Loading...

Unofficial Notice of Invitation to Bid (NIB)

Redlands Unified School District is seeking bids from qualified and interested contractors for the following project titled, ASPHALT/CONCRETE/STRIPING AT VARIOUS SITES, identified under Solicitation ID: Bid # 6-26. Work is to be performed near 20 W Lugonia Ave, Redlands, CA 92374, USA in San Bernardino County.

General Project Description

This project involves asphalt, concrete, and striping work at various sites within the Redlands Unified School District. The work includes the removal and replacement of asphalt on outdoor volleyball courts, installation of 3-inch thick asphalt paving with 3/8 FINE MIX, construction of standard size asphalt curbs using BERM MIX, and application of a seal coat followed by two coats of white striping paint to outline volleyball courts. Additionally, the project includes the removal and replacement of concrete walks, driveway approaches (requiring city permit at Victoria Elementary school), tree rings, and water lines at designated school sites. It also covers grubbing/rough grading of grass/dirt areas, asphalt skin patching, overlay with Petromat fabric, installation of AC speed bumps, AC berms, concrete berms, redwood headers, slurry coats, grind and overlays, concrete curb and gutter installation, raising yard boxes, saw cutting asphalt or concrete, demo and haul away of concrete and dirt, asphalt ramp extensions, crack repair, concrete flow line installation, grinding asphalt at concrete edges, installation of concrete drain boxes with traffic grates, and Schedule 40 PVC drain pipe. The project also encompasses various striping for parking stalls (single and double line), lane delineators, numbers/letters, solid lines (4", 8", 12"), speed bumps, wheel stops, and court markings for basketball (full/half), volleyball, foursquare, tetherball, hopscotch, double circles, tricycle tracks, and ball walls. Curb painting (red/yellow/green) and installation of galvanized pipe mounted signs ("No Left Turn", "Van Accessible") are also specified.

General Bid Items

  • Quantity: -  Unit: SF  Work Item: Asphalt Removal and Replacement, Depth: 3"
  • Quantity: -  Unit: SF  Work Item: Asphalt Removal and Replacement, Depth: 4"
  • Quantity: -  Unit: SF  Work Item: Asphalt Removal and Replacement, Depth: 6"
  • Quantity: -  Unit: SF  Work Item: Additional AC Paving Base, Thickness: 4" thick
  • Quantity: -  Unit: SF  Work Item: Additional Aggregate Base, Thickness: 4"
  • Quantity: -  Unit: SF  Work Item: AC Skin Patch, Location: Various locations as needed
  • Quantity: -  Unit: SF  Work Item: Overlay with Petromat Fabric (One location), Thickness: 1"-1.5"
  • Quantity: -  Unit: SF  Work Item: Additional thickness added to each unit (no removal), Thickness: 1"
  • Quantity: -  Unit: LF  Work Item: AC Speed Bumps, Size: 14" wide, 3" high
  • Quantity: -  Unit: LF  Work Item: AC Berm, Size: 6" high
  • Quantity: -  Unit: LF  Work Item: Concrete Berm, Size: 6" high
  • Quantity: -  Unit: LS  Work Item: Grub/Rough Grade Grass/Dirt Area (Includes removal and disposal of spoils)
  • Quantity: -  Unit: LF  Work Item: Redwood Headers, Size: 2" x 4"
  • Quantity: -  Unit: LF  Work Item: Redwood Headers, Size: 2" x 6"
  • Quantity: -  Unit: SF  Work Item: Slurry Coat
  • Quantity: -  Unit: SF  Work Item: Grind and Overlay with AC Paving, Average Thickness: 1" to 3"
  • Quantity: -  Unit: LF  Work Item: Installation of Concrete Curb & gutter, Size: 6" x 18"
  • Quantity: -  Unit: EACH  Work Item: Raise Yard Boxes
  • Quantity: -  Unit: LF  Work Item: Saw Cut Asphalt or Concrete
  • Quantity: -  Unit: YD  Work Item: Demo and Haul Away Concrete
  • Quantity: -  Unit: YD  Work Item: Haul Away Dirt
  • Quantity: -  Unit: LF  Work Item: Installation Concrete Curb, Size: 6 x 12
  • Quantity: -  Unit: EACH  Work Item: Asphalt Ramp Extension, Size: Typically 4' x 5", 0-3" thick
  • Quantity: -  Unit: LF  Work Item: Crack Repair, V. Grind and Fill
  • Quantity: -  Unit: LF  Work Item: Installation of Concrete Flow Line in Asphalt (saw cut and demo existing), Size: 3' x 6"
  • Quantity: -  Unit: LF  Work Item: Grind Asphalt at Concrete Edges to Match Elevations
  • Quantity: -  Unit: EACH  Work Item: Installation of Concrete Drain Box with Traffic Grate in Asphalt or Concrete, Size: 24" x 24" x 12"
  • Quantity: -  Unit: LF  Work Item: Installation of Schedule 40 PVC Drain Pipe, Size: 3”
  • Quantity: -  Unit: SF  Work Item: Demo existing Concrete, Depth: 4”
  • Quantity: -  Unit: SF  Work Item: Installation of Concrete with Rebar, Depth: 4”
  • Quantity: -  Unit: SF  Work Item: Installation of Concrete with Rebar, Depth: 6”
  • Quantity: -  Unit: HR  Work Item: Hourly Rate for Operated Equipment: Backhoe, Dump Truck, Roller, Skip Loader, Bob Cat, Water Truck
  • Quantity: -  Unit: HR  Work Item: Hourly Rate for Labor: Journeyman, Apprentice
  • Quantity: -  Unit: EACH  Work Item: Stop restraining bar, 4' (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Stop restraining bar, 4' (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Stop restraining bar, 8' (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Stop restraining bar, 8' (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: “STOP” 4' with restraining bar (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: “STOP” 4' with re straining bar (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: “STOP” 8' with restraining bar (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: “STOP” 8' with restraining bar (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Turn Arrows (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Turn Arrows (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Blue Handicap Stalls (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Blue Handicap Stalls (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Cross Walks (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Cross Walks (each), Action: New Layout
  • Quantity: -  Unit: LF  Work Item: Curb Painting Red/Yellow/Green, Action: Restripe
  • Quantity: -  Unit: LF  Work Item: Curb Painting Red/Yellow/Green, Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Double Line Parking Stalls (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: Lane Delineators, Epoxied (EA), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Lane Delineators, Epoxied (EA), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: With round ends add (Restripe)
  • Quantity: -  Unit: EACH  Work Item: With round ends add (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Single or Parallel Line Parking Stalls, white (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: Single or Parallel Line Parking Stalls, white (each), Action: New Layout
  • Quantity: -  Unit: EACH  Work Item: 8"-12" Number or Letters (each), Action: Restripe
  • Quantity: -  Unit: EACH  Work Item: 8"-12" Number or Letters (each), Action: New Layout
  • Quantity: -  Unit: LF  Work Item: 4" Solid Lines, any color (LF), Action: Restripe
  • Quantity: -  Unit: LF  Work Item: 4" Solid Lines, any color (LF), Action: New Layout
  • Quantity: -  Unit: LF  Work Item: 8" Solid Lines, any color (LF), Action: Restripe
  • Quantity: -  Unit: LF  Work Item: 8" Solid Lines, any color (LF), Action: New Layout
  • Quantity: -  Unit: LF  Work Item: 12" Solid Lines, any color (LF), Action: Restripe
  • Quantity: -  Unit: LF  Work Item: 12" Solid Lines, any color (LF), Action: New Layout
  • Quantity: -  Unit: LF  Work Item: Speed Bumps, up to 3' wide (LF)
  • Quantity: -  Unit: EACH  Work Item: 4' Wheel Stops, Rebar Pinned (EA)
  • Quantity: -  Unit: EACH  Work Item: 6' Wheel Stops, Rebar Pinned (EA)
  • Quantity: -  Unit: EACH  Work Item: Basketball Court, FULL (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Basketball Court, FULL (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Basketball Court, HALF (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Basketball Court, HALF (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Volleyball Court (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Volleyball Court (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Foursquare game (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Foursquare game (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Tetherball Court (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Tetherball Court (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Hopscotch (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Hopscotch (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Double Circles (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Double Circles (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Tricycle Track (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Tricycle Track (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Ball Walls (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Ball Walls (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Triple plastic basket game w/double circles & shapes (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Triple plastic basket game w/double circles & shapes (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Alphabet Circle (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: Alphabet Circle (New Layout)
  • Quantity: -  Unit: EACH  Work Item: "No Parking”, 3” (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: "No Parking", 3" (New Layout)
  • Quantity: -  Unit: EACH  Work Item: "Fire Lane", 3", with Vehicle Code (Re-stripe)
  • Quantity: -  Unit: EACH  Work Item: "Fire Lane", 3", with Vehicle Code (New Layout)
  • Quantity: -  Unit: EACH  Work Item: Galvanized Pipe Mounted “No Left Turn” Sign, Specifications: Minimum Size, Typical, 1 7/8" O.D. Schedule 40 (installed in planters and cored in asphalt or concrete)
  • Quantity: -  Unit: EACH  Work Item: Galvanized Pipe Mounted "Van Accessible" Sign, Specifications: Minimum Size, Typical 1 7/8" O.D. Schedule 40 (installed in planters and cored in asphalt or concrete)
  • Quantity: -  Unit: %  Work Item: Percentage of mark up above your cost for materials not covered in your unit price bid otherwise also known as "Unforeseen" items

NAICS Classification

NAICS 237310 – Highway, Street, and Bridge Construction (Includes asphalt paving, concrete paving for roads, streets, parking lots, sidewalks, curbs, drainage improvements, and striping related to public works infrastructure)., NAICS 238110 – Poured Concrete Foundation and Structure Contractors (For specific concrete flatwork such as sidewalks, driveway approaches, and concrete berms not directly part of major road construction)., NAICS 237110 – Water and Sewer Line and Related Structures Construction (For removal and replacement of water lines)., NAICS 238910 – Site Preparation Contractors (For site clearing, grubbing, rough grading, demolition of existing asphalt and concrete, and tree stump/root removal).

Records and Due Date

This bid opportunity was entered into BidAmerica on December 2, 2025, and was last updated on January 9, 2026. All bids and/or proposals are due on January 13, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Redlands Unified School District.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Redlands Unified School District. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Redlands Unified School District prior to bidding.

ASPHALT/CONCRETE/STRIPING AT VARIOUS SITES - Bid Opportunity | BidAmerica