Santa Ana City is seeking bids from qualified and interested contractors for the following project titled, 10th & Flower Park Stormwater Capture and Park Improvements (Project No. 26-6642 and Project No. 26-6601), identified under Solicitation ID: (Project No. 26-6642 and Project No. 26-6601). Work is to be performed near 20 Civic Center Plaza, Santa Ana, CA 92701, USA in Orange County.
General Project Description
This project involves excavation, grading, removal and replacement of asphalt concrete and Portland cement concrete, fencing, utility connections and related buildouts, site lighting, site drainage, irrigation, and landscaping for the 10th & Flower Park. It also includes stormwater capture infrastructure and various park improvements such as playgrounds, fitness equipment, basketball courts, and site furniture. The project is subject to the Build America, Buy America Act (BABAA) requirements for materials and compliance with California Air Resources Board (CARB) regulations for equipment.
General Bid Items
- Quantity: 1 Unit: LS Work Item: Mobilization (no more than 5% of total bid)
- Quantity: 1 Unit: LS Work Item: Clear and Grub
- Quantity: 1 Unit: LS Work Item: Construction Signage
- Quantity: 5300 Unit: CY Work Item: Unclassified Excavation
- Quantity: 650 Unit: LF Work Item: Remove and Dispose of Existing Chain Link Fence
- Quantity: 3 Unit: EA Work Item: Remove and Dispose of Existing Trees and Tree Roots
- Quantity: 2 Unit: EA Work Item: Remove and Dispose of Existing Water Service to existing Corp Stop & Cap at Main
- Quantity: 1 Unit: EA Work Item: Remove and Dispose of Backflow Preventer and Lateral & Cap at Main
- Quantity: 1875 Unit: SF Work Item: Remove and Dispose of Existing PCC Sidewalk
- Quantity: 2 Unit: EA Work Item: Remove and Dispose of Existing Power Pole
- Quantity: 2 Unit: EA Work Item: Remove and Dispose of Existing Parkway Drain
- Quantity: 245 Unit: LF Work Item: Remove and Dispose of Existing Gravel Swale
- Quantity: 20 Unit: LF Work Item: Sawcut, Remove and Dispose of Two-foot wide AC Pavement
- Quantity: 4675 Unit: SF Work Item: 4” thick PCC Sidewalk
- Quantity: 7953 Unit: SF Work Item: 8” thick PCC Pavement
- Quantity: 4230 Unit: SF Work Item: 5” thick PCC Basketball Court
- Quantity: 411 Unit: LF Work Item: 6” Wide PCC Mow Curb
- Quantity: 2 Unit: EA Work Item: Tree Well
- Quantity: 2 Unit: EA Work Item: Under Sidewalk Curb Drain
- Quantity: 40 Unit: LF Work Item: 4” SCH 40 PVC Conduit
- Quantity: 5850 Unit: SF Work Item: Rubber Surfacing
- Quantity: 25 Unit: EA Work Item: 12”x12” Atrium Grated Inlet with Geotextile Fabric
- Quantity: 1 Unit: EA Work Item: Catch Basin
- Quantity: 20 Unit: LF Work Item: 4” SDR -35 PVC Storm Drain
- Quantity: 1 Unit: EA Work Item: 24” Diameter Dry Well
- Quantity: 1 Unit: LS Work Item: 96” Diameter Underground Infiltration Chambers
- Quantity: 1 Unit: LS Work Item: 60” Diameter Underground Infiltration Chambers
- Quantity: 1 Unit: LS Work Item: 4’ x 8’ Water Quality Pretreatment Chamber
- Quantity: 1 Unit: LS Work Item: 10’ Diameter Water Quality Pretreatment Chamber
- Quantity: 830 Unit: LF Work Item: 6” SDR -35 PVC Storm Drain
- Quantity: 224 Unit: LF Work Item: 24” SDR -35 PVC Storm Drain
- Quantity: 84 Unit: LF Work Item: 1” Water Line
- Quantity: 1 Unit: EA Work Item: 1” Ball Valve
- Quantity: 1 Unit: LS Work Item: 1” Domestic Meter
- Quantity: 1 Unit: LS Work Item: 2” Irrigation Meter
- Quantity: 1 Unit: EA Work Item: 2” Reduced Pressure Backflow Preventer (RPBD)
- Quantity: 1 Unit: EA Work Item: Drinking Fountain
- Quantity: 1 Unit: LS Work Item: Construction Permits (Allow $50,000)
- Quantity: 2 Unit: EA Work Item: Project Advertisement Sign
- Quantity: 1 Unit: LS Work Item: Shade Sail Structure - Playground
- Quantity: 1 Unit: LS Work Item: Skate Park
- Quantity: 1 Unit: LS Work Item: Fitness Equipment
- Quantity: 1 Unit: LS Work Item: Play Equipment
- Quantity: 1 Unit: LS Work Item: Basketball Court Marking and Striping
- Quantity: 2 Unit: EA Work Item: Basketball Court Pole, Backboard and Net
- Quantity: 2 Unit: EA Work Item: Goalpher Soccer Goal
- Quantity: 50 Unit: LF Work Item: 6" Wide Concrete Curb at Rubber Surfacing
- Quantity: 11 Unit: EA Work Item: 6' Bench
- Quantity: 5 Unit: EA Work Item: Table and Chairs Set
- Quantity: 1 Unit: EA Work Item: Bike Rack
- Quantity: 5 Unit: EA Work Item: Trash Receptacle
- Quantity: 730 Unit: SF Work Item: Stabilized Decomposed Granite Material
- Quantity: 2 Unit: EA Work Item: Signage - Park Regulation
- Quantity: 1 Unit: LS Work Item: Park Lights and Lighting System
- Quantity: 1 Unit: LS Work Item: Site Fence and Swing Gates
- Quantity: 43 Unit: EA Work Item: Planting - Trees (24" Box)
- Quantity: 16940 Unit: SF Work Item: Planting Area (Shrubs and Ground Cover)
- Quantity: 3660 Unit: SF Work Item: Marathon Turf
- Quantity: 172 Unit: CY Work Item: 3” Thick Wood Mulch
- Quantity: 22960 Unit: SF Work Item: Soil Preparation and Amendment
- Quantity: 1 Unit: LS Work Item: Irrigation System
- Quantity: 1 Unit: LS Work Item: 90 Calendar Days Landscape and Irrigation Maintenance
- Quantity: 1 Unit: LS Work Item: As-Built Plans ($5,000)
- Quantity: 1 Unit: LS Work Item: Security System (Allow $75,000)
- Quantity: 105 Unit: LF Work Item: 8’-0” Concrete Block Wall
- Quantity: 85 Unit: LF Work Item: 3’-6” Concrete Block Wall with Fence
- Quantity: 1 Unit: LS Work Item: Water Quality Bio retention Basins
- Quantity: 1 Unit: LS Work Item: Stormwater Pollution Prevention Plan (SWPPP) - Risk Level 2
- Quantity: 1 Unit: LS Work Item: Shade Sail Structure – Fitness Equipment (Add-Alternate 1)
- Quantity: 1 Unit: LS Work Item: 3D Learning Elements (Add-Alternate 2)
- Quantity: 1 Unit: LS Work Item: Restroom Building (Add-Alternate 3)
- Quantity: 25 Unit: LF Work Item: 3” SDR -35 PVC Sewer Pipe with Clean Out (For Rest Room Add-Alternate 3)
- Quantity: 114 Unit: LF Work Item: 1 ½” Water Line (For Rest Room Add Alternate 3)
NAICS Classification
237310 – Highway, Street, and Bridge Construction (for pavement removal and replacement, subgrade work, curbing), 237110 – Water and Sewer Line and Related Structures Construction (for utility connections, site drainage, stormwater capture, infiltration chambers, water lines), 237130 – Power and Communication Line and Related Structures Construction (for site lighting infrastructure, conduits, power poles), 238910 – Site Preparation Contractors (for excavation, grading, clearing and grubbing), 238110 – Poured Concrete Foundation and Structure Contractors (for Portland cement concrete elements like sidewalks, pavements, basketball courts, concrete structures), 238990 – All Other Specialty Trade Contractors (for fencing, rubber surfacing, shade sail structures, skate park components, fitness equipment, park benches, tables, bike racks, trash receptacles, signage, block walls, 3D learning elements, restroom building, ground cover), 561730 – Landscaping Services (for tree and tree root removal, planting, irrigation, soil preparation, mulching, weed control, turf, landscape maintenance), 238210 – Electrical Contractors (for park lights and lighting system, electrical system installation)
Records and Due Date
This bid opportunity was entered into BidAmerica on December 10, 2025, and was last updated on December 9, 2025. All bids and/or proposals are due on December 23, 2025.
Contractors may log in or create a free BidAmerica account to view full project documents, plans, specifications, addenda, submission requirements, and more project details issued by Santa Ana City.
Legal Disclaimer
All bidders are responsible for reviewing and verifying all official bid documentation directly from the issuing agency. BidAmerica aggregates public bid information for advertisement purposes for contractors and government agencies convenience. This Notice of Invitation to Bid is for reference purposes only and is not an official or complete representation of any documents issued by Santa Ana City. BidAmerica does not guarantee the accuracy, completeness, or timeliness of any information displayed and shall not be held liable for any errors, omissions, misinterpretations, or damages resulting from reliance on this summary. Contractors must obtain all official information—including plans, specifications, addenda, deadlines, submission requirements, qualifications, and bidding conditions—directly from Santa Ana City prior to bidding.