SWEETWATER UNION HIGH SCHOOL DISTRICT is seeking bids from qualified and interested contractors for the following project titled, San Ysidro High School Exterior Painting Project, identified under Solicitation ID: BID #26-2992-AM. Work is to be performed near 642 Arizona St, Chula Vista, CA 91911, USA in San Diego County.
General Project Description
This project involves the exterior painting of the San Ysidro High School. The work encompasses furnishing all labor, materials, equipment, transportation, and supervision for surface preparation (pressure washing, prep, priming) and applying finish coats to all exterior surfaces. This includes various materials such as corrugated metal roofing, stucco, concrete surfaces (retaining walls, trash receptacles, benches, tabletops/seats, planters, exterior walls of specific buildings 300-700, and handball courts), breezeways, overhangs, corrugated metal ceilings, previously painted vents, screens, louvers, valve protection cages, wood/metal trim (beams, rafter tails, handrails/screens, drip edges, interior/exterior doors, casings, fascia, window trim), pipes, electrical conduits, gutter pipes, boxes, poles, posts, stanchions, bollards, solar vertical poles, slant T supports (including rusted conduit raceway), light standards, wall-mounted light fixtures, basketball poles/backstops, and perimeter iron fencing and gates. The painting requires one coat of exterior primer and a minimum of two complete coats of exterior grade finish, with additional coats as necessary for uniform coverage. Specific tasks also include reapplying gas shut-off stenciling, painting fire hydrants and bollards safety yellow, re-applying painted lettering/numbers, applying non-skid coatings to ramps of portable buildings, and matching existing campus colors.
General Bid Items
- Quantity: - Unit: LS Work Item: Pressure wash, prep, prime, and paint all exterior surfaces, removing all flaking/peeling paint campus wide on all surfaces including all corrugated metal roof areas.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all color coated stucco and painted/unpainted concrete surfaces, including retaining walls, trash receptacles, benches, tabletops/seats, planters, center roof exterior walls of bldgs. 300, 400, 500, 600, 700 and handball courts.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all breezeways, overhangs, under hangs and corrugated metal ceilings.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all previously painted vents, screens, louvers and valve protection cages.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all wood and/or metal trim, including I beams, rafter tails, handrails/screens, drip edges, interior and exterior doors, interior and exterior casings, fascia and window trim.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all pipes, electrical conduits, gutter pipes and boxes with the surfaces.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all previously painted poles, posts, stanchions and/or bollards.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all solar vertical poles and slant T supports, including rusted conduit raceway.
- Quantity: - Unit: LS Work Item: Prep, prime and paint all light standards post, painted wall mounted and other light fixtures and basketball poles/backstops.
- Quantity: - Unit: LS Work Item: Prep, prime, and paint perimeter iron fencing and gates.
- Quantity: - Unit: LS Work Item: Reapply gas shut-off stenciling and paint fire risers (all existing gas shut-off stenciling, all fire risers).
- Quantity: - Unit: LS Work Item: Paint District owned fire hydrants and bollards safety yellow.
- Quantity: - Unit: LS Work Item: Re-apply painted lettering, numbers, etc. on doors and/or buildings (close stencils, no gaps).
- Quantity: 1 Unit: COAT Work Item: Apply exterior primer.
- Quantity: Minimum 2 Unit: COATS Work Item: Apply exterior grade finish (additional coats may be required for uniform and proper coverage).
- Quantity: - Unit: LS Work Item: Prep, prime and paint previously painted roof jacks, flashings (gravel stops) and vents.
- Quantity: - Unit: LS Work Item: Prep, prime and paint unpainted and painted rain gutters and downspouts.
- Quantity: - Unit: LS Work Item: Apply non-skid coating to ramps of portable buildings or any previously applied non-skid coating on ramps of portable buildings.
- Quantity: - Unit: LS Work Item: Prep, prime, and paint shade structure poles and supports campus wide.
- Quantity: - Unit: LS Work Item: Prep, prime, and paint quad stage areas, floors and/or foundations.
- Quantity: - Unit: LS Work Item: Prep, prime and paint metal beams of 800 building (all 3 floors).
NAICS Classification
NAICS 238320 – Painting and Wall Covering Contractors (For comprehensive painting services, including surface preparation, priming, and applying finish coatings to various building exteriors and structures.), NAICS 238390 – Other Building Finishing Contractors (For specialized finishing work such as applying non-skid coatings, stenciling, and painting specific fixtures and equipment.)
Records and Due Date
This bid opportunity was entered into BidAmerica on February 25, 2026, and was last updated on February 25, 2026. All bids and/or proposals are due on March 25, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by SWEETWATER UNION HIGH SCHOOL DISTRICT.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by SWEETWATER UNION HIGH SCHOOL DISTRICT. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from SWEETWATER UNION HIGH SCHOOL DISTRICT prior to bidding.