Loading...
Unofficial Notice of Invitation to Bid (NIB)
San Mateo County is seeking bids from qualified and interested contractors for the following project titled, Request for Proposals (RFP) for Coyote Point Park Restroom Renovation, identified under Solicitation ID: 2026-RFP-00173. Work is to be performed near 1701 Coyote Point Dr, San Mateo, CA 94401, USA in San Mateo County.
General Project Description
The County of San Mateo Parks Department is seeking qualified contractors for the renovation of a restroom facility at Coyote Point Park. The restroom is approximately 30 ft by 30 ft, divided into men's and women's sections, and includes a chase storage closet. The project involves comprehensive upgrades to fixtures, plumbing, painting, doors, lighting, tile, and all surfaces. The primary objective is to modernize the restroom, ensuring it is durable, easy to clean, ADA compliant, and aesthetically pleasing. The facility has cinderblock construction with a concrete floor and features a tile detail on the front that needs to be maintained or repaired. Contractors must obtain all necessary permits and ensure compliance with the California Building Standards Code (Title 24) and California Plumbing Code (CPC).
General Bid Items
- Quantity: 1 Unit: $ Work Item: General Requirements - Mobilization / demobilization.
- Quantity: 1 Unit: $ Work Item: General Requirements - Site protection / barricades / signage.
- Quantity: 1 Unit: $ Work Item: General Requirements - Daily cleanup and disposal.
- Quantity: 1 Unit: $ Work Item: General Requirements - Permits.
- Quantity: 1 Unit: $ Work Item: General Requirements - ADA compliance.
- Quantity: 1 Unit: $ Work Item: General Requirements - Project schedule & coordination with park staff.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove existing toilets.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove existing urinals.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove sinks.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove restroom stall partitions.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove existing doors and frames.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove existing lighting.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove existing exterior tile at front facade.
- Quantity: 1 Unit: $ Work Item: Demolition - Remove flooring as necessary for prep.
- Quantity: 1 Unit: $ Work Item: Supply and Install - New floor-mounted heavy-duty toilets, Specifications: high-efficiency, water-saving, ADA compliant, touchless where possible.
- Quantity: 1 Unit: $ Work Item: Supply and Install - New wall-mounted urinals, Specifications: high-efficiency, water-saving, ADA compliant, touchless where possible.
- Quantity: 1 Unit: $ Work Item: Supply and Install - New wall-mounted sinks with metered or specified fixtures, Specifications: high-efficiency, water-saving, ADA compliant, touchless where possible.
- Quantity: 1 Unit: $ Work Item: Supply and Install - New shut-off valves for all fixtures.
- Quantity: 1 Unit: $ Work Item: Supply and Install - Adapt plumbing to existing rough-in locations.
- Quantity: 1 Unit: $ Work Item: Supply and Install - Inspect, snake, and flush all lines.
- Quantity: 1 Unit: $ Work Item: Supply and Install - Repairs in chase closet.
- Quantity: 1 Unit: $ Work Item: Partitions & Interior Wall Systems - Remove or cover tile wall partitions.
- Quantity: 1 Unit: $ Work Item: Partitions & Interior Wall Systems - Provide and install new PVC/composite partitions.
- Quantity: 1 Unit: $ Work Item: Partitions & Interior Wall Systems - Patch/repair surrounding walls.
- Quantity: 1 Unit: $ Work Item: Electrical & Lighting - Install new LED 8' strip lights in men's, women's, and chase, Specifications: energy-efficient, vandal-resistant.
- Quantity: 3 Unit: $ Work Item: Electrical & Lighting - Install new vandal-resistant exterior lights.
- Quantity: 1 Unit: $ Work Item: Electrical & Lighting - Install occupancy sensors to enhance energy efficiency.
- Quantity: 1 Unit: $ Work Item: Electrical & Lighting - Replace wiring as needed.
- Quantity: 1 Unit: $ Work Item: Doors & Hardware - Supply and install new galvanized metal doors & frames, Specifications: heavy-duty, vandal-resistant, ADA compliant, with appropriate hardware including automatic door closers.
- Quantity: 1 Unit: $ Work Item: Doors & Hardware - Install new locks, handles, kick plates, security panels.
- Quantity: 1 Unit: $ Work Item: Doors & Hardware - Keying to match existing system.
- Quantity: 1 Unit: $ Work Item: Doors & Hardware - Verify proper operation.
- Quantity: 1 Unit: $ Work Item: Flooring - Prep floor (patch holes, clean, grind as needed).
- Quantity: 1 Unit: $ Work Item: Flooring - Apply commercial-grade, slip-resistant epoxy coating.
- Quantity: 1 Unit: $ Work Item: Flooring - Color samples for approval.
- Quantity: 1 Unit: $ Work Item: Painting - Prepare & paint interior walls, Specifications: high-durability, moisture-resistant.
- Quantity: 1 Unit: $ Work Item: Painting - Prepare & paint exterior walls, Specifications: high-durability, moisture-resistant.
- Quantity: 1 Unit: $ Work Item: Painting - Paint roof rafters.
- Quantity: 1 Unit: $ Work Item: Painting - Clean skylights.
- Quantity: 1 Unit: $ Work Item: Exterior Tile - Remove or cover existing orange tile.
- Quantity: 1 Unit: $ Work Item: Exterior Tile - Install new tile finish, Specifications: high-durability, slip-resistant.
- Quantity: 1 Unit: $ Work Item: Exterior Tile - Grout and seal.
- Quantity: 1 Unit: $ Work Item: Exterior Tile - Match approved blue color scheme.
- Quantity: 1 Unit: $ Work Item: Exterior Water Fountain - Supply and install new ADA-compliant water fountain w/ bottle filler.
- Quantity: 1 Unit: $ Work Item: Exterior Water Fountain - Connect plumbing and power.
- Quantity: 1 Unit: $ Work Item: Exterior Water Fountain - Trim and patch surrounding wall.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Soap dispensers.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Toilet seat cover dispensers.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Changing tables.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Hand dryers.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Toilet paper holders.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Sanitary napkin dispensers.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Trash can holders.
- Quantity: 1 Unit: $ Work Item: Miscellaneous Fixtures - Wall repair at previous mounting locations.
NAICS Classification
NAICS 236220 – Commercial and Institutional Building Construction, NAICS 238220 – Plumbing, Heating, and Air-Conditioning Contractors, NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors, NAICS 238320 – Painting and Wall Covering Contractors, NAICS 238340 – Tile and Terrazzo Contractors, NAICS 238350 – Finish Carpentry Contractors
Records and Due Date
This bid opportunity was entered into BidAmerica on December 17, 2025, and was last updated on December 16, 2025. All bids and/or proposals are due on January 9, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Mateo County.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Mateo County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Mateo County prior to bidding.