Loading...

Unofficial Notice of Invitation to Bid (NIB)

Temecula Valley Unified School District is seeking bids from qualified and interested contractors for the following project titled, Bleacher Repair and Replacement Services (Re-Bid), identified under Solicitation ID: 2025-26-103. Work is to be performed near 27215 Nicolas Rd, Temecula, CA 92591, USA in Riverside County.

General Project Description

This project is a re-bid for bleacher repair and replacement services at three high schools within the Temecula Valley Unified School District: Great Oak, Chaparral, and Temecula Valley High Schools. The scope involves furnishing all necessary labor, materials, equipment, and supervision to remove existing bleacher seats, rollers, and associated hardware, and to install new, compliant components (seats, benches, roller/wheel assemblies, and genuine OEM hardware) into the existing Hussey Seating Maxam bleacher systems. The contract also includes operational testing, adjustment, and final alignment for bleacher banks, as well as mobilization, gym floor protection, and site cleanup. Emergency call-out services for after-hours/weekend work are also required. The contract period is from March 1, 2026, to February 28, 2027, with the option for two additional one-year renewals.

General Bid Items

  • Quantity: Not Specified  Unit: EA  Work Item: Remove existing seating modules and hardware as required to convert one complete bleacher section to a single manufacturer, including salvage of serviceable seating. (Chaparral High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Furnish and install new Hussey OEM or Infinity seating modules for one complete bleacher section, including reuse of salvaged seating where directed and all new OEM hardware. (Chaparral High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Chaparral High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam drive wheel assembly (motor-mounted), including axle, bearings, spacers, and hardware. (Chaparral High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Chaparral High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Remove existing seating modules and hardware as required to convert one complete bleacher section to a single manufacturer, including salvage of serviceable seating. (Great Oak High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Furnish and install new Hussey OEM or Infinity seating modules for one complete bleacher section, including reuse of salvaged seating where directed and all new OEM hardware. (Great Oak High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Great Oak High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam drive wheel assembly (motor-mounted), including axle, bearings, spacers, and hardware. (Great Oak High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Great Oak High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Replace wood bench seat (Hussey compatible). (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Remove existing seating modules and hardware as required to convert one complete bleacher section to a single manufacturer, including salvage of serviceable seating. (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Furnish and install new Hussey OEM or Infinity seating modules for one complete bleacher section, including reuse of salvaged seating where directed and all new OEM hardware. (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam drive wheel assembly (motor-mounted), including axle, bearings, spacers, and hardware. (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EA  Work Item: Remove and replace Hussey Maxam row roller wheel assembly, including axle, bearings, spacers, and hardware. (Temecula Valley High School)
  • Quantity: Not Specified  Unit: EACH  Work Item: Bleacher system operational testing, adjustment, and final alignment for one bleacher bank. (Districtwide)
  • Quantity: 1  Unit: LS  Work Item: Mobilization, gym floor protection, and site cleanup. (Districtwide)
  • Quantity: Not Specified  Unit: PER HOUR  Work Item: Emergency Call-Out (after hours/weekend). (Districtwide)

NAICS Classification

NAICS 238990 – All Other Specialty Trade Contractors, NAICS 236220 – Commercial and Institutional Building Construction

Records and Due Date

This bid opportunity was entered into BidAmerica on December 23, 2025, and was last updated on January 15, 2026. All bids and/or proposals are due on January 21, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Temecula Valley Unified School District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Temecula Valley Unified School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Temecula Valley Unified School District prior to bidding.

Bleacher Repair and Replacement Services (Re-Bid) - Bid Opportunity | BidAmerica