity: -  Unit: -  Work Item: Archaeological and cultural resource research, analysis and report preparation. Specifications: Historical field reconnaissance, Pedestrian field surveys with Native American monitors, Subsurface testing, Archival studies and literature reviews, Analysis of archeological/historical resources, Historic American Buildings Survey (HABS)/Historic American Engineering Record (HAER) recording, Historic resource studies, Historic buildings inventory, Archaeological and cultural monitoring with Native American monitors during construction, Data recovery, documentation, cataloguing of artifacts, encapsulation, and repatriation.
  • Quantity: -  Unit: -  Work Item: Biological research, analyses, and report preparation.
  • Quantity: -  Unit: -  Work Item: Design documents, regulatory permit documentation and processing, and various technical reports. Specifications: Water quality reports, hydrology reports, stormwater management, sanitary sewer management and design, Facility planning studies, Feasibility assessments, Soil analysis and testing, soil characteristics, groundwater, hydrology, microclimate, and preparation of soil management plans.
  • Quantity: -  Unit: -  Work Item: Geotechnical Services. Specifications: Geotechnical site and soils investigations, analyses, and reports; Geotechnical design; Analysis of sites/facilities and related due diligence for foundation alternatives, soil bearing capacity, site grading, slope stability, excavation, shoring, dewatering, settlement, seismic fault investigations; Construction Documents preparation and review; Technical criteria documentation for Design-Build; Plan review and cost estimates; Construction Administration assistance.
  • Quantity: -  Unit: -  Work Item: Habitat creation and restoration/enhancement projects and protocols. Specifications: Grant funding assistance, biological habitat restoration programs, ecological restoration and habitat creation plans, revegetation plans, cost estimates and timelines for project implementation (site visits, specialized biological assistance, wetland/sensitive habitat delineation, vegetation/wildlife assessment, weed/trash removal).
  • Quantity: -  Unit: -  Work Item: Interjurisdictional Notice review. Specifications: Analyzing notices from other jurisdictions, reviewing development and land use planning projects, preparing comment letters, preparing summary of impacts.
  • Quantity: -  Unit: -  Work Item: Hazardous materials research and analysis. Specifications: Historical record searches and database searches, field reviews/site reconnaissance, Phase I Initial Site Assessment (ASTM Standard Practice), Phase II Environmental Site Assessment (site sampling and remediation recommendations), Aerially Deposited Lead (ADL) sampling and report preparation (Work Plan, Health and Safety Plan, Traffic Control Plan, right-of-way encroachment/excavation permits for ADL borings).
  • Quantity: -  Unit: -  Work Item: Mitigation and Monitoring. Specifications: Development and implementation of concept and final mitigation monitoring plans, revegetation and restoration plans, ecological restoration plans, habitat creation plans, habitat conservation plans, erosion control plans (including success criteria and monitoring schedules, site preparation, provision of plants, weed and trash removal).
  • Quantity: -  Unit: -  Work Item: Noise Analysis and Modeling. Specifications: Preparation of noise analysis and modeling for construction and operational noise and associated reports.
  • Quantity: -  Unit: -  Work Item: Planning. Specifications: Master planning analyses and reports, program development, studies, entitlements, site and building layouts, Project planning and phased implementation, Conceptual and schematic plans, Site analysis of existing site or facilities, pre-development due diligence, cost estimates and schedules, ADA compliance review.
  • Quantity: -  Unit: -  Work Item: Permitting Process. Specifications: Development of mitigation plan for environmental impacts, Preparation of application materials and supporting documentation for use permits, Coordination with various permitting agencies, Preparation of permit applications (USFWS, USACE, CDFW, RWQCB).
  • Quantity: -  Unit: -  Work Item: Sustainability, resiliency, climate change, and environmental justice. Specifications: Research, reporting, recommendations or as-needed support for projects, sustainability plans.
  • Quantity: -  Unit: -  Work Item: Transportation Studies. Specifications: Vehicle Miles Traveled study, analysis or assessment and reporting, Level of Service Analysis or assessment and reporting, Emergency Access assessments, Parking Studies.
  • Quantity: -  Unit: -  Work Item: Visual Impact Assessment. Specifications: Preparation of the Landscape Concept Plan, project coordination, review of visual analysis studies, compliance with community design guidelines and community plans, recommendations for design structures, visual simulations, and an Opinion of Probable Construction Cost.
  • Quantity: -  Unit: -  Work Item: Water Pollution Control Activities. Specifications: Preparation of a Stormwater Quality Management Plan (SWQMP), Construction Site Monitoring Program, Stormwater Sampling and Analysis Plan.
  • Quantity: -  Unit: -  Work Item: Preparation of Fire Behavior Models.
  • Quantity: -  Unit: -  Work Item: Other environmental study or document required for project approval under CEQA, NEPA, CWA, federal or state ESA, Section 7 or 10, and CFGC (including Utilities/Public services study and report and Wildlife study and report).
  • Quantity: -  Unit: -  Work Item: Community Outreach and Engagement. Specifications: Preparation of project specific communication plans, stakeholder engagement strategy documents, research and analysis of community/stakeholder input, preparation of project fact sheets, presentation materials and content (webpage, social media, FAQs, flyers, informational sheets, input cards), preparation of exhibits (visual simulation renderings), public workshop/stakeholder meeting preparation, public review notification and support, presentation of environmental documents at public hearings, stakeholder engagement and responses to comments.
  • Quantity: -  Unit: -  Work Item: Provision of adjunct staff support to General Services Project Management Division.

NAICS Classification

NAICS 541620 – Environmental Consulting Services, NAICS 541330 – Engineering Services, NAICS 541370 – Surveying and Mapping, NAICS 541800-series – Advertising, Public Relations, and Related Services, NAICS 541690 – Other Scientific and Technical Consulting Services, NAICS 541320 – Landscape Architectural Services, NAICS 562910 – Environmental Remediation Services

Records and Due Date

This bid opportunity was entered into BidAmerica on December 24, 2025, and was last updated on December 23, 2025. All bids and/or proposals are due on January 23, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Diego County.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Diego County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Diego County prior to bidding.

AS-NEEDED ENVIRONMENTAL CONSULTING SERVICES - Bid Opportunity | BidAmerica