Loading...

Unofficial Notice of Invitation to Bid (NIB)

Foothill Transit is seeking bids from qualified and interested contractors for the following project titled, Cabling Upgrades at Operation & Maintenance Facilities, identified under Solicitation ID: 26-048. Work is to be performed near 100 S Vincent Ave, West Covina, CA 91790, USA in Los Angeles County.

General Project Description

Foothill Transit is soliciting bids from qualified firms for the provision and installation of new cabling infrastructure. This public works project involves upgrading cabling systems, including CAT6 copper and multimode fiber, at its Arcadia Irwindale and Pomona Operation and Maintenance Facilities. The scope includes providing and installing low voltage cabling, Category 6 cabling, fiber backbones, associated cable conveyance (J-Hooks, conduit), patch panels, and equipment racks. The contractor is responsible for field verification, cable certification, labeling per EIA/TIA standards, and coordination with Foothill Transit IT. Materials specified include General Cable for CAT6 copper and Panduit net key connectivity.

General Bid Items

  • Quantity: 36,000  Unit: LF  Work Item: Provide and install Low Voltage (CAT6 copper) cabling within Arcadia Irwindale Facility. Specifications: route through accessible ceilings via J-Hooks utilizing new conduit, terminate on new 48-port patch panels, use General Cable CAT6 and Panduit net key connectivity, certified and labeled per EIA/TIA standards.
  • Quantity: 63,000  Unit: LF  Work Item: Provide and install Low Voltage (CAT6 copper) cabling within Pomona Facility. Specifications: route through accessible ceilings via J-Hooks, terminate on new 48-port patch panels, use General Cable CAT6 and Panduit net key connectivity, certified and labeled per EIA/TIA standards.
  • Quantity: As required  Unit: LS  Work Item: Provide and install fiber backbones. Specifications: 24 Strand Multi Mode Fiber (LC/LC) from Admin Tele Room A115 to Second Level IDF (201) in Arcadia Irwindale, from Maintenance Building MPOE to Administration Building, Wash Building, Fuel Building, and Warehouse (Arcadia Irwindale and Pomona), fiber certification and labeling per EIA/TIA standards.
  • Quantity: As required  Unit: LS  Work Item: Provide and install cable conveyance requirements (J-Hooks, sleeves, etc.) to support new cabling infrastructure.
  • Quantity: As required  Unit: LS  Work Item: Install new 48-port patch panels on existing racks, field coordinate exact mounting height.
  • Quantity: As required  Unit: LS  Work Item: Protect existing IDF equipment in place.
  • Quantity: As required  Unit: LS  Work Item: Conduct comprehensive field verification of all pathway locations prior to construction.
  • Quantity: As required  Unit: LS  Work Item: Conduct on-site assessment of existing facility to understand current layout, building infrastructure, and use of technology.

NAICS Classification

NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors (Includes installation of computer and network cabling, telecommunications systems, and fiber optic cabling)

Records and Due Date

This bid opportunity was entered into BidAmerica on February 13, 2026, and was last updated on February 13, 2026. All bids and/or proposals are due on March 17, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Foothill Transit.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Foothill Transit. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Foothill Transit prior to bidding.

Cabling Upgrades at Operation & Maintenance Facilities - Bid Opportunity | BidAmerica