Loading...

Unofficial Notice of Invitation to Bid (NIB)

Riverside County is seeking bids from qualified and interested contractors for the following project titled, Flood Control Telecom Room Build-Out, identified under Solicitation ID: ITARC-605. Work is to be performed near 1995 Market St, Riverside, CA 92501, USA in Riverside County.

General Project Description

This project involves the build-out of two (2) Telecommunication Rooms including the provision, installation, termination, testing, and documentation of Fiber Optic Cable. The contractor is responsible for furnishing all labor, materials, parts, equipment, tools, supervision, services, transportation, waste disposal, facilities, and other required items in strict accordance with attached bid documents, RCIT specifications, and industry standards. The scope includes installation of racks, cable management, a telecom room grounding system, copper and fiber backbone cabling, terminations, patch panels, UPS units, and PDUs. The work must comply with applicable codes and requires coordination with other trades concurrently working in the facility.

General Bid Items

  • Quantity: 2  Unit: EA  Work Item: Build-out of Telecommunication Rooms (TR1A & TR1B)
  • Quantity: 3  Unit: EA  Work Item: CPI 2-post 19” standard racks
  • Quantity: 4  Unit: EA  Work Item: CPI Combination 6” Vertical Wire Managers
  • Quantity: 6  Unit: EA  Work Item: CPI 2RU Horizontal Wire Manager(s)
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of Ladder Rack and Mounting equipment (including CPI 18” Alternate Spacing Cable Runway, CPI 18” Universal Cable Runway, CPI 18” Mounting Plate, CPI Cable Runway Elevation Kit, CPI 18" Radius drop, CPI 18" Wall Angle Support Kit, CPI 18” Triangular Support Brackets, CPI Junction Splice Kit, CPI Heavy Duty Butt-Splice Kit, CPI Vertical Wall Bracket, CPI Threaded Ceiling kit, CPI End Caps)
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of Chatsworth 20” Telecommunication Main Ground Bus Bar (TMGB)
  • Quantity: 3  Unit: EA  Work Item: Provision & installation of Chatsworth Horizontal Rack Ground Bar (RGB)
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of Telecommunications Equipment Bounding Conductor (TEBC) from TMGB down each Row (1, 2 & 3), Specifications: using #2 AWG stranded copper ground cable.
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of #6 AWG stranded copper ground cable from RGB in each Rack/Cabinet to #2 AWG bonding conductor.
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of #6 AWG stranded copper ground cable from TMGB to the cable runway.
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of #6 AWG ground straps at each cable runway junction.
  • Quantity: 1  Unit: EA  Work Item: Provide and install Essex 50-pair riser rated cable, Location: Existing TR1A to New TR1A, Approximate distance: 125 ft.
  • Quantity: 1  Unit: EA  Work Item: Provide and install Essex 50-pair riser rated cable, Location: New TR1A to New TR1B, Approximate distance: 350 ft.
  • Quantity: 6  Unit: EA  Work Item: Provide and install Cat6 cables (Special Services), Location: Existing TR1A to New TR1A.
  • Quantity: 6  Unit: EA  Work Item: Provide and install Cat6 cables (Special Services), Location: New TR1A to New TR1B.
  • Quantity: As required  Unit: LS  Work Item: Install Leviton eXtreme jacks (Yellow) for Cat6 cables.
  • Quantity: 1  Unit: EA  Work Item: Provide and install 12-port VertiGo Zero-U patch panel, Location: existing TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provide and install 24-port QuickPort patch panel, Location: New TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provide and install 24-port QuickPort patch panel, Location: TR1B.
  • Quantity: 2  Unit: EA  Work Item: Provision & installation of 300 pair 110 termination block assemblies, Distribution: One in New TR1A and one in new TR1B.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 24-strand Multimode (62.5) fiber cable, Location: existing TR1A to New TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 24-strand Multimode (OM3/4) fiber cable, Location: existing TR1A to New TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 24-strand Singlemode fiber cable, Location: existing TR1A to New TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 24-strand Singlemode fiber cable, Location: New TR1A to New TR1B.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 12-strand Multimode (OM3/4) fiber cable, Location: New TR1A to New TR1B.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 1RU Leviton rack mounted fiber housing, Location: E TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 2RU Leviton rack mounted fiber housing, Location: New TR1A.
  • Quantity: 1  Unit: EA  Work Item: Provision & installation of 1RU Leviton rack mounted fiber housing, Location: New TR1B.
  • Quantity: As required  Unit: LS  Work Item: Provision & installation of Quad LC connector panels, Specifications: with Fast Cam Connectors.
  • Quantity: 5  Unit: EA  Work Item: Provide LC-LC Duplex SM Fiber patch cords, Size: 1m.
  • Quantity: 5  Unit: EA  Work Item: Provide LC-LC Duplex SM Fiber patch cords, Size: 3m.
  • Quantity: 5  Unit: EA  Work Item: Provide LC-LC Duplex MM Fiber patch cords, Size: 1m.
  • Quantity: 5  Unit: EA  Work Item: Provide LC-LC Duplex MM Fiber patch cords, Size: 3m.
  • Quantity: 2  Unit: EA  Work Item: Provision & installation of UPS(s).
  • Quantity: 4  Unit: EA  Work Item: Provision & installation of PDU(s).

NAICS Classification

NAICS 238210 – Electrical Contractors and Other Wiring Installation Contractors (Includes structured cabling installation, telecommunications equipment installation, grounding systems, and power distribution units/uninterruptible power supplies.), NAICS 541512 – Computer Systems Design Services (Includes telecommunications room design, system integration, testing, and documentation services related to the network infrastructure deployment.)

Records and Due Date

This bid opportunity was entered into BidAmerica on February 26, 2026, and was last updated on February 26, 2026. All bids and/or proposals are due on March 17, 2026.

Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Riverside County.

Legal Disclaimer

All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Riverside County. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Riverside County prior to bidding.

Flood Control Telecom Room Build-Out - Bid Opportunity | BidAmerica