Union City is seeking bids from qualified and interested contractors for the following project titled, Kennedy Park Improvements, Phase I Project, identified under Solicitation ID: 24-15. Work is to be performed near 13th St, Union City, CA 94587, USA in Alameda County.
General Project Description
This project is for the Phase I improvements at Kennedy Park in Union City, California. The scope of work includes the rehabilitation of parking lot pavement surfaces, base, and subbase, along with site drainage and associated facilities, including the installation of a new bioswale area. ADA improvements, irrigation for new vegetation, and tree planting are also required. The work encompasses various civil engineering tasks such as concrete demolition, curb and gutter demolition, landscape removal, roadway excavation, installation of PCC sidewalks, curbs, gutters, and driveways, hot mix asphalt placement, aggregate base recycling, utility adjustments (sanitary sewer manhole and cleanout covers), bioretention area construction (excavation, deep curb, deep curb & gutter, overflow inlet modification, perforated pipe, cleanout, planting, soil medium, irrigation, planting establishment, lateral bracing, energy dissipator), tree installation, thermoplastic traffic stripes, thermoplastic markings (symbols & legends), sign & post installation, sign & post resetting, potholing, and root barrier installation. All work must conform to Caltrans Standard Specifications and City of Union City Standard Specifications.
General Bid Items
- Quantity: 1 Unit: LS Work Item: Mobilization (Max. 5% of Total Bid)
- Quantity: 1 Unit: LS Work Item: Traffic and Pedestrian Control
- Quantity: 1 Unit: LS Work Item: Stormwater Pollution Prevention Plan
- Quantity: 1313 Unit: SF Work Item: Concrete Demolition
- Quantity: 426 Unit: LF Work Item: Concrete Curb Demolition
- Quantity: 235 Unit: LF Work Item: Concrete Curb & Gutter Demolition
- Quantity: 404 Unit: SF Work Item: Landscape Removal
- Quantity: 12187 Unit: SF Work Item: Roadway Excavation
- Quantity: 1 Unit: EA Work Item: Tree Removal
- Quantity: 798 Unit: SF Work Item: PCC Sidewalk
- Quantity: 301 Unit: LF Work Item: PCC Curb & Gutter
- Quantity: 183 Unit: LF Work Item: PCC Curb
- Quantity: 26 Unit: LF Work Item: 12” Retaining Curb
- Quantity: 310 Unit: SF Work Item: PCC Driveway
- Quantity: 11 Unit: SF Work Item: PCC Concrete Band
- Quantity: 2 Unit: EA Work Item: PCC ADA Curb Ramp
- Quantity: 343 Unit: TN Work Item: Type A Hot Mix Asphalt, Specifications: 4.5” Thick Pavement
- Quantity: 18 Unit: TN Work Item: Type A Hot Mix Asphalt, Specifications: 12” Deep Lift
- Quantity: 151 Unit: CY Work Item: Recycle Class 2 Aggregate Base, Specifications: 4.0” Thick
- Quantity: 1 Unit: EA Work Item: Adjust Sanitary Sewer Manhole Cover to Grade
- Quantity: 1 Unit: EA Work Item: Adjust Sanitary Cleanout Cover to Grade
- Quantity: 22 Unit: CY Work Item: Bioretention Area – Landscape Removal, Specifications: Depth of Bioretention
- Quantity: 45 Unit: CY Work Item: Bioretention Area – Excavation, Specifications: Depth of Bioretention
- Quantity: 42 Unit: LF Work Item: Bioretention Area – Deep Curb
- Quantity: 56 Unit: LF Work Item: Bioretention Area – Deep Curb & Gutter
- Quantity: 1 Unit: EA Work Item: Bioretention Area – Modify to Overflow Inlet
- Quantity: 59 Unit: LF Work Item: Bioretention Area – 6” Perforated Pipe
- Quantity: 4 Unit: EA Work Item: Bioretention – Cleanout
- Quantity: 1 Unit: LS Work Item: Bioretention – Planting
- Quantity: 497 Unit: SF Work Item: Bioretention – Soil Medium
- Quantity: 1 Unit: LS Work Item: Bioretention – Irrigation
- Quantity: 1 Unit: LS Work Item: Bioretention – Planting Establishment Period (1 year)
- Quantity: 90 Unit: LF Work Item: Bioretention – Lateral Bracing – 6’ spacing
- Quantity: 3 Unit: EA Work Item: Bioretention – Energy Dissipator
- Quantity: 2 Unit: EA Work Item: Tree
- Quantity: 583 Unit: LF Work Item: Thermoplastic Traffic Stripes, Specifications: 6” White Line
- Quantity: 72 Unit: SF Work Item: Thermoplastic Markings, Specifications: Symbols & Legends
- Quantity: 2 Unit: EA Work Item: Sign & Post
- Quantity: 2 Unit: EA Work Item: Reset Sign & Post
- Quantity: 8 Unit: EA Work Item: Potholing
- Quantity: 154 Unit: LF Work Item: Root Barrier
- Quantity: 60 Unit: LF Work Item: Irrigation Sleeves
NAICS Classification
237310 – Highway, Street, and Bridge Construction, 238910 – Site Preparation Contractors, 237990 – Other Heavy and Civil Engineering Construction, 238160 – Roofing Contractors, 238210 – Electrical Contractors and Other Wiring Installation Contractors, 238190 – Other Foundation, Structure, and Building Exterior Contractors, 541320 - Landscape Architectural Services, 541330 - Engineering Services
Records and Due Date
This bid opportunity was entered into BidAmerica on February 9, 2026, and was last updated on February 23, 2026. All bids and/or proposals are due on February 24, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Union City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Union City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Union City prior to bidding.