Unofficial Notice of Invitation to Bid (NIB)

Santee City is seeking bids from qualified and interested contractors for the following project titled, CITYWIDE FIBER COMMUNICATIONS UPGRADES, identified under Solicitation ID: CIP 2022-55. Work is to be performed near 10601 Magnolia Ave, Santee, CA 92071, USA in San Diego County.

General Project Description

This project involves citywide fiber communications upgrades and includes furnishing and installing communications conduit, pull boxes, splice vaults, fiber optic cabling, and related equipment. It also entails site preparation, concrete repair and replacement at various city locations (including roadways and sidewalks), roadway surfacing, earthwork, traffic striping, and temporary traffic control measures. The work requires adherence to Caltrans, Greenbook, and San Diego Area Regional Standard Drawings, with a focus on comprehensive infrastructure improvements for fiber optic networks.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization.
  • Quantity: 1  Unit: LS  Work Item: Stormwater (Water Pollution Control measures, including installation, maintenance, inspection, and removal of BMPs).
  • Quantity: 1  Unit: LS  Work Item: Traffic Control (Preparation of traffic control plans, cones, signs, message boards, flaggers, detours, delineators, barrels, striping removal, temporary striping, and markings).
  • Quantity: 5555  Unit: LF  Work Item: Install Conduit. Specifications: Schedule 40 Type A extruded rigid PVC (UL 651) or high-density polyethylene Type IPS, SDR 9 (ASTM F2160) for horizontal directional drilling. Placed a minimum of 30" to maximum 60" below finished grade, with 2" sand layer and 12" slurry/clean natural sand cover.
  • Quantity: 570  Unit: LF  Work Item: Install Metal Conduit. Specifications: Hot-dipped galvanized rigid steel (UL 6, ANSI C80.1, UL 514B fittings) (Caltrans Type 1 Metal Conduit) for Magnolia Ave San Diego River Bridge. Wrapped with two layers of 10 mil all-weather tape when in ground.
  • Quantity: 13  Unit: EA  Work Item: Install Pull Box. Specifications: Caltrans Type 6 communications pull boxes compliant with ANSI/SCTE 77 Tier 22 load rating, gray, Fiberlyte or approved equal, bolt-down lids. Inscribed "SANTEE COMMUNICATIONS".
  • Quantity: 4  Unit: EA  Work Item: Replace Pull Box. Specifications: Caltrans Type 6 communications pull boxes compliant with ANSI/SCTE 77 Tier 22 load rating, gray, Fiberlyte or approved equal, bolt-down lids. Inscribed "SANTEE COMMUNICATIONS".
  • Quantity: 6  Unit: EA  Work Item: Install Conduit into Existing Pull Box.
  • Quantity: 2  Unit: EA  Work Item: Install Splice Vault. Specifications: Christy N48 (30"x48") or approved equal, compliant with ANSI/SCTE 77 Tier 22 load rating, gray, Fiberlyte or approved equal, bolt-down lids. Inscribed "SANTEE COMMUNICATIONS".
  • Quantity: 9100  Unit: LF  Work Item: Fiber Optic Cable – 60 Strand. Specifications: Single mode fiber optic (SMFO), Corning ALTOS Loose Tube, Gel-Free, All-Dielectric Cable with FastAccess Technology or approved equal, G.652.D, UL listed, NEC standards, with #12 AWG tracer wire.
  • Quantity: 9100  Unit: LF  Work Item: Fiber Optic Cable – 48 Strand. Specifications: Single mode fiber optic (SMFO), Corning ALTOS Loose Tube, Gel-Free, All-Dielectric Cable with FastAccess Technology or approved equal, G.652.D, UL listed, NEC standards, with #12 AWG tracer wire.
  • Quantity: 22600  Unit: LF  Work Item: Fiber Optic Cable – 24 Strand. Specifications: Single mode fiber optic (SMFO), Corning ALTOS Loose Tube, Gel-Free, All-Dielectric Cable with FastAccess Technology or approved equal, G.652.D, UL listed, NEC standards, with #12 AWG tracer wire.
  • Quantity: 1  Unit: LS  Work Item: Fiber Equipment (Furnishing and installing rack mount fiber closet connector and splice housing (CCS), splice cassettes (Corning, CCH-CS12-A9-P00RE), splice trays, and BPEO splice closures (Corning, BPEO-S15-ALT-12T1-D95-2S8)).
  • Quantity: 1  Unit: LS  Work Item: Fiber Optic Splicing (Installing fiber into splice closures, labeling, fusion splicing, and testing fiber optic cables).

NAICS Classification

NAICS 237130 – Power and Communication Line and Related Structures Construction, NAICS 238210 – Electrical Contractors, NAICS 237310 – Highway, Street, and Bridge Construction, NAICS 238910 – Site Preparation Contractors, NAICS 238110 – Poured Concrete Foundation and Structure Contractors

Records and Due Date

This bid opportunity was entered into BidAmerica on December 10, 2025, and was last updated on January 12, 2026. All bids and/or proposals are due on January 14, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Santee City.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Santee City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Santee City prior to bidding.