Loading...

Unofficial Notice of Invitation to Bid (NIB)

Tustin Unified School District is seeking bids from qualified and interested contractors for the following project titled, Summer Maintenance 2026 Roof Replacements (Contract No. 1 Peters Canyon Elementary School; Contract No. 2 Columbus Tustin Middle School), identified under Solicitation ID: 386. Work is to be performed near 26900 Peters Canyon Rd, Tustin, CA 92782, USA in Orange County.

General Project Description

This project involves comprehensive roof replacements and maintenance across two school campuses: Peters Canyon Elementary School and Columbus Tustin Middle School. The work generally includes demolition and tear-off of existing roofing systems, repair of damaged structural components, and installation of new cold process monolithic built-up roofing or single-ply reinforced emulsion roofing systems. Specific tasks also cover flashing, metal work (edge metal, skirts, scuppers), roof receptor replacement, tapered insulation system installation, roof coating, and overall site clean-up. Contractors are required to comply with all applicable labor and safety regulations, including lead-based paint and asbestos protocols.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Peters Canyon Elementary School (Contract No. 1) - Complete tear-off of existing roof system.
  • Quantity: As required  Unit: LS  Work Item: Peters Canyon Elementary School (Contract No. 1) - Repair and/or replace damaged or rotted plywood on wood deck.
  • Quantity: 1  Unit: LS  Work Item: Peters Canyon Elementary School (Contract No. 1) - Complete demolition of canopy system.
  • Quantity: 1  Unit: LS  Work Item: Peters Canyon Elementary School (Contract No. 1) - Install new four-ply BUR Reinforced Monolithic Roof Surface w/ Reflective Acrylic Topcoat Assembly. Specifications: Mechanically fasten 1 layer of Henry 606 80# Premium SBS-Modified Mineral-Surfaced Underlayment. Install 3 plies of Henry 604 25# Fiberglass Base Sheet, adhered with Henry 902 Permanent Bond Adhesive. Install Base Flashing with Henry 180 ModifiedPlus NP180gM4, adhered with Henry 902 Permanent Bond Adhesive (2 gallons/100 sq.ft). Apply Pro-Grade 294 Base Coat at 2 gallons per 100 sq.ft per coat. Apply Pro-Grade 280 White Elastomeric Roof Coating at 1 1/2 gallons per 100 sq.ft per coat. Broadcast 20 lbs. of ceramic granules per 100 sq.ft into wet topcoat.
  • Quantity: 1  Unit: LS  Work Item: Peters Canyon Elementary School (Contract No. 1) - Recover System Activity Center Building. Specifications: Install 1 ply of #195 or #196 Polyester Sheet in 1 layer of Pro-Grade 197 Asphalt Emulsion (4 gallons/sq). Surface with Pro-Grade 197 Asphalt Emulsion, reinforced with #189 Chopped Fiberglass.

NAICS Classification

NAICS 238160 – Roofing Contractors (Primary work: tearing off existing roofs, installing new built-up and reinforced membrane roofing systems, applying roof coatings, and related flashing)., NAICS 238910 – Site Preparation Contractors (For demolition/tear-off of existing roof systems and any site-specific preparation)., NAICS 238190 – Other Foundation, Structure, and Building Exterior Contractors (For general building exterior activities, including installation of sheet metal components like edge metal, skirts, and scuppers)., NAICS 238350 – Finish Carpentry Contractors (For repair or replacement of plywood on decks, and installation of wood nailers or skirts around AC units).

Records and Due Date

This bid opportunity was entered into BidAmerica on February 11, 2026, and was last updated on February 11, 2026. All bids and/or proposals are due on February 19, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Tustin Unified School District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Tustin Unified School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Tustin Unified School District prior to bidding.

Summer Maintenance 2026 Roof Replacements (Contract No. 1 Peters Canyon Elementary School; Contract No. 2 Columbus Tustin Middle School) - Bid Opportunity | BidAmerica