University of California San Diego is seeking bids from qualified and interested contractors for the following project titled, Shiley Eye Institute Low Vision Clinic - Bid Package 6.01 Framing/Drywall/Insulation, identified under Solicitation ID: 5728. Work is to be performed near Torrey Pines Center, 10280 N Torrey Pines Rd, La Jolla, CA 92037, USA in San Diego County.
General Project Description
This project involves the conversion of existing medical records and workroom areas within the Shiley Eye Institute Low Vision Clinic on the UC San Diego La Jolla Campus into a new Low Vision Clinic. The scope includes establishing an exam room, a display room, and an adjacent workroom (approximately 667 sf). The project also requires upgrades to meet current code and accessibility standards and includes necessary infrastructure improvements (HVAC, electrical, and plumbing). Bid Package 6.01 specifically covers the furnishing of all supervision, materials, labor, equipment, and lower-tier subcontracts required for wall and ceiling framing, drywall finishing, and insulation in an occupied clinical building.
General Bid Items
- Quantity: - Unit: - Work Item: Coordinate framing of walls and ceilings around ductwork, electrical, plumbing utilities and verify ahead of the project schedule any issues with the details provided in the contract documents.
- Quantity: - Unit: - Work Item: Framing, hanging, and finishing for suspended gypsum ceilings and soffits as shown in the contract documents around ductwork, electrical and plumbing utilities.
- Quantity: - Unit: - Work Item: Patch and repair of walls and ceilings at demolition of ACT angle where existing walls are to remain.
- Quantity: - Unit: - Work Item: Provide framing & drywall of hard lid ceiling in corridor at E7/A501.
- Quantity: - Unit: - Work Item: All framing and drywall scope shown on the contract documents including walls, ceilings, and soffits.
- Quantity: - Unit: - Work Item: Backing for all wall mounted equipment, casework, accessories, etc. Follow all backing details and utilize all interior elevations. Include layout for required backing.
- Quantity: - Unit: - Work Item: Restopping at top and bottom of rated walls and acoustical sealant at sound walls.
- Quantity: - Unit: - Work Item: Reveals, trims, etc., for work including adjacent materials as indicated.
- Quantity: Reference contract documents Unit: - Work Item: Install access panels in drywall. (Other subcontractors will supply access panels and layout on the floor prior to framing. Reference contract documents for QTY and type of access.)
- Quantity: - Unit: - Work Item: Include coordination with DFH and Glass subcontractors and their submittals for door and window RO's and headers/jambs/sills.
- Quantity: - Unit: - Work Item: Properly seal all penetrations made by this trade, including escutcheons, caulking, link-seals, insulation, firestopping, grout/concrete, etc. Sealing method depends on what the penetration is through (sound wall, rated wall, floor, roof, etc.).
- Quantity: - Unit: - Work Item: Export and dispose of all excess spoils generated by this trade.
- Quantity: - Unit: - Work Item: Include own cutting/coring for any penetrations needed for that trade, regardless of penetration type (wall, slab, roof, exterior, etc.).
- Quantity: - Unit: - Work Item: Include utility scanning (and, if necessary, potholing) prior to cutting, coring, drilling or digging to ensure existing utilities are identified and avoided. Hand digging is required when within 5' of any live utility.
- Quantity: - Unit: - Work Item: Include all anchors/hangers/supports/seismic bracing needed for this trade's work, vertically and horizontally.
- Quantity: - Unit: - Work Item: Include any equipment needed to load or unload materials or execute each trade's work, including forklifts, scissors lifts, reach forks, boom lifts, etc.
- Quantity: - Unit: - Work Item: Include plastic barriers and/or containment pods for work done in occupied spaces.
- Quantity: - Unit: - Work Item: Include cleanup of dust and debris at the end of each shift. If area of work must return to operation after work shift ends, subcontractor must return area to normal (re-install ceiling tiles, etc.).
NAICS Classification
NAICS 238130 – Framing Contractors, NAICS 238310 – Drywall and Insulation Contractors
Records and Due Date
This bid opportunity was entered into BidAmerica on December 5, 2025, and was last updated on December 4, 2025. All bids and/or proposals are due on December 17, 2025.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by University of California San Diego.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by University of California San Diego. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from University of California San Diego prior to bidding.