Unofficial Notice of Invitation to Bid (NIB)

Marin County is seeking bids from qualified and interested contractors for the following project titled, PT SAN PEDRO RETAINING WALL #4 REPLACEMENT PROJECT, identified under Solicitation ID: 2020-11. Work is to be performed near 3501 Civic Center Dr, San Rafael, CA 94903, USA in Marin County.

General Project Description

This project involves the replacement of an approximately 140-foot-long section of an existing retaining wall along Pt. San Pedro Road, including adjacent sidewalk and pavements. The scope includes mobilization, traffic control, stormwater pollution prevention, clearing and grubbing, roadway excavation, concrete removal and placement (curb & gutter, sidewalk, valley gutter, sidewalk underdrain), hot mix asphalt paving, utility cover adjustments, satellite dish demolition, red curb painting, and the design-build and installation of a soil nail retaining wall system. The soil nail wall design will encompass geotechnical requirements, reinforced shotcrete facing, and drainage provisions.

General Bid Items

  • Quantity: 1  Unit: LS  Work Item: Mobilization
  • Quantity: 1  Unit: LS  Work Item: Traffic Control and Construction Area Signs
  • Quantity: 1  Unit: LS  Work Item: Storm Water Pollution Control Program
  • Quantity: 1  Unit: LS  Work Item: Clearing and Grubbing
  • Quantity: 16  Unit: CY  Work Item: Roadway Excavation (F)
  • Quantity: 705  Unit: SF  Work Item: Remove Concrete (Curb & Gutter, Sidewalk) (F)
  • Quantity: 2  Unit: TON  Work Item: Hot Mix Asphalt (Type A)
  • Quantity: 141  Unit: LF  Work Item: Minor Concrete (Type "A" Curb & Gutter)
  • Quantity: 17  Unit: EA  Work Item: Minor Concrete (Sidewalk Underdrain)
  • Quantity: 125  Unit: LF  Work Item: Minor Concrete (Valley Gutter)
  • Quantity: 635  Unit: SF  Work Item: Minor Concrete (Type "A" Sidewalk)
  • Quantity: 1  Unit: EA  Work Item: Adjust Utility Cover To Grade (Revocable)
  • Quantity: 1  Unit: EA  Work Item: Demolish Satellite Dish (F)
  • Quantity: 141  Unit: LF  Work Item: Red Curb (Paint, 2 Coat)
  • Quantity: 2033  Unit: SF  Work Item: Soil Nail Wall Design -Build

NAICS Classification

Highway, Street, and Bridge Construction (Replacing retaining wall, roadway excavation, hot mix asphalt, curb & gutter, sidewalk construction)., Site Preparation Contractors (Demolition, clearing, grubbing, stormwater pollution control)., Poured Concrete Foundation and Structure Contractors (Concrete work for retaining wall facing, curbs, gutters, sidewalks)., Power and Communication Line and Related Structures Construction (Utility work, adjusting utility covers)., Painting and Wall Covering Contractors (Curb painting).

Records and Due Date

This bid opportunity was entered into BidAmerica on December 4, 2025, and was last updated on December 16, 2025. All bids and/or proposals are due on December 17, 2025.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Marin County.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Marin County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Marin County prior to bidding.