Yolo County is seeking bids from qualified and interested contractors for the following project titled, East Esparto Sidewalk Improvement Feasibility Study and Design Project, identified under Solicitation ID: Bid# RFP-2025-0042. Work is to be performed near 625 Court St, Woodland, CA 95695, USA in Yolo County.
General Project Description
The County of Yolo Department of Community Services is soliciting proposals from qualified consultants for the East Esparto Sidewalk Improvement Feasibility Study and Design Project. This federally funded initiative aims to enhance pedestrian safety and address existing drainage challenges along Winters Street, Grafton Street, and Plainfield Street in Esparto, Yolo County. The project involves a comprehensive study to analyze current drainage conditions, assess the feasibility of adding sidewalks, develop and evaluate design alternatives, conduct geotechnical investigations, perform environmental studies for NEPA/CEQA compliance, and prepare final plans, specifications, and estimates (PS&E). The scope also includes managing right-of-way (ROW) and utilities relocation efforts. Optional engineering support during bidding and construction phases may also be required.
General Bid Items
- Quantity: - Unit: - Work Item: Task 1: Project Management and Coordination
- Quantity: - Unit: - Work Item: Baseline Schedule Submittal
- Quantity: - Unit: - Work Item: Project Management Plan (PMP)
- Quantity: - Unit: - Work Item: Quality Management Plan (QMP)
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Conduct detailed field surveys
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Document existing drainage infrastructure (ditches, pipes, culverts)
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Evaluate operational status
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Provide photo documentation
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Collect data for hydrologic/hydraulic analysis
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Review survey data
- Quantity: - Unit: - Work Item: Task 2: Data Collection - Prepare comprehensive base map reflecting ROW, sidewalks, curb and gutter, street lighting, power poles, physical obstructions (fire hydrants, catch basins, drainage ditches), identify survey monuments/property corners
- Quantity: - Unit: - Work Item: Report Summarizing Survey Findings (MS Word & PDF)
- Quantity: - Unit: - Work Item: Topographic Base Map (PDF)
- Quantity: - Unit: - Work Item: Task 5: Hydrologic & Hydraulic Analysis of Alternatives - Evaluate three alternatives for 2-year and 5-year storm events
- Quantity: - Unit: - Work Item: Task 5: Hydrologic & Hydraulic Analysis of Alternatives - Ensure mitigation of adverse impacts without increasing water surface elevations
- Quantity: - Unit: - Work Item: Task 5: Hydrologic & Hydraulic Analysis of Alternatives - Configure HEC-HMS modeling for local impacts
- Quantity: - Unit: - Work Item: Task 5: Hydrologic & Hydraulic Analysis of Alternatives - Develop floodplain map
- Quantity: - Unit: - Work Item: Task 5: Hydrologic & Hydraulic Analysis of Alternatives - Perform floodplain evaluation for existing conditions
- Quantity: - Unit: - Work Item: Alternatives Study Report (MS Word & PDF)
- Quantity: - Unit: - Work Item: Design Matrix (MS Excel & PDF)
- Quantity: - Unit: - Work Item: Minutes from public outreach meetings (MS Word & PDF)
- Quantity: - Unit: - Work Item: Presentation materials from outreach meetings (PDF)
- Quantity: - Unit: - Work Item: Task 6: Geotechnical Investigation - Analyze soil composition/stability, groundwater levels, subsurface obstructions/geohazards for sidewalk construction
- Quantity: - Unit: - Work Item: Task 6: Geotechnical Investigation - Provide recommendations for soil stabilization/remediation
- Quantity: - Unit: - Work Item: Task 6: Geotechnical Investigation - Summarize findings (locations, depths, methods, sample types, lab testing plan)
- Quantity: - Unit: - Work Item: Task 6: Geotechnical Investigation - Locate utilities, coordinate with Underground Services Alert (USA), Esparto Community Service District, and utility companies
- Quantity: - Unit: - Work Item: Draft Design Geotechnical Investigation Report (PDF)
- Quantity: - Unit: - Work Item: Final Design Geotechnical Investigation Report (PDF)
- Quantity: - Unit: - Work Item: Task 7: Environmental Scan (Optional) - Complete an environmental scan to determine project feasibility and potential impacts based on Natural Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) requirements
- Quantity: - Unit: - Work Item: Task 8: Environmental Documents and Studies - Complete environmental review
- Quantity: - Unit: - Work Item: Task 8: Environmental Documents and Studies - Prepare required technical studies for NEPA and CEQA compliance
- Quantity: - Unit: - Work Item: Task 8: Environmental Documents and Studies - Provide professional environmental services for environmental clearance
- Quantity: - Unit: - Work Item: Task 8: Environmental Documents and Studies - Ensure project design and construction documents comply
- Quantity: - Unit: - Work Item: Plans and estimate 65% complete (11"x17" PDF)
- Quantity: - Unit: - Work Item: Plans and estimate 95% complete (11"x17" PDF)
- Quantity: - Unit: - Work Item: Draft Special Provisions (MS Word)
- Quantity: - Unit: - Work Item: Response to County comments (MS Word)
- Quantity: - Unit: - Work Item: Draft PS&E package (MS Word)
- Quantity: - Unit: - Work Item: Task 10: Management and Preparation of Right of Way (ROW) and Utilities Relocation - Provide legal descriptions and plats prepared by a California licensed Surveyor for right-of-way acquisition
- Quantity: - Unit: - Work Item: Task 10: Management and Preparation of Right of Way (ROW) and Utilities Relocation - Determine necessary utilities and their precise locations affected by the project
- Quantity: - Unit: - Work Item: Task 10: Management and Preparation of Right of Way (ROW) and Utilities Relocation - Coordinate with County and utility owners for design and preparation of relocation plans
- Quantity: - Unit: - Work Item: Legal and Plat for Easements (MS Word & PDF)
- Quantity: - Unit: - Work Item: Relocation Plans (PDF)
- Quantity: - Unit: - Work Item: Task 11: Final PS&E with PS&E Checklist and Final Design Exceptions - Incorporate corrections/changes to PS&E
- Quantity: - Unit: - Work Item: Task 11: Final PS&E with PS&E Checklist and Final Design Exceptions - Submit final PS&E package with signed/stamped plan sheets by California registered engineer/geologist (if needed)
- Quantity: - Unit: - Work Item: Task 11: Final PS&E with PS&E Checklist and Final Design Exceptions - Provide stamped/signed specifications, structural calculations, and quantity calculations
- Quantity: - Unit: - Work Item: Final Design Plans (Electronic Formal File)
- Quantity: - Unit: - Work Item: Final Design Plans (1 set 24"x36")
- Quantity: - Unit: - Work Item: Final Design Plans (1 set 11"x17")
- Quantity: - Unit: - Work Item: Final Special Provisions (2 copies)
- Quantity: - Unit: - Work Item: Quantity Calculations and Engineer's Estimate (2 copies)
- Quantity: - Unit: - Work Item: Check Quantity Calculations (1 copy)
- Quantity: - Unit: - Work Item: Design Calculations (2 copies)
- Quantity: - Unit: - Work Item: Check Design Calculations (1 copy)
- Quantity: - Unit: - Work Item: Design Exceptions Fact Sheet (electronic submittal LAPM Ex 11-F)
- Quantity: - Unit: - Work Item: Final PS&E Checklist (electronic submittal LAPM Ex 12-D)
- Quantity: - Unit: - Work Item: Task 12: Bidding & Construction Support - Provide engineering support services during bidding and construction, including preparing addenda, furnishing additional drawings for corrections/change orders, on-site review, shop drawing/falsework plan reviews, contract change order reviews, and assistance with contractor claims/testimony
NAICS Classification
Engineering Services (Civil engineering design, hydrological and hydraulic analysis, geotechnical investigation, environmental engineering, right-of-way engineering, construction support), Surveying and Mapping Services (Field surveys, topographic base mapping, property boundary identification for ROW acquisition), Environmental Consulting Services (Environmental scans, NEPA/CEQA document preparation), All Other Professional, Scientific, and Technical Services (Project management, coordination with stakeholders, public outreach, contract administration)
Records and Due Date
This bid opportunity was entered into BidAmerica on November 18, 2025, and was last updated on November 17, 2025. All bids and/or proposals are due on December 19, 2025.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Yolo County.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Yolo County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Yolo County prior to bidding.