Santa Monica City is seeking bids from qualified and interested contractors for the following project titled, Ground Water Production Well SM-14 Drilling, identified under Solicitation ID: SP2773. Work is to be performed near 1819 Stewart St, Santa Monica, CA 90404, USA in Los Angeles County.

General Project Description

This project involves the construction of a replacement municipal-supply water production well (SM-14) for the City of Santa Monica, targeting an operational production rate of 900-1,000 gallons per minute (gpm). The scope of work includes reverse circulation drilling of a pilot borehole up to 800 ft bgs, followed by downhole geophysical surveying, isolated aquifer zone testing, and reaming of the pilot borehole to specific diameters. The project requires the installation of conductor casing (36-inch OD low carbon steel), blank well casing (14-inch ID Type 304L stainless steel), louvered well casing (14-inch ID Type 304L stainless steel with 0.055-inch slots), gravel feed tube (3-inch ID Schedule 40 Type 304L stainless steel), pressure transducer tube (2-inch ID Schedule 40 Type 304L stainless steel), camera tube (4-inch ID Schedule 40 Type 304L stainless steel), and a 3-inch ID air vent tube. Further work includes mechanical and chemical well development, conducting pumping tests (12-hour step drawdown and 48-hour constant rate), dynamic and static spinner surveys, color video surveys of the completed well, well disinfection and capping, and potential abandonment/destruction of the pilot hole or well if necessary. All work must comply with local codes, State of California Water Well Standards, and American Water Works Association (AWWA) Standards, and requires obtaining necessary permits including LACD PH water well permit and a City business license. The Contractor is also responsible for proper temporary storage, treatment (using Granular Activated Carbon (GAC) adsorption system), and discharge of well development and testing fluids in compliance with NPDES permit and SMMC 5.20.040 requirements.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilize and demobilize a reverse circulation drill rig and associated equipment, apply for and obtain permits, provide bonds, provide Baker tanks for solids settling, and prepare site for well construction.
  • Quantity: 1  Unit: LS  Work Item: Provide for treatment, sampling, analysis, and compliance with NPDES permit for discharge of well development and testing fluids.
  • Quantity: 1  Unit: LS  Work Item: Perform VOC treatment using the granular activated carbon (GAC) absorption system.
  • Quantity: 52  Unit: LF  Work Item: Drill 42" dia. hole (minimum), furnish and install 36" outside diameter (OD) x 5/16" (minimum) Low Carbon Steel (LCS) conductor casing and grout into place to 50 ft bgs (including 2 ft of stick-up above ground surface) with 10.3-sack neat cement.
  • Quantity: 750  Unit: LF  Work Item: Using the reverse circulation method, drill the pilot borehole from 50 ft to 800 ft bgs with a 14-inch nominal diameter drill bit, collect formation samples, monitor fluid properties, conduct drift surveys, and perform related work.
  • Quantity: 1  Unit: LS  Work Item: Provide downhole geophysical surveying consisting of spontaneous potential, short (16-inch) and long (64-inch) normal resistivity, focused (guard or laterologs) resistivity, sonic variable density (sonic), gamma-ray, nuclear magnetic resonance (NMR), first caliper survey, and first magnetic deviation surveys for the pilot borehole.
  • Quantity: 3  Unit: Per Zone  Work Item: Perform three (3) isolated aquifer zone tests in the pilot borehole.
  • Quantity: 3  Unit: Per Sample  Work Item: Retain laboratory, collect samples, deliver samples to laboratory, and pay for specified analyses for the per zone unit price.
  • Quantity: 240  Unit: LF  Work Item: Ream upper portion of pilot borehole to 34 inches in diameter from 50 ft to 290 ft bgs.
  • Quantity: 350  Unit: LF  Work Item: Ream lower portion of pilot borehole to 24 inches from 290 ft to 640 ft bgs.
  • Quantity: 1  Unit: LS  Work Item: Provide for second caliper survey after completion of pilot borehole reams.
  • Quantity: 1  Unit: LS  Work Item: Provide for second deviation (magnetic) survey after completion of pilot borehole reams.
  • Quantity: 327  Unit: LF  Work Item: Furnish and install 327 ft of 14-inch ID by 1/4-inch wall Type 304L stainless steel blank well casing (interspersed with Louvers), from 2 ft above ground surface to 620 ft bgs, including a 20-foot long section of cellar pipe with endcap.
  • Quantity: 295  Unit: LF  Work Item: Furnish and install 295 ft of 14-inch ID by 1/4-inch wall Type 304L stainless steel, 0.055-inch (55-slot) Ful-flo Louvers (interspersed with blank casing) from 195 ft to 600 ft bgs.
  • Quantity: 172  Unit: LF  Work Item: Furnish and install 172 ft of 3-inch ID Schedule 40 Type 304L stainless steel gravel feed tube from 2 ft above ground surface to 170 ft bgs.
  • Quantity: 277  Unit: LF  Work Item: Furnish and install 277 ft of 2-inch ID Schedule 40 Type 304L stainless steel sounding tube (for transducer), from 2 ft above ground surface to 275 ft bgs, equipped with a 1-foot long port opening from 275 to 276 ft bgs.
  • Quantity: 184  Unit: LF  Work Item: Furnish and install 184 ft of 4-inch ID Schedule 40 Type 304L stainless steel camera tube, from 2 ft above ground surface to 182 ft bgs, equipped with an 8-foot long port opening from 182 to 190 ft bgs.
  • Quantity: 4  Unit: LF  Work Item: Furnish and install one, four-foot long, 3-inch ID Schedule 40 Type 304L stainless steel air vent tube, from 2 ft above ground surface to 2 ft bgs.
  • Quantity: 10  Unit: LF  Work Item: Install (optional) 10-foot bentonite pilot hole bottom seal (630-640 ft bgs).
  • Quantity: 485  Unit: LF  Work Item: Furnish and install PWG, or similar, 8 x 16 gradation gravel pack from 145 ft to 630 ft bgs, including 5 ft of fine-grained transition sand from 145 to 150 ft bgs.
  • Quantity: 135  Unit: LF  Work Item: Install annular cement/grout seal in lifts from 10 ft bgs to 145 ft bgs.
  • Quantity: 1  Unit: LS  Work Item: Conduct gyroscopic alignment survey to the total depth of the well casing.
  • Quantity: 24  Unit: HR  Work Item: Standby time.
  • Quantity: 120  Unit: HR  Work Item: Mechanically develop well by swabbing and airlift pumping (only actual swabbing or surging time shall be attributed to development time).
  • Quantity: 90  Unit: GAL  Work Item: Chemicals for well development: furnish 90 gallons of 12 1/2 % chlorine solution.
  • Quantity: 12  Unit: GAL  Work Item: Chemicals for well development: furnish 12 gallons of NW-220 (or equivalent).
  • Quantity: 3  Unit: Each  Work Item: Provide up to three (3) color video surveys and three (3) DVD copies of completed well (entire depth).
  • Quantity: 1  Unit: LS  Work Item: Mobilization, installation, and demobilization of a temporary test pump and accessories to a depth of 280 ft bgs.
  • Quantity: 60  Unit: HR  Work Item: Conduct pumping development, record and monitor changes in water levels, sand content, and flow rates.
  • Quantity: 12  Unit: HR  Work Item: Perform 12-hour (maximum) step drawdown test including measurements of water levels, pumping rates and sand production.
  • Quantity: 48  Unit: HR  Work Item: Perform 48-hour (maximum) constant rate pumping test, including measurements of water levels, pumping rates and sand production.
  • Quantity: 1  Unit: LS  Work Item: Conduct a downwell dynamic spinner survey.
  • Quantity: 1  Unit: LS  Work Item: Conduct a downwell static (non-pumping) flowmeter (spinner) survey.
  • Quantity: 1  Unit: LS  Work Item: Disinfect and cap the well.
  • Quantity: 700  Unit: LF  Work Item: Abandonment/destruction of pilot hole or well if requested by the City's Project Hydrogeologist.
  • Quantity: 1  Unit: LS  Work Item: Owner Controlled Allowance: owner directed site repairs.

NAICS Classification

NAICS 237110 – Water and Sewer Line and Related Structures Construction (Construction of water wells and associated infrastructure)., NAICS 541360 – Geophysical Surveying and Mapping Services (Performing downhole geophysical and deviation surveys)., NAICS 238990 – All Other Specialty Trade Contractors (Specialized well development, testing, and water treatment system installation related to well construction, including temporary GAC adsorption systems).

Records and Due Date

This bid opportunity was entered into BidAmerica on December 4, 2025, and was last updated on January 15, 2026. All bids and/or proposals are due on January 19, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Santa Monica City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Santa Monica City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Santa Monica City prior to bidding.

Ground Water Production Well SM-14 Drilling - Bid Opportunity | BidAmerica