Santa Rosa City is seeking bids from qualified and interested contractors for the following project titled, Route 101 Bicycle and Pedestrian Overcrossing, identified under Solicitation ID: C00769. Work is to be performed near 69 Stony Cir, Santa Rosa, CA 95401, USA in Sonoma County.

General Project Description

This project involves the construction of a 100% ADA compliant bicycle and pedestrian shared-use overcrossing spanning U.S. 101 to connect Elliot Avenue (Santa Rosa Junior College area) to Edwards Avenue (Coddingtown Shopping Center area) in Santa Rosa, California. The scope includes civil engineering and heavy construction for the bridge structure, site enhancements, landscaping (including tree protection and irrigation systems), utility work (sanitary sewer, water distribution, storm drain), temporary traffic control systems, pavement markings, and installation of specialized structural components like stay cables and tuned mass dampers. Extensive excavation, concrete work (structural, textured, and overlays), structural steel fabrication and erection, and miscellaneous metal installations are required. The project also entails significant site management, public safety measures, and environmental controls for stormwater and noise.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Construction Staking
  • Quantity: 1  Unit: LS  Work Item: Lead Compliance
  • Quantity: 1  Unit: LS  Work Item: Develop Water Supply
  • Quantity: 1  Unit: LS  Work Item: Construction Area Signs
  • Quantity: 1  Unit: LS  Work Item: Traffic Control System
  • Quantity: 60  Unit: EA  Work Item: Stationary Impact Attenuator Vehicle (Day)
  • Quantity: 18  Unit: EA  Work Item: Type I II Barricade
  • Quantity: 160  Unit: SF  Work Item: Temporary Pavement Marking (Paint)
  • Quantity: 14700  Unit: LF  Work Item: Temporary Traffic Stripe (Paint)
  • Quantity: 61  Unit: EA  Work Item: Channelizer (Surface Mounted)
  • Quantity: 6  Unit: EA  Work Item: Portable Flashing Beacons
  • Quantity: 360  Unit: EA  Work Item: Portable Radar Speed Feedback Sign System
  • Quantity: 2  Unit: EA  Work Item: Temporary Radar Speed Feedback Sign System
  • Quantity: 1  Unit: LS  Work Item: Job Site Management
  • Quantity: 1  Unit: LS  Work Item: Prepare Storm Water Pollution Prevention Plan
  • Quantity: 51  Unit: EA  Work Item: Storm Water Sampling & Analysis Day
  • Quantity: 2  Unit: EA  Work Item: Storm Water Annual Report
  • Quantity: 21  Unit: EA  Work Item: Temporary Drainage Inlet Protection
  • Quantity: 1680  Unit: LF  Work Item: Temporary Fiber Roll
  • Quantity: 5  Unit: EA  Work Item: Modified Temporary Construction Entrance (Type 2)
  • Quantity: 1  Unit: LS  Work Item: Street Sweeping
  • Quantity: 1  Unit: LS  Work Item: Temporary Concrete Washout
  • Quantity: 2230  Unit: LF  Work Item: Remove Yellow Thermo Traffic Stripe (Haz Waste)
  • Quantity: 1  Unit: LS  Work Item: Contractor -Supplied Biologist
  • Quantity: 1  Unit: LS  Work Item: Noise Monitoring
  • Quantity: 130  Unit: LF  Work Item: Remove Gas Line
  • Quantity: 940  Unit: LF  Work Item: Tree Protection (Temp. High Visibility Chain Link Fence)
  • Quantity: 1  Unit: LS  Work Item: Clearing And Grubbing
  • Quantity: 710  Unit: CY  Work Item: Roadway Excavation
  • Quantity: 22  Unit: CY  Work Item: Structure Excavation (Bridge)
  • Quantity: -  Unit: CY  Work Item: Structure Excavation (Type D)
  • Quantity: 11  Unit: EA  Work Item: Stepping Stones
  • Quantity: 5  Unit: EA  Work Item: Soil Testing
  • Quantity: 55  Unit: EA  Work Item: Plant (Group K)
  • Quantity: 1180  Unit: EA  Work Item: Plant (Group A)
  • Quantity: 370  Unit: EA  Work Item: Plant (Group B)
  • Quantity: 1  Unit: LS  Work Item: Maintain Existing Planted Areas
  • Quantity: 1  Unit: LS  Work Item: Plant Establishment Work (3 Year)
  • Quantity: 220  Unit: CY  Work Item: Wood Mulch (Tree Trimmings)
  • Quantity: 5  Unit: EA  Work Item: Cast Iron Tree Grate
  • Quantity: 810  Unit: SF  Work Item: Wire Rope Trellis System
  • Quantity: 1  Unit: LS  Work Item: Temporary Irrigation Sys (Water Truck)
  • Quantity: 1  Unit: LS  Work Item: Check And Test Existing Irrigation Facilities
  • Quantity: 1  Unit: LS  Work Item: Operate Existing Irrigation Facilities
  • Quantity: 6250  Unit: LF  Work Item: Control And Neutral Conductors
  • Quantity: 2  Unit: EA  Work Item: 1" Remote Control Valve (Master Valve)
  • Quantity: 2  Unit: EA  Work Item: 1" Wye Strainer Assembly
  • Quantity: 2  Unit: EA  Work Item: 12 Station Irrigation Controller (Wall Mounted)
  • Quantity: 15  Unit: LF  Work Item: 1" Copper Pipe (Supply Line)
  • Quantity: 9006  Unit: LF  Work Item: 1/2" Drip Irrigation Tubing
  • Quantity: -  Unit: LF  Work Item: 1/2" Drip Irrigation Tubing (Purple, Recycled Water)
  • Quantity: 2  Unit: EA  Work Item: Flow Sensor
  • Quantity: 20  Unit: EA  Work Item: Drip Valve Assembly
  • Quantity: 10  Unit: EA  Work Item: Drip Valve Assembly (Purple, Recycled Water)
  • Quantity: 49  Unit: EA  Work Item: 1" Gate Valve
  • Quantity: 1035  Unit: LF  Work Item: 1" Plastic Pipe (Schedule 40)(Supply Line)
  • Quantity: 264  Unit: LF  Work Item: 1" Plastic Pipe (Schedule 40)(Supply Line)(Purple, Recycled Water)
  • Quantity: 2337  Unit: LF  Work Item: 2" Plastic Pipe (Schedule 40)(Supply Line)
  • Quantity: 1163  Unit: LF  Work Item: 2" Plastic Pipe (Schedule 40)(Supply Line)(Purple, Recycled Water)
  • Quantity: 2  Unit: EA  Work Item: 1" Pressure Regulating Valve
  • Quantity: 9  Unit: EA  Work Item: Quick Coupling Valve (W/Swing Joint & Key & Hose Swivel)
  • Quantity: 6  Unit: EA  Work Item: Quick Coupling Valve (W/Swing Joint & Key & Hose Swivel) Purple, Recycled Water
  • Quantity: 15  Unit: LF  Work Item: PVC Pipe Conduit (Sleeve)(6" Class 315)
  • Quantity: 3  Unit: EA  Work Item: Collapsible Bollard
  • Quantity: 170  Unit: CY  Work Item: Compost
  • Quantity: 67  Unit: CY  Work Item: Class 2 Aggregate Base
  • Quantity: 840  Unit: TON  Work Item: Hot Mix Asphalt (Type A)
  • Quantity: -  Unit: TON  Work Item: Cold Plane Asphalt Concrete Pavement
  • Quantity: 423  Unit: CY  Work Item: Structural Concrete, Bridge (Polymer Fiber)
  • Quantity: 796  Unit: CY  Work Item: Structural Concrete, Retaining Wall
  • Quantity: 2510  Unit: SF  Work Item: Concrete Surface Texture A
  • Quantity: 1748  Unit: SF  Work Item: Concrete Surface Texture B
  • Quantity: 4  Unit: EA  Work Item: PTFE Spherical Bearing
  • Quantity: 15  Unit: LF  Work Item: Joint Seal (MR 1")
  • Quantity: 15  Unit: LF  Work Item: Joint Seal (MR 1 1/2")
  • Quantity: 123  Unit: LF  Work Item: Retaining Wall/Barrier At Bent 8 (Minor Structure)
  • Quantity: 102  Unit: CY  Work Item: Concrete Seat Walls (Minor Structure)
  • Quantity: 869000  Unit: LB  Work Item: Bar Reinforcing Steel (Bridge)
  • Quantity: 99420  Unit: LB  Work Item: Bar Reinforcing Steel (Retaining Wall)
  • Quantity: 176  Unit: EA  Work Item: Headed Bar Reinforcement
  • Quantity: 680561  Unit: LB  Work Item: Furnish Structural Steel (Superstructure)
  • Quantity: 162000  Unit: LB  Work Item: Furnish Structural Steel (Pylon)
  • Quantity: 1  Unit: LS  Work Item: Erect Structural Steel (Superstructure)
  • Quantity: 1  Unit: LS  Work Item: Erect Structural Steel (Pylon)
  • Quantity: 6230  Unit: LF  Work Item: Stay Cable Assemblies
  • Quantity: 29  Unit: LF  Work Item: Expansion Joint Assemblies
  • Quantity: 1  Unit: LS  Work Item: Tuned Mass Damper
  • Quantity: -  Unit: LS  Work Item: Clean And Paint Structural Steel
  • Quantity: 10557  Unit: SF  Work Item: Place Polyester Concrete Overlay
  • Quantity: 427  Unit: CF  Work Item: Furnish Polyester Concrete Overlay (Zinc)
  • Quantity: 367  Unit: CF  Work Item: Furnish Polyester Concrete Overlay (Zinc)(Integrally Colored)
  • Quantity: 5516  Unit: SF  Work Item: Place Polyester Concrete Overlay (Zinc)
  • Quantity: 691  Unit: LB  Work Item: Misc. Metal (Restrainer -Cable Type)
  • Quantity: 56  Unit: CY  Work Item: Concrete Backfill (Pipe Trench)
  • Quantity: 130  Unit: CY  Work Item: -

NAICS Classification

NAICS 237310 – Highway, Street, and Bridge Construction (Primary for the overcrossing, civil infrastructure, and traffic control devices), NAICS 237110 – Water and Sewer Line and Related Structures Construction (For the water distribution and sanitary sewer work), NAICS 237990 – Other Heavy and Civil Engineering Construction (Encompasses storm drain systems, earthwork, landscaping-related civil engineering, and general site improvements), NAICS 238910 – Site Preparation Contractors (For clearing, grubbing, roadway excavation, and general site preparation), NAICS 238190 – Other Foundation, Structure, and Building Exterior Contractors (Includes structural concrete work, structural steel erection, and specialized concrete overlays), NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors (For city street lighting, electrical systems, and bike/pedestrian counters), NAICS 238990 – All Other Specialty Trade Contractors (Covers traffic control systems, temporary pavement markings, fencing, and other specialized construction elements not fitting discrete categories), NAICS 541330 – Engineering Services (For pre/post construction surveys, soil testing, and construction management/inspection support)

Records and Due Date

This bid opportunity was entered into BidAmerica on November 19, 2025, and was last updated on November 18, 2025. All bids and/or proposals are due on December 16, 2025.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Santa Rosa City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Santa Rosa City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Santa Rosa City prior to bidding.

Route 101 Bicycle and Pedestrian Overcrossing - Bid Opportunity | BidAmerica