Unofficial Notice of Invitation to Bid (NIB)
San Diego City is seeking bids from qualified and interested contractors for the following project titled, Slurry Seal Group 2625, identified under Solicitation ID: K-26-2429-DBB-3. Work is to be performed near 202 C St, San Diego, CA 92101, USA in San Diego County.
General Project Description
This project involves providing construction services for Slurry Seal Group 2625, focusing on pavement maintenance throughout various areas of the City of San Diego. The scope includes furnishing all labor, materials, equipment, and services related to slurry seal, scrub seal, and cape seal work on existing paved roadways. Key tasks include the placement of Rubber Polymer Modified Slurry Seal (RPMS) and Polymer Modified Rejuvenating Emulsion (PMRE) Scrub Seal and/or Cape Seal on approximately 35.8 lane miles. Additional work encompasses crack sealing, asphalt mill and pave, pavement base repairs (digouts), milling and disposal of pavement fabric, quality assurance/quality control (QA/QC) for asphalt and surface seal work, replacement of traffic signal detection loops and stub outs, adjustment of existing City manhole frames/covers and other appurtenances (water, sewer, survey monuments) to grade, reconstruction of survey monument boxes, street and sidewalk sweeping, removal and replacement of existing thermoplastic striping and markings, implementation of new striping plans, traffic control (including drawings and permits), weed abatement, storm drain inlet protection, installation of inlet markings, and sediment control. Work may include night and weekend shifts, and Best Management Practices (BMPs) for erosion control are required.
General Bid Items
- Quantity: - Unit: LS Work Item: Remove, Replace & Install Traffic Striping, Markers, Markings & Devices
- Quantity: - Unit: LS Work Item: Traffic Control and Working Drawings
- Quantity: - Unit: SF Work Item: Rubber Polymer Modified Slurry (RPMS) Type I
- Quantity: - Unit: SF Work Item: Rubber Polymer Modified Slurry (RPMS) Type II
- Quantity: - Unit: SF Work Item: Rubber Polymer Modified Slurry (RPMS) Type III
- Quantity: - Unit: TON Work Item: Asphalt Pavement Repair
- Quantity: - Unit: LBS Work Item: Crack Seal
- Quantity: - Unit: TON Work Item: Crushed Miscellaneous Base
- Quantity: - Unit: TON Work Item: Asphalt Concrete with Pavement Fabric Material
- Quantity: - Unit: EA Work Item: Raise Appurtenance to Grade (Water, Sewer)
- Quantity: - Unit: EA Work Item: Adjust Existing Manhole Frame and Cover to Grade
- Quantity: - Unit: EA Work Item: Adjust Existing Survey Monument to Grade
- Quantity: - Unit: EA Work Item: Reconstruct Survey Monument Box
- Quantity: - Unit: EA Work Item: Traffic Detector Loop Replacement or Conduit Stub Installed
- Quantity: - Unit: SF Work Item: Micro Mill AC Pavement (<1-Inch)
- Quantity: - Unit: LF Work Item: Edge Grind AC Pavement (<2-Inch)
- Quantity: - Unit: LF Work Item: Red Curb (painted)
- Quantity: - Unit: EA Work Item: Post-construction Requirements – Inlet Markings
NAICS Classification
237310 – Highway, Street, and Bridge Construction, 238990 – All Other Specialty Trade Contractors, 541330 – Engineering Services, 561730 – Landscaping Services
Records and Due Date
This bid opportunity was entered into BidAmerica on December 25, 2025, and was last updated on December 24, 2025. All bids and/or proposals are due on January 27, 2026.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by San Diego City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by San Diego City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from San Diego City prior to bidding.