Ventura Unified School District is seeking bids from qualified and interested contractors for the following project titled, #E21-26 ATLAS School Roofing Replacement, identified under Solicitation ID: E21-26. Work is to be performed near 760 Jazmin Ave, Ventura, CA 93004, USA in Ventura County.

General Project Description

This project involves the comprehensive replacement of the existing roof system at Atlas School, including the removal of the old roof down to the wood deck, repair of any damaged wood decking and fascia, and installation of a new roofing system. The new roofing system will include two plies of R-Mer Seal Underlayment and GAF Reflector Series lifetime dimensional shingles. The scope also entails the replacement of all non-mechanical vents, breathers, heat stacks, penetration flashings, gutters (22GA R-Mer flat sheet), and downspouts (schedule 30 steel pipe, primed & coated). Additionally, the project includes elastomeric acrylic wall coating on connecting walls, involving surface pressure washing, crack sealing, and two-coat damp proofing application. The project requires all labor, materials, and equipment to complete the removal and installation as a "turnkey" project, with owner-furnished "Garland" roofing materials. Replacement of 100% of roof decking material on 'Building D' and fascia boards, including painting, is also required. Potential hazardous material (asbestos and lead-based paint) abatement is identified as part of the work, requiring specific protocols. The work is planned for the summer recess to avoid student and staff interference, with provisions for overtime and weekend work.

General Bid Items

  • Quantity: -  Unit: -  Work Item: Removal of existing roofing system down to wood deck.
  • Quantity: -  Unit: -  Work Item: Repair of deficiencies in wood deck and fascia.
  • Quantity: -  Unit: -  Work Item: Installation of two plies of R-Mer Seal Underlayment.
  • Quantity: -  Unit: -  Work Item: Installation of GAF Reflector Series lifetime dimensional shingles, Specifications: Owner-selected color or approved equal, UL 790 Class A rated, UL 997 Wind Resistance Label, ASTM D 7158, Class H.
  • Quantity: -  Unit: -  Work Item: Replacement of all non-mechanical rooftop air vents, heat stacks, breathers, and penetration flashings, Specifications: New materials, painted to match shingles.
  • Quantity: -  Unit: -  Work Item: Installation of new gutters, Specifications: 22GA R-Mer flat sheet, owner-selected style/color, from Garland's standard/designer list.
  • Quantity: -  Unit: -  Work Item: Installation of new downspouts, Specifications: 3" min schedule 30 steel pipe, maximum 50’ spacing, primed and coated to match gutters.
  • Quantity: -  Unit: -  Work Item: Pressure wash entire roof surface (metal surface roof restoration).
  • Quantity: -  Unit: -  Work Item: Seal all cracks larger than 1/8" on walls, Specifications: Tuff Stuff sealant.
  • Quantity: -  Unit: -  Work Item: Apply Tuff Coat dampproof wall coating, Specifications: Two-coat application, 1 gallon per 100 sqft total (2 gallons per 100 sqft total wet film thickness 32 mils).
  • Quantity: -  Unit: -  Work Item: Mechanically fasten ½” Densdeck prime coverboard, Specifications: Per approved wind uplift criteria.
  • Quantity: -  Unit: -  Work Item: Install one ply Stressbase 80, Specifications: Set in GreenLock adhesive (2.5 gal/100sf).
  • Quantity: -  Unit: -  Work Item: Install one ply KEE-Stone HP, Specifications: Set in KEE-Lock spatter spray foam adhesive per product wind uplift criteria and datasheets.
  • Quantity: -  Unit: -  Work Item: All vertical flashings, Specifications: KEE-Stone HP Non-fleeceback membrane in a two-ply application.
  • Quantity: -  Unit: -  Work Item: Drip edge conditions replacement, Specifications: New Solarbrite KEE clad metal.
  • Quantity: -  Unit: -  Work Item: Termination bar application, Specifications: Set on all flashings in butyl tape, sealed with Tuff Stuff sealant.
  • Quantity: -  Unit: -  Work Item: Curbs replacement/modification, Specifications: Minimum 6-8” height.
  • Quantity: -  Unit: -  Work Item: Expansion joints replacement, Specifications: KEE-Stone roofing membrane.
  • Quantity: -  Unit: -  Work Item: Conduit support, Specifications: Viking C-Port supports (replacing all wood blocks for conduit).
  • Quantity: -  Unit: -  Work Item: Positive attachments (U-Anchor attachments to conduit) support, Specifications: Sleepers per Garland sleeper detail.
  • Quantity: -  Unit: -  Work Item: Walkway pads, Specifications: 3’ wide Viking KEE Walkway pads leading to/around rooftop mechanical equipment.
  • Quantity: -  Unit: -  Work Item: Replacement of 100% of roof decking material on 'Building D'.
  • Quantity: -  Unit: -  Work Item: Replacement and painting of fascia boards.
  • Quantity: -  Unit: -  Work Item: Asbestos abatement of roof penetration mastic (Building T).
  • Quantity: -  Unit: -  Work Item: Lead-based paint stabilization/removal per protocol.

NAICS Classification

NAICS 238160 – Roofing Contractors, NAICS 238320 – Painting and Wall Covering Contractors, NAICS 238190 – Other Foundation, Structure, and Building Exterior Contractors, NAICS 562910 – Remediation Services

Records and Due Date

This bid opportunity was entered into BidAmerica on December 23, 2025, and was last updated on January 26, 2026. All bids and/or proposals are due on January 30, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Ventura Unified School District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Ventura Unified School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Ventura Unified School District prior to bidding.