Loading...

Unofficial Notice of Invitation to Bid (NIB)

Thousand Oaks City is seeking bids from qualified and interested contractors for the following project titled, 2026 PAVEMENT OVERLAY AND RESURFACING PROGRAM, identified under Solicitation ID: 2025/2026-14. Work is to be performed near 2100 Thousand Oaks Blvd, Thousand Oaks, CA 91362, USA in Ventura County.

General Project Description

This project involves furnishing all labor, materials, tools, equipment, and services for a comprehensive pavement overlay and resurfacing program throughout the City of Thousand Oaks. Key work items include pavement overlay treatment, pavement R&R (remove and replace) repair, application of striping and legends, construction of curb ramps at various locations, surface drainage improvements, and other miscellaneous asphaltic and concrete work. The project also entails demolition, clearing, grubbing, tree root repair, cold milling and digouts, asphalt paving, micro-surfacing, tack coat application, shoulder backing, pavement striping, and utility cover adjustments for wastewater manholes, storm drains, and valve/survey monuments. All work must comply with specifications and contract documents.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 2  Unit: EA  Work Item: Project Sign
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 21300  Unit: TON  Work Item: Asphalt Rubber Hot Mix (ARHM)
  • Quantity: 2000  Unit: TON  Work Item: Leveling Course
  • Quantity: 15600  Unit: SF  Work Item: 6" R&R
  • Quantity: 364  Unit: SF  Work Item: Tree Root Repair
  • Quantity: 23000  Unit: SY  Work Item: Full Width Mill 2.5”
  • Quantity: 70000  Unit: SY  Work Item: Full Width Mill 2”
  • Quantity: 25000  Unit: SY  Work Item: Tapered Mill 0” to 2”
  • Quantity: 17800  Unit: SY  Work Item: Tapered Mill 0” to 2.5”
  • Quantity: 196000  Unit: SY  Work Item: Tack Coat
  • Quantity: 84  Unit: EA  Work Item: Adjust Wastewater Manhole Cover to Grade
  • Quantity: 20  Unit: EA  Work Item: Adjust Storm Drain Manhole Cover to Grade
  • Quantity: 63  Unit: EA  Work Item: Adjust Valve Cover to Grade
  • Quantity: 29  Unit: EA  Work Item: Adjust Survey Well Monument to Grade
  • Quantity: 1  Unit: LS  Work Item: Remove Thermoplastic Striping
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic Loops Remove and Replace (CalTrans ROW Avenida De Los Arboles)
  • Quantity: 1  Unit: LS  Work Item: Traffic control and safety measures
  • Quantity: 1  Unit: LS  Work Item: CalTrans Encroachment Permit
  • Quantity: 1280  Unit: SF  Work Item: F Remove and Replace Spandrel
  • Quantity: 545  Unit: SF  Work Item: Remove and Replace Cross Gutter
  • Quantity: 1325  Unit: LF  Work Item: Remove and Replace Curb & Gutter
  • Quantity: 1100  Unit: SF  Work Item: F Remove and Replace Driveway Apron
  • Quantity: 1  Unit: LS  Work Item: Close-Out
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 21700  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 330  Unit: TON  Work Item: Leveling Course
  • Quantity: 15220  Unit: SF  Work Item: 2" R&R
  • Quantity: 321  Unit: SF  Work Item: 4" R&R
  • Quantity: 885  Unit: SF  Work Item: Tree Root Repair
  • Quantity: 9510  Unit: SY  Work Item: Full Width Mill 1.5”
  • Quantity: 11600  Unit: SY  Work Item: Tapered Milling 0” to 0.5”
  • Quantity: 92700  Unit: SY  Work Item: Tapered Milling 0” to 1.5”
  • Quantity: 277000  Unit: SY  Work Item: Tack Coat
  • Quantity: 178  Unit: EA  Work Item: Adjust Wastewater Manhole Cover to Grade
  • Quantity: 144  Unit: EA  Work Item: Adjust Storm Drain Manhole Cover to Grade
  • Quantity: 286  Unit: EA  Work Item: Adjust Valve Cover to Grade
  • Quantity: 59  Unit: EA  Work Item: Adjust Survey Well Monument to Grade
  • Quantity: 1  Unit: LS  Work Item: Remove Thermoplastic Striping
  • Quantity: 350  Unit: SF  Work Item: Remove and Replace Cross Gutter
  • Quantity: 70  Unit: SF  Work Item: Remove and Replace Curb & Gutter
  • Quantity: 400  Unit: SF  Work Item: F Remove and Replace Driveway Apron
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 1047  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 362  Unit: TON  Work Item: Leveling Course
  • Quantity: 5774  Unit: SF  Work Item: 6" R&R
  • Quantity: 132  Unit: SF  Work Item: Tree Root Repair
  • Quantity: 7556  Unit: SY  Work Item: Tapered Mill 0” to 2"
  • Quantity: 12815  Unit: SY  Work Item: Tack Coat
  • Quantity: 8  Unit: EA  Work Item: Adjust Wastewater Manhole Cover to Grade
  • Quantity: 8  Unit: EA  Work Item: Adjust Storm Drain Manhole Cover to Grade
  • Quantity: 21  Unit: EA  Work Item: Adjust Valve Cover to Grade
  • Quantity: 4  Unit: EA  Work Item: Adjust Survey Well Monument to Grade
  • Quantity: 1  Unit: LS  Work Item: Remove Thermoplastic Striping
  • Quantity: 85  Unit: SF  Work Item: Remove and Replace Cross Gutter
  • Quantity: 200  Unit: LF  Work Item: Remove and Replace Curb & Gutter
  • Quantity: 415  Unit: SF  Work Item: F Remove and Replace Driveway Apron
  • Quantity: 650  Unit: SF  Work Item: Remove and Replace Sidewalk
  • Quantity: 2  Unit: EA  Work Item: Reconstruct Curb Ramp
  • Quantity: 16  Unit: EA  Work Item: Modify Curb Ramp
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup
  • Quantity: 1  Unit: LS  Work Item: Close-Out
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 4700  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 18034  Unit: SY  Work Item: Tapered Milling 0” to 1.5”
  • Quantity: 57540  Unit: SY  Work Item: Tack Coat
  • Quantity: 20  Unit: EA  Work Item: Adjust Wastewater Manhole Cover to Grade
  • Quantity: 18  Unit: EA  Work Item: Adjust Storm Drain Manhole Cover to Grade
  • Quantity: 60  Unit: EA  Work Item: Adjust Valve Cover to Grade
  • Quantity: 40  Unit: EA  Work Item: Adjust Survey Well Monument to Grade
  • Quantity: 1  Unit: LS  Work Item: Remove Thermoplastic Striping
  • Quantity: 150  Unit: SF  Work Item: Remove and Replace Cross Gutter
  • Quantity: 25  Unit: SF  Work Item: Remove and Replace Curb & Gutter
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 1040  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 1616  Unit: SF  Work Item: 4" R&R
  • Quantity: 780  Unit: SF  Work Item: 6" R&R
  • Quantity: 15150  Unit: SY  Work Item: Full Width Mill 1.5”
  • Quantity: 15150  Unit: SY  Work Item: Tack Coat
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup
  • Quantity: 1  Unit: LS  Work Item: Close-Out
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 80  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 780  Unit: SF  Work Item: 6" R&R
  • Quantity: 1000  Unit: SY  Work Item: Full Width Mill 1.5”
  • Quantity: 1000  Unit: SY  Work Item: Tack Coat
  • Quantity: 1  Unit: LS  Work Item: Construct New Drainage System Per plan
  • Quantity: 1  Unit: LS  Work Item: Close-Out
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 10478  Unit: SF  Work Item: 2" R&R
  • Quantity: 4957  Unit: SF  Work Item: 4" R&R
  • Quantity: 3434  Unit: SF  Work Item: Tree Root Repair
  • Quantity: 3200  Unit: SY  Work Item: Micro Milling
  • Quantity: 375  Unit: SF  Work Item: Remove and Replace Cross Gutter
  • Quantity: 324  Unit: LF  Work Item: Remove and Replace Curb & Gutter
  • Quantity: 243  Unit: SF  Work Item: F Remove and Replace Driveway Apron
  • Quantity: 488  Unit: SF  Work Item: Remove and Replace Sidewalk
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup
  • Quantity: 1  Unit: LS  Work Item: Close-Out
  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Erosion & Pollution Control, BMP’s
  • Quantity: 5780  Unit: TON  Work Item: Thin AC Overlay
  • Quantity: 70800  Unit: SY  Work Item: Full Width Mill 1.5”
  • Quantity: 70800  Unit: SY  Work Item: Tack Coat
  • Quantity: 1  Unit: LS  Work Item: Traffic signs, striping (Thermoplastic), markers and legends
  • Quantity: 1  Unit: LS  Work Item: Traffic control and cleanup

NAICS Classification

237310 – Highway, Street, and Bridge Construction, 238910 – Site Preparation Contractors, 237110 – Water and Sewer Line and Related Structures Construction, 237990 – Other Heavy and Civil Engineering Construction, 238110 – Poured Concrete Foundation and Structure Contractors

Records and Due Date

This bid opportunity was entered into BidAmerica on December 9, 2025, and was last updated on January 16, 2026. All bids and/or proposals are due on January 21, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Thousand Oaks City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Thousand Oaks City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Thousand Oaks City prior to bidding.

2026 PAVEMENT OVERLAY AND RESURFACING PROGRAM - Bid Opportunity | BidAmerica