Loading...

Unofficial Notice of Invitation to Bid (NIB)

Tahoe City Public Utility District is seeking bids from qualified and interested contractors for the following project titled, Madden Creek Water System Improvement Project, Phase 4, identified under Solicitation ID: -. Work is to be performed near 221 Fairway Dr, Tahoe City, CA 96145, USA in Placer County.

General Project Description

This project, Phase 4 of the Madden Creek Water System Improvement, involves upgrading water infrastructure across various streets in Homewood, Placer County, California, including Sans Souci Terrace, Sacramento Avenue, Cherry Street, Fern Street, Oak Street, Trout Street, and Silver Street. The scope includes the installation, replacement, and abandonment of fully restrained C900-DR14 PVC and HDPE water lines of various diameters (8", 12", 14"), along with associated fittings such as DIP tees, gate valves (GV), fire hydrant assemblies (FH), air release valve (ARV) assemblies, and elbows. The project also entails trench excavation, backfill, placement of aggregate base, and the installation of removable bollards, locator wire, and erosion control measures. Overall civil details and water service modifications are included.

General Bid Items

  • Quantity: 384  Unit: LF  Work Item: Install 8" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 6+00 - 9+84
  • Quantity: 524  Unit: LF  Work Item: Install 8" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 6+00 - 11+24
  • Quantity: 500  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 6+00 - 11+00
  • Quantity: 500  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 16+00 - 21+00
  • Quantity: 413  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 35+00 - 39+07
  • Quantity: 119  Unit: LF  Work Item: Install 8" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 39+07 - 40+254
  • Quantity: 208  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 1+10 - 3+18
  • Quantity: 137  Unit: LF  Work Item: Install 8" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 1+10 - 2+47
  • Quantity: 508  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 1+10 - 6+184
  • Quantity: 399  Unit: LF  Work Item: Install 12" Fully Restrained C900-DR14 PVC Water Line, Specifications: STA: 1+10 - 5+09, Max Bending Radius 300'
  • Quantity: 1  Unit: EA  Work Item: Install 8" Gate Valve (FL)
  • Quantity: 1  Unit: EA  Work Item: Install 8"x6"x8" DIP Tee (FL)
  • Quantity: 1  Unit: EA  Work Item: Install 8"x12" DIP Tee (FL)
  • Quantity: 1  Unit: EA  Work Item: Install Fire Hydrant Assembly
  • Quantity: 1  Unit: EA  Work Item: Install 12" Gate Valve (FL)
  • Quantity: 1  Unit: EA  Work Item: Install Air Release Valve Assembly
  • Quantity: 1  Unit: EA  Work Item: Install 12"x6" DIP Tee (FL)
  • Quantity: 1  Unit: EA  Work Item: Install 12"x12" DIP Tee (FL)
  • Quantity: 1  Unit: EA  Work Item: Connect to Existing 6" Water Line
  • Quantity: 1  Unit: EA  Work Item: Connect to Proposed 8" Water Line, Specifications: W/ 45° Fitting
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 22.5° Horiz Bend, 3°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 22.5° Horiz Bend, 13°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 22.5° Horiz Bend, 14°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 45° Horiz Bend, 14°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 45° Horiz Bend, 15°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Rotate Bend, Specifications: 90° Horiz Bend, 4°± Vertical Deflection
  • Quantity: 1  Unit: EA  Work Item: Horizontal Directional Drilling (HDD) Method, Specifications: Install 14" DR11 HDPE Pipe
  • Quantity: 1  Unit: EA  Work Item: Install 14" HDPE Flange Adapter, Specifications: 14" Bolted Mechanical RFCA or Fused 14" Flange Adapter
  • Quantity: 1  Unit: EA  Work Item: Install 12" RFCA
  • Quantity: 1  Unit: EA  Work Item: Install 12" Restrained Flexible Coupling
  • Quantity: 1  Unit: EA  Work Item: Install 12"x14" Flanged Eccentric Reducer
  • Quantity: 1  Unit: EA  Work Item: Install 12" 90° Elbow, Specifications: W/TB, 12" RFCA
  • Quantity: 1  Unit: EA  Work Item: Install 6" RFCA
  • Quantity: 1  Unit: EA  Work Item: Install 6" 90° Elbow, Specifications: W/TB, Fully Restrained PVC (C900-DR14) Pipe
  • Quantity: 1  Unit: EA  Work Item: Trench Excavation and Backfill, Specifications: Placer County - Longitudinal Trench (N.T.S.2), Placer County - Transverse Trench (N.T.S.3)
  • Quantity: 1  Unit: EA  Work Item: Concrete Plug Existing 18" Pipeline End
  • Quantity: 1  Unit: EA  Work Item: Abandonment of Existing Water Main, Specifications: Pressure grouting or blown sand fill for 16" and larger pipes
  • Quantity: 1  Unit: EA  Work Item: Install Standard Fire Hydrant
  • Quantity: 1  Unit: EA  Work Item: Install Locator Wire
  • Quantity: 1  Unit: EA  Work Item: Install Fire Hydrant Posts and Pad
  • Quantity: 1  Unit: EA  Work Item: Install Valve and Valve Box
  • Quantity: 1  Unit: EA  Work Item: Install Air Release Valve
  • Quantity: 1  Unit: EA  Work Item: Install Blow Off Valve
  • Quantity: 1  Unit: EA  Work Item: Install Valley Gutter
  • Quantity: 1  Unit: LS  Work Item: Granular Base Course, Specifications: Class 2, 3/4" Max, Compact to 95% Relative Compaction (ASTM 1557), 6" Aggregate Base (AB) Recompact 8" of Subgrade to 90% Relative Compaction (ASTM D 1557)
  • Quantity: 1  Unit: EA  Work Item: Abandon Surface Box/Risers, Specifications: Remove (E) Valve Box, Remove/Cut Riser, Fill Riser with Minor Concrete, Backfill and Pavement Restoration per County Requirements
  • Quantity: 1  Unit: EA  Work Item: Install Removable Bollard, Specifications: 36" Tall x 4" OD Schedule 40 Pipe, Powder Coat White, Blockaides Model IBP04040 or approved equal, Stainless Steel Embedment Sleeve, Precast Concrete Vault, CIP Concrete Footing
  • Quantity: 1  Unit: LS  Work Item: Erosion Control Plan Implementation, Specifications: Silt fence, fiber rolls, drain inlet protection, gravel bags, dust control practices required for grading activity.
  • Quantity: 1  Unit: LS  Work Item: Dewatering Plan Approval and Implementation, Specifications: Submitted to TCPUD and TRPA for review and approval if ground or surface water is intercepted.

NAICS Classification

NAICS 237110 – Water and Sewer Line and Related Structures Construction, NAICS 237990 – Other Heavy and Civil Engineering Construction, NAICS 238910 – Site Preparation Contractors

Records and Due Date

This bid opportunity was entered into BidAmerica on February 11, 2026, and was last updated on February 11, 2026. All bids and/or proposals are due on February 16, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Tahoe City Public Utility District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Tahoe City Public Utility District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Tahoe City Public Utility District prior to bidding.

Madden Creek Water System Improvement Project, Phase 4 - Bid Opportunity | BidAmerica